All Projects

Showing 1 - 39 of 39 | Export projects
Recipient
Houston Engineering
2016 Fiscal Year Funding Amount
$4,953
Fund Source

The goal of this project is to address public comments on the public noticed draft Watershed Restoration & Protection Strategy (WRAPS) study and Total Maximum Daily Load (TMDL) report for the watershed, and to produce a final draft WRAPS study and TMDL report ready for final approval by the United States Environmental Protection Agency (USEPA) and Minnesota Pollution Control Agency (MPCA).

Recipient
LimnoTech
2015 Fiscal Year Funding Amount
$154,020
2016 Fiscal Year Funding Amount
$6,915
Fund Source

The goal of this project is to apply the Hydrological Simulation Program FORTRAN (HSPF) model to evaluate scenarios to support potential management actions and implementation in the watershed, construct Total Maximum Daily Load (TMDL) studies, and to develop a conceptual site model of the lakes for understanding phosphorus release.

Recipient
Funding is awarded to projects selected by the evaluation committee. This is a competitive process.
2019 Fiscal Year Funding Amount
$662,000
2018 Fiscal Year Funding Amount
$663,000
2017 Fiscal Year Funding Amount
$787,000
2016 Fiscal Year Funding Amount
$788,000
2015 Fiscal Year Funding Amount
$1,100,000
2014 Fiscal Year Funding Amount
$1,000,000
2013 Fiscal Year Funding Amount
$1,050,000
2012 Fiscal Year Funding Amount
$1,050,000
Fund Source

The  goals of the program are to evaluate the effectiveness of agricultural conservation practices, identify underlying processes that affect water quality, and develop technologies to target critical areas of the landscape. Funded projects provide current and accurate scientific data on the environmental impacts of agricultural practices and help to develop or revise agricultural practices that reduce environmental impacts while maintaining farm profitability.

Recipient
Tetra Tech
2016 Fiscal Year Funding Amount
$93,637
Fund Source

The goal of this project is to construct, calibrate, and validate one fine-scale Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Duluth Watershed Restoration and Protection Strategy (WRAPS) project area for the simulation period 1995–2012. In addition, an existing condition (post-2012 flood) model scenario will be developed for use in WRAPS development. The contractor will produce HSPF models that can readily be used to provide information to support conventional parameter TMDLs.

Recipient
Metropolitan Council/Barr Engineering Company
2014 Fiscal Year Funding Amount
$5,429
2015 Fiscal Year Funding Amount
$44,493
2016 Fiscal Year Funding Amount
$11,831
Fund Source

The State Fiscal Year 2014-2015 Clean Water Fund appropriation identified the northeast metro as an area where potential solutions are needed to address emerging water supply issues. Three projects are underway to identify the advantages and disadvantages of combining water supply systems, using new water supply sources such as treated water from Saint Paul Regional Water Services or raw water from the Mississippi or St. Croix rivers, and optimizing groundwater pumping to protect water levels in White Bear Lake and other lakes across the northeast metro.

Recipient
RESPEC
2016 Fiscal Year Funding Amount
$39,967
Fund Source

The goal of this project is to refine the segmentation, extend the simulation period, and recalibrate an existing Hydrologic Simulation Program FORTRAN (HSPF) watershed model for the Rum River Watershed.

Recipient
LimnoTech
2016 Fiscal Year Funding Amount
$62,280
Fund Source

The goal of this project is to prepare a draft Lake Pepin Total Maximum Daily Load (TMDL) Report. Lake Pepin is impaired by high levels of nutrients that cause excessive growth of algae.

Recipient
Emmons & Oliver Resources (EOR)
2016 Fiscal Year Funding Amount
$23,900
Fund Source

This project is to finalize the Total Maximum Daily Loads (TMDLs) and Watershed Restoration & Protection Strategies (WRAPS) for the Red Eye and Long Prairie Watersheds.

Recipient
Tetra Tech
2016 Fiscal Year Funding Amount
$48,995
Fund Source

This project will develop draft Total Maximum Daily Load (TMDL) studies addressing seven impaired lakes in the Lower Minnesota River Watershed (Fish, Pike, O’Dowd, Thole, Schneider, Titlow and Cleary Lakes). TMDLs will describe the impairment in each lake and water quality targets, and will include a phosphorus source assessment, a lake response model and supporting report components that document assumptions and methodologies, and a TMDL equation with completed load allocations, wasteload allocations, and margin of safety for each impairment.

