All Projects

Showing 1 - 19 of 19 | Export projects
Recipient
Aitkin County Soil and Water Conservation District
2016 Fiscal Year Funding Amount
$25,526
Fund Source

The Aitkin County Soil and Water Conservation District will partner with the Minnesota Pollution Control Agency and local volunteers to conduct water quality monitoring in high priority areas of the Upper Mississippi River (Brainerd) Watershed. Four lakes will be sampled, including Sheriff, Rabbit, French, and Section Twelve. Four stream/river sites will be monitored including the Rice River (2 sites), Ripple River, and Sissabagama Creek. Through this effort we will obtain information that will be useful in assessing the health of this watershed.

Recipient
Crow Wing County SWCD
2016 Fiscal Year Funding Amount
$48,450
2017 Fiscal Year Funding Amount
$6,326
Fund Source

The project will include lake monitoring on seventeen lakes found in the Mississippi River - Brainerd watershed in East Central Crow Wing County (CWC). The project will be conducted in an effort to gain data on these data-deficient lakes. One of the goals of the CWC Local Comprehensive Water Plan (CWP) is to establish a countywide Comprehensive Monitoring Plan (CMP). Surface water assessment monitoring will enable state 303(d) and 305(b) assessments and provide a better understanding of these lakes.

Recipient
Crow Wing Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$45,964
Fund Source

This project will collect a complete Trophic Site Index (TSI) data set for Crow Wing County lakes and a complete data set for streams and rivers for the Intensive Monitoring Program (IMP). Crow Wing County, Cass County, Wadena County, Morrison County and Hubbard County are partnering to ensure that all target lakes and rivers within the Crow Wing River watershed are monitored efficiently.

Recipient
RESPEC
2013 Fiscal Year Funding Amount
$253,710
Fund Source

The goal of this project is to construct, calibrate, and validate five Hydrologic Simulation Program FORTRAN (HSPF) watershed models. The outcome will be HSPF models that can readily be used to provide information to support conventional parameter TMDLs. These models will generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.

Recipient
RESPEC
2014 Fiscal Year Funding Amount
$396,300
Fund Source

The goal of this project is to continue and finalize HSPF watershed model construction and complete the calibration/validation process.

Recipient
Aitkin County SWCD
2018 Fiscal Year Funding Amount
$249,945
Fund Source

Phase 2 of the Mississippi River - Brainerd Watershed Restoration and Protection Strategy (WRAPS) project will: develop the WRAPS report and the Total Maximum Daily Load (TMDL) study, which allocates pollutant load reductions for impaired waters; implement a civic engagement plan; and develop watershed modeling scenarios to help understand implementation needs in the watershed.

Recipient
Aitkin County Soil and Water Conservation District
2016 Fiscal Year Funding Amount
$44,678
Fund Source
Recipient
Minnesota Pollution Control Agency
2014 Fiscal Year Funding Amount
$297,169
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Recipient
Minnesota Pollution Control Agency
2015 Fiscal Year Funding Amount
$287,628
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Recipient
Morrison Soil and Water Conservation District
2015 Fiscal Year Funding Amount
$34,900
Fund Source

The Platte River is listed by MPCA as impaired for fish bioassessments and water temperature. It is a recreational river used by many swimmers, paddlers and flotation users. The Platte is a major tributary to the Mississippi River which is the primary drinking water supply from St. Cloud to the Gulf. The Mississippi River segment immediately below Royalton is also impaired and therefore remedial efforts above are imperative.

Recipient
Emmons & Olivier Resources (EOR)
2014 Fiscal Year Funding Amount
$9,980
Fund Source
Develop a phosphorus TMDL for Eden and Vails Lakes in the Sauk River Watershed.
Recipient
LimnoTech
2014 Fiscal Year Funding Amount
$29,932
Fund Source
The goal of this project is the continued development of an overall strategy for reduction of turbidity/TSS, with sets of sediment reduction initiatives and actions for various sources, to address the Minnesota River Turbidity TMDL and the South Metro Mississippi River TSS TMDL. The overall strategy will be used to help establish a path towards achieving the required reductions of turbidity/TSS.
Recipient
Todd County Soil and Water Conservation District
2015 Fiscal Year Funding Amount
$38,650
Fund Source

The goal of this project is to decrease nutrient loading in the lake and rivers within the Swan River Watershed. The Local Water Plan currently identifies surface water contamination and declining water clarity as a priority concern of Todd County. Agency members specifically identified the Swan River Watershed as an area of high priority for restoration efforts. Big Swan Lake is specifically mentioned for its roosting site for purple martins and for the unique wildlife resources it makes available in this subwatershed.

Recipient
Todd County Soil and Water Conservation District
2016 Fiscal Year Funding Amount
$25,877
Fund Source

The goal of this project is to conduct water quality monitoring at the ten lakes within the Todd County portions of the Mississippi River Brainerd and the one lake within the Todd County portion of the Mississippi River Sartell. Sampling will be done once per month between May 2016 and September 2016 and then again once per month May 2017 through September 2017.

Recipient
RESPEC
2016 Fiscal Year Funding Amount
$68,505
Fund Source

This project will extend the simulation period for the Hydrological Simulation Program - FORTRAN (HSPF) models for the Grand Rapids, Brainerd, Crow Wing, Redeye, Long Prairie, Sartell, Sauk, St. Cloud, and Crow watersheds, and review and comment on the calibration.

Recipient
Emmons and Olivier Resources, Inc.
2011 Fiscal Year Funding Amount
$53,000
Fund Source

This project will provide the monitoring of reaches where there are data gaps, incorporate new data and analyze relevant data, identify pollutant sources, hold a stakeholder meeting, and gather information towards the future development of a Draft Restoration (TMDL) and Protection Plan.

Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$134,960
Fund Source

The primary goal of this project is to examine the calibration and validation of recently extended Hydrological Simulation Program – FORTRAN (HSPF) watershed models for the Mississippi River-Headwaters, Mississippi River-Grand Rapids, Mississippi River-Brainerd, Mississippi River-Sartell, Mississippi River-St. Cloud, Leech Lake, Pine River, Crow Wing River, Long Prairie River, and Redeye River watersheds and revise the calibration.

Recipient
Aitkin County Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$21,391
Fund Source

This project will collect data for 8 lakes and 4 stream sites in 2010 and 2011. The lakes included in this project have little or no data, or are lakes where citizens have asked for monitoring assistance.

Recipient
Tech Sales Company
2017 Fiscal Year Funding Amount
$5,000
Fund Source

Trained staff will help assure the water chemistry data that is collected is of good quality. After the 1 day training events participants will be able to calibrate sonde water quality monitoring sensors in a lab or field setting, deploy the calibrated sonde to collect water chemistry, store sondes properly during non-field season and perform preventative maintenance or simple troubleshooting actions with the help of tech support. This will be satisfied by two different training events held in 2017.