All Projects

Showing 1 - 40 of 50 | Export projects
Recipient
Chippewa River Watershed Project
2013 Fiscal Year Funding Amount
$136,325
Fund Source

This project will work with the MPCA to conduct watershed pollutant load monitoring at four sites in the Chippewa River watershed and one site in the neighboring Pomme de Terre River watershed . The Chippewa River Watershed Project (CRWP) team will also aid the MPCA in measuring and comparing regional differences and long-term trends in water quality. The goal is to collect quality data and complete load calculations for the five sites using the MPCA's established protocols.

Recipient
Chippewa County
2011 Fiscal Year Funding Amount
$286,113
Fund Source

This project will complete a comprehensive and sustainable Major Watershed Restoration and Protection Strategies report for the Chippewa River, its tributary streams, and the many lakes in the Chippewa River watershed that is understandable and adoptable by local units of government and residents.

Recipient
Chippewa River Watershed Project
2015 Fiscal Year Funding Amount
$296,965
Fund Source

The goal of the Chippewa River Watershed Protection project is to protect unimpaired areas of the watershed. This will be accomplished through education and outreach with landowners and through implementation of best management practices.

Recipient
Tetra Tech
2017 Fiscal Year Funding Amount
$80,038
Fund Source

This project will conduct a 2017 revision of the South Fork Crow River, North Fork Crow River and Sauk River Watershed Hydrological Simulation Program FORTRAN (HSPF) models and review of the Pine River Watershed HSPF model.

Recipient
Wenck Associates, Inc.
2012 Fiscal Year Funding Amount
$29,872
Fund Source

This project willl complete a final TMDL document that will be submitted to EPA for approval. Document will include Lake Osakis, Clifford Lake, Faille Lake, and Smith Lake impairments. A final technical memorandum describing the elements of the model framework and any deviations from the recommended construction methodology will be also be provided with the submission of the watershed models.

Recipient
Tetra Tech, Inc.
2012 Fiscal Year Funding Amount
$4,999
Fund Source

This project will develop and execute three point source related scenarios for the Chippewa River watershed using an existing HSPF watershed model. This project will also support the review of the HSPF Modeling Guidance Document.

Recipient
RESPEC
2012 Fiscal Year Funding Amount
$49,996
Fund Source

This project will finalize HSPF watershed model construction by incorporating internal phosphorus loading in modeled lakes, run a suite of implementation scenarios and generate a GenScn project containing model output. The consultant will produce HSPF watershed models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will deliver all modeling files for baseline and implementation scenarios and provide a GenScn project containing model output.

Recipient
Minnesota River Board
2012 Fiscal Year Funding Amount
$91,691
Fund Source

This project will support a civic engagement cohort that will be offered in southwest Minnesota to foster partnering and build capacity of local government, organizations, and residents for effective civic engagement in water protection and restoration. This project will also build networks and the skill set of local resource professionals to do effective civic engagement work for water restoration and protection. The cohort will be administered through the Minnesota River Board (MRB), established in 1995 with a goal of focusing water management efforts on the local level.

Recipient
Emmons & Olivier Resources
2013 Fiscal Year Funding Amount
$99,355
Fund Source

This project will complete a pollutant source identification and subwatershed information report and support the development of a Draft Restoration and Protection Plan (RAPP). It will also support the devlopment of a Implementation Plan that will identify target areas for BMP implementation for bacteria reductions.

Recipient
Wenck Associates, Inc.
2013 Fiscal Year Funding Amount
$1,879
Fund Source

This project will support the completion of a final draft Total Maximum Daily Load (TMDL) document for the Osakis, Smith and Faille Lakes TMDL and the submittal to EPA for final approval.

Recipient
Pomme de Terre River Association
2013 Fiscal Year Funding Amount
$216,600
Fund Source

This project will allow for outreach programs to engage interested citizens in protecting 200 acres of riparian buffer in the headwaters of the watershed, accounting for 1860 tons of sediment prevented from reaching surface waters each year the practices remain in place. The desired outcome would include 30 or more participants in the program, and to develop a more extensive volunteer base.

Recipient
Crow Wing Soil and Water Conservation District
2014 Fiscal Year Funding Amount
$20,442
Fund Source

This leadership workshop series will provide the participants (citizen leaders) with knowledge, skills, processes and tools that can help to strengthen their current efforts and nurture new ones.

Recipient
Board of Water & Soil Resources
2012 Fiscal Year Funding Amount
$600,000
2013 Fiscal Year Funding Amount
$397,580
Fund Source

BWSR will administer funding to eligible County projects that provide funds and other assistance to low income property owners to upgrade or replace Noncompliant Septic Systems. BWSR will also manage annual reporting completed by each County.