Recipient
Barr Engineering-Minneapolis
2016 Fiscal Year Funding Amount
$53,994
Fund Source

The goal of this project is to develop draft Total Maximum Daily Load (TMDL) computations for six impaired lakes and two impaired streams, and to provide TMDL development documentation for selected draft TMDL report sections.

Recipient
Mahnomen County Historical Society
2016 Fiscal Year Funding Amount
$5,120
To microfilm Mahnomen County and Tribal newspapers to make primary records more accessible to the public.
Recipient
Wenck Associates, Inc.
2016 Fiscal Year Funding Amount
$39,912
Fund Source

The goal of this project is to develop Total Maximum Daily Load (TMDL) allocations and complete a final draft TMDL report for the 29 stream impairments listed in the Missouri River Basin. The project will produce completed models and pollutant source assessments for each impairment parameter, and a draft TMDL report that summarizes results of these analyses and TMDL allocations for each stream.

Recipient
Aqua Lux Lucis, Inc.
2016 Fiscal Year Funding Amount
$5,000
Fund Source

Using data supplied by Minnesota Pollution Control Agency (MPCA), this project will model the relationship between sulfate and sulfide in wild rice habitats.

Recipient
Emmons & Oliver Resources (EOR)
2016 Fiscal Year Funding Amount
$7,329
Fund Source

This project will address United States Environmental Protection Agency (USEPA) comments on the Preliminary Draft Total Maximum Daily Load (TMDL) study and Minnesota Pollution Control Agency (MPCA) comments on the pre-public notice draft Watershed Restoration & Protection Strategy (WRAPS) report, and produce Public Notice Draft TMDL study and Public Notice Draft WRAPS report ready for public review and comment.

Recipient
Tetra Tech
2016 Fiscal Year Funding Amount
$80,000
Fund Source

The goal of this project is to construct, calibrate, and validate a Hydrologic Simulation Program FORTRAN (HSPF) watershed model for the Otter Tail watershed. The contractor will produce a HSPF watershed model application(s) that can readily be used to provide information to support conventional parameter Total Maximum Daily Loads (TMDLs). The contractor will clearly demonstrate that this model generates predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen that are consistent with available sets of observed data.

Recipient
Emmons & Oliver Resources (EOR)
2016 Fiscal Year Funding Amount
$4,953
Fund Source

This project will review comments received for the Pope County Eight Lakes Total Maximum Daily Load (TMDL) and prepare responses to comments.

Recipient
Laura Phillips-Mao
2016 Fiscal Year Funding Amount
$3,400
Fund Source

The goal of this project is the development of a model of wild rice population dynamics, using RAMAS software, which mimics natural variability of population levels and calculates the probability of population extinction.

Recipient
RESPEC
2016 Fiscal Year Funding Amount
$99,991
Fund Source

The goal of this project is to construct, calibrate, and validate a watershed model using the Hydrological Simulation Program FORTRAN (HSPF) model for the Upper/Lower Red Lake Watershed. The contractor will produce an HSPF model that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) Studies. The model will generate predicted output for hydrology, sediment, nutrients, and dissolved oxygen that is consistent with observed data.

Recipient
Metropolitan Council/HDR
2014 Fiscal Year Funding Amount
$23,304
2015 Fiscal Year Funding Amount
$403,182
2016 Fiscal Year Funding Amount
$95,060
Fund Source

The Metropolitan Council, in conjunction with HDR Engineering, Inc. consultants, will evaluate a variety of approaches to develop sustainable water supplies across the metro area. Subregional study areas are being selected where multiple communities face potential problems with the long-term sustainability of current water supplies, and where community stakeholders have expressed interest in learning more about sustainable water supply options.

Recipient
Metropolitan Council/Barr Engineering Company
2015 Fiscal Year Funding Amount
$47,487
2016 Fiscal Year Funding Amount
$1,905
Fund Source

As the Metropolitan Council updated the Twin Cities Metropolitan Area Master Water Supply Plan, stakeholders asked the Council to consider the sustainable limits of the region’s water sources. The Council’s most important analytical tool is a regional groundwater flow model (Metro Model 3), which can be used to quantify the long-term regional impacts caused by hundreds of independent groundwater appropriations.

Recipient
SRF Consulting
2016 Fiscal Year Funding Amount
$4,589
Fund Source

This work will determine the feasibility of alternatives to monitor roadside swales.