Recipient
RESPEC
2011 Fiscal Year Funding Amount
$96,618
Fund Source

This project will support construction of three watershed framework models built using the Hydrologic Simulation Program FORTRAN (HSPF). These executable models will simulate hydrology at the subbasin scale. An HSPF model will be built for each of three major watersheds: the Crow River/North Fork Crow River, the South Fork Crow River, and the Sauk River.

Recipient
AQUA TERRA Consultants
2011 Fiscal Year Funding Amount
$99,950
Fund Source

This project will support construction of three watershed framework models built using the Hydrologic Simulation Program FORTRAN (HSPF). These executable models will simulate hydrology at the subbasin scale. An HSPF model will be built for each of these major watersheds: Crow Wing River, Redeye River, and Long Prairie River.

Recipient
RESPEC
2011 Fiscal Year Funding Amount
$149,677
Fund Source

This project will finalize HSPF watershed model construction and complete the calibration/validation process for the following three watersheds: North Fork Crow River, South Fork Crow River, and Sauk River.

Recipient
Aqua Terra Consultants
2012 Fiscal Year Funding Amount
$120,238
2013 Fiscal Year Funding Amount
$134,980
Fund Source

This project will continue HSPF watershed model construction beyond the initial framework development. The consultant will add representation of point source discharges to the model. The consultant will also compile flow data for the purposes of calibration and validation. Finally, an initial hydrologic calibration will be performed and submitted for approval.

Recipient
RESPEC
2014 Fiscal Year Funding Amount
$128,887
Fund Source
The goal of this project is to extend the existing HSPF models through 2012 in the Chippewa Watershed (07020005) and Hawk-Yellow Medicine Watershed (07020004) to incorporate recent monitoring data to support current MPCA business needs and sediment source investigations.
Recipient
RESPEC
2011 Fiscal Year Funding Amount
$214,963
Fund Source

This project will complete spatial and temporal revisions of 6 Hydrologic Simulation Program FORTRAN (HSPF) models, the recalibration and validation of 7 watershed HSPF models, and the revision of the drainage network and point source representation of the Pomme de Terre HSPF model.

Recipient
Tetra Tech
2015 Fiscal Year Funding Amount
$100,000
Fund Source

The Minnesota River Basin Hydrological Simulation Program FORTRAN (HSPF) models, which simulate flow and pollutant transport, need to be refined to be consistent with the most recent external sources of land use, hydrologic response, and surface flow attributions. The primary goal of this work is to refine the hydrologic calibration in the Minnesota River basin.

Recipient
Tetra Tech
2015 Fiscal Year Funding Amount
$99,998
Fund Source

The Minnesota River Basin Hydrological Simulation Program FORTRAN (HSPF) models simulate sediment erosion and transport, however these models periodically need to be adjusted to be consistent with the most recent sources of information regarding sediment distribution and loading rates. The goal of this project is to refine the sediment source partitioning and simulation in the Minnesota River basin using all relevant available sources of information.

Recipient
Emmons & Oliver Resources (EOR)
2015 Fiscal Year Funding Amount
$36,993
Fund Source

Update previous draft Total Maximum Daily Load (TMDL) documents and modeling files with Environmental Protection Agency (EPA) comments and site specific standards.

Recipient
AECOM, Inc.
2010 Fiscal Year Funding Amount
$35,000
Fund Source

Phase 4 of the Lake Winona Total Maximum Daily Load (TMDL) project will finalize the draft Lake Winona TMDL, dated November 2009, by completing additional data analysis, lake quality modeling, updating the TMDL report, and supporting the public involvement process.

Recipient
Stevens Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$13,986
Fund Source

This project will complete data collection on 11 lakes over a 2 year period in the Pomme de Terre Watershed. The data collected will be be used in the Major Watershed Project proposed for this watershed.

Recipient
Emmons & Oliver Resources (EOR)
2016 Fiscal Year Funding Amount
$23,900
Fund Source

This project is to finalize the Total Maximum Daily Loads (TMDLs) and Watershed Restoration & Protection Strategies (WRAPS) for the Red Eye and Long Prairie Watersheds.

Recipient
Emmons & Olivier Resources (EOR)
2014 Fiscal Year Funding Amount
$77,128
Fund Source

The goal of this project is to develop a Total Maximum Daily Load (TMDL) for all impaired stream reaches and lakes within the Long Prairie and Red Eye Watersheds.