Recipient
Multiple public water systems
2013 Fiscal Year Funding Amount
$250,000
2015 Fiscal Year Funding Amount
$250,000
2016 Fiscal Year Funding Amount
$113,000
2018 Fiscal Year Funding Amount
$250,000
Fund Source

Approximately 70 percent of all Minnesotans rely on groundwater as their primary source of drinking water. Wells used for drinking water must be properly sealed when removed from service to protect both public health and Minnesota’s invaluable groundwater resources. The Minnesota Department of Health protects both public health and groundwater by assuring the proper sealing of unused wells.
Clean Water funds are being provided to well owners as a 50% cost-share assistance for sealing unused public water-supply wells.

Recipient
Boomerang Bar
2016 Fiscal Year Funding Amount
$3,092
Fund Source
Install treatment - nitrate reduction system
Recipient
Osage Bait and Tackle
2016 Fiscal Year Funding Amount
$5,947
Fund Source
Construct new well; Seal 3 unused wells on property Construct new well
Recipient
Lutsen Resort Sea Villas
2016 Fiscal Year Funding Amount
$6,446
Fund Source
Construct new well
Recipient
Camp Butwin
2016 Fiscal Year Funding Amount
$2,111
Fund Source
Seal unused well
Recipient
Wildview Lodge Resort
2016 Fiscal Year Funding Amount
$4,400
Fund Source
Construct new well; Seal existing well
Recipient
Bimbo's Octagon
2016 Fiscal Year Funding Amount
$3,252
Fund Source
Construct a new well; Seal existing well
Recipient
Lutsen Resort Sea Villas
2016 Fiscal Year Funding Amount
$2,275
Fund Source
Sealing Well
Recipient
Country Prime Time
2016 Fiscal Year Funding Amount
$664
Fund Source
Relocate pressure tank to safe environment
Recipient
Sugarloaf Cove
2016 Fiscal Year Funding Amount
$600
Fund Source
Seal a well
Recipient
Tiny's Tavern
2016 Fiscal Year Funding Amount
$2,997
Fund Source
Replace water softening system and add nitrate reduction system.
Recipient
Woods Lake Park Water
2016 Fiscal Year Funding Amount
$2,932
Fund Source
Construct new well
Recipient
Wenck Associates, Inc.
2016 Fiscal Year Funding Amount
$24,940
Fund Source

This project will develop Total Maximum Daily Load (TMDL) allocations and complete a final draft TMDL report for the five lake impairments listed for the South Fork Crow River Watershed.

Recipient
Metropolitan Council/Barr Engineering Company/City of Saint Paul
2015 Fiscal Year Funding Amount
$92,629
2016 Fiscal Year Funding Amount
$100,000
Fund Source

The Metropolitan Council and City of Saint Paul cooperated on a rainwater harvesting and reuse system in downtown Saint Paul. Rainwater from the northern half (2 acres) of the roof at the new Metro Transit Green Line Operations and Maintenance Facility (OMF) is captured using a modified version of the existing OMF rainwater collection system. The existing collection system was re-designed to convey rainwater to the new Lowertown Ballpark, home of the Saint Paul Saints, where uses include ball field irrigation and toilet flushing.

Recipient
RESPEC
2016 Fiscal Year Funding Amount
$68,505
Fund Source

This project will extend the simulation period for the Hydrological Simulation Program - FORTRAN (HSPF) models for the Grand Rapids, Brainerd, Crow Wing, Redeye, Long Prairie, Sartell, Sauk, St. Cloud, and Crow watersheds, and review and comment on the calibration.

Recipient
RESPEC
2016 Fiscal Year Funding Amount
$71,525
Fund Source

This project will extend, calibrate, and validate watershed models using the Hydrological Simulation Program - FORTRAN (HSPF) watershed model for the Mississippi Headwaters, Leech Lake, Pine, and South Fork Crow Watersheds.

Recipient
RESPEC
2016 Fiscal Year Funding Amount
$79,972
Fund Source

The goal of this project is to calibrate, and validate three watershed models using the Hydrological Simulation Program FORTRAN (HSPF) model. The contractor will produce HSPF watershed models that can be further developed to provide information to support conventional parameter TMDLs. The contractor will clearly demonstrate that the models generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.

Recipient
Metropolitan Council/CDM Smith
2015 Fiscal Year Funding Amount
$50,005
2016 Fiscal Year Funding Amount
$4,990
Fund Source

The Metropolitan Council, in conjunction with CDM Smith consultants, undertook a project to collect and disseminate data regarding water costs and conservation programs in the seven-county metropolitan area, including:

• Evaluating all water rate structures of the communities in the seven-county metro area. The information on rates by community is correlated with community per capita values, peaking ratios, and other water use characteristics.

• Evaluating all water conservation programs in the communities in the seven-county metro area.