Recipient
Douglas Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$78,450
Fund Source

This project will gather watershed data to support the development of a Watershed Restoration and Protection Strategy with parameter-specific targets that will maintain or improve water quality for the Long Prairie River Watershed. This project will also provide an important framework for civic and citizen engagement and communication, contributing to long-term public participation in surface water protection and restoration activities throughout the watershed.

Recipient
Sauk River Watershed District
2012 Fiscal Year Funding Amount
$65,000
Fund Source

This Sauk River Watershed District project will conduct the Whitney Park river clean-up, adopt a river program and other community events as part of their healthy living programs; will collaborate with the city of St. Cloud to install a rain garden demonstration site at Whitney Park; use local radio and public television stations to promote the District’s “neighborhood rain garden initiative” and other incentive programs.

Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$68,033

This project addresses five reaches of the Minnesota River that have aquatic recreation impairments as identified by high concentrations of E. coli. The project will describe the water quality impairments, complete pollutant source assessments, establish loading capacities and allocations for the impairments, and develop implementation strategies.

Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$68,033
Fund Source

This project addresses five reaches of the Minnesota River that have aquatic recreation impairments as identified by high concentrations of E. coli. The project will describe the water quality impairments, complete pollutant source assessments, establish loading capacities and allocations for the impairments, and develop implementation strategies.

Recipient
LimnoTech
2014 Fiscal Year Funding Amount
$29,730
Fund Source

Refinement of the Sediment Recution Strategy through incorporation of feedback gather during 30-day comment period.

Recipient
Minnesota Pollution Control Agency
2011 Fiscal Year Funding Amount
$3,521,699
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities.

Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support.

Recipient
Minnesota Pollution Control Agency
2014 Fiscal Year Funding Amount
$1,000,000
2015 Fiscal Year Funding Amount
$1,000,000
Fund Source

The goal of this project is to analyze and document database architecture, platform, table structures, systems and data fields at six Minnesota agencies (Board of Soil and Water Resources, Department of Natural Resources, MN Department of Agriculture, MN Department of Health, Metropolitan Council, and MN Pollution Control Agency) for 30+ databases related to water.

Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$109,928
Fund Source

The goal of this project is to refine the nutrient and algae simulation in the Minnesota River basin using all relevant available sources of information. The outcome of this work order is a revised Hydrological Simulation Program – FORTRAN (HSPF) watershed model application for the Minnesota River basin that correctly represents nutrient sources and algae.

Recipient
Pomme de Terre River Association
2017 Fiscal Year Funding Amount
$52,000
Fund Source

This project will establish a framework with the Pomme de Terre River Association (PDTRA), county staff, Soil and Water Conservation District staff, and state agencies that will outline their involvement throughout the development of the Watershed Restoration and Protection Strategy (WRAPS) for the Pomme de Terre River watershed. This work will form the basis to establish restoration and protection strategies that local governments and watershed organizations can use to make decisions that will lead to protecting and restoring the waters in the watershed.

Recipient
Pomme de Tere River Association
2017 Fiscal Year Funding Amount
$46,133
Fund Source

The Pomme de Terre River Association will partner with the Minnesota Pollution Control Agency to conduct water quality monitoring in the Pomme de Terre River Watershed. The purpose will be to determine if waters meet the states non-point source pollution standards. The data collected will be utilized to produce the cycle two Watershed Restoration and Protection Strategy (WRAPS) report and supporting documents for the watershed. Through the utilization of this funding a total of 11 lakes and 7 stream reaches will be assessed.

Recipient
RESPEC
2017 Fiscal Year Funding Amount
$19,996
Fund Source

The goal of this project is to extend through 2016, calibrate, and validate the existing watershed model using Hydrological Simulation Program FORTRAN (HSPF) for the Pomme de Terre River Watershed. The contractor will produce an HSPF model that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) studies.

Recipient
Stevens Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$132,120
Fund Source

Certain stretches of the Pomme de Terre River have been identified as impaired. This project will quantify the reductions in pollutant loading that would be necessary to bring water quality in the impaired stretches to an acceptable level. It will also identify strategies that would improve water quality in these impaired stretches. Some funds will support public input activities into the Pomme de Terre River watershed management plan.

Recipient
Emmons & Olivier Resources, Inc.
2013 Fiscal Year Funding Amount
$2,034
Fund Source

The goal of this project is to respond to public comments on the Pope County Eight Lakes TMDL and make appropriate changes where necessary.

Recipient
Emmons and Olivier Resources, Inc. (EOR)
2011 Fiscal Year Funding Amount
$25,443
Fund Source

This project will develop feasibility analysis, a drawdown plan for Malmedal Lake and an analysis of available options for fish barriers in the watersheds of Malmedal Lake and Strandness Lake.