All Projects

Showing 1 - 40 of 57 | Export projects
Recipient
Aitkin County Soil and Water Conservation District
2016 Fiscal Year Funding Amount
$25,526
Fund Source

The Aitkin County Soil and Water Conservation District will partner with the Minnesota Pollution Control Agency and local volunteers to conduct water quality monitoring in high priority areas of the Upper Mississippi River (Brainerd) Watershed. Four lakes will be sampled, including Sheriff, Rabbit, French, and Section Twelve. Four stream/river sites will be monitored including the Rice River (2 sites), Ripple River, and Sissabagama Creek. Through this effort we will obtain information that will be useful in assessing the health of this watershed.

Recipient
Itasca County Soil and Water Conservation District
2016 Fiscal Year Funding Amount
$15,365
Fund Source

"This project will meet the following goals: develop, implement, and evaluate the impacts civic engagement outcomes for the Big Fork River Watershed; create a citizen understanding of the Watershed Restoration & Protection Strategy (WRAPS) and Total Maximum Daily Load (TMDL) process and the role citizens and stakeholders can play in attaining water quality restoration and protection; provide opportunities for citizens and stakeholders to assist local partners and state agencies in developing priorities for restoration as well projects to accomplish protection of high quality waters; and

Recipient
Houston Engineering
2016 Fiscal Year Funding Amount
$4,953
Fund Source

The goal of this project is to address public comments on the public noticed draft Watershed Restoration & Protection Strategy (WRAPS) study and Total Maximum Daily Load (TMDL) report for the watershed, and to produce a final draft WRAPS study and TMDL report ready for final approval by the United States Environmental Protection Agency (USEPA) and Minnesota Pollution Control Agency (MPCA).

Recipient
LimnoTech
2015 Fiscal Year Funding Amount
$154,020
2016 Fiscal Year Funding Amount
$6,915
Fund Source

The goal of this project is to apply the Hydrological Simulation Program FORTRAN (HSPF) model to evaluate scenarios to support potential management actions and implementation in the watershed, construct Total Maximum Daily Load (TMDL) studies, and to develop a conceptual site model of the lakes for understanding phosphorus release.

Recipient
Carlton County Soil and Water Conservation District
2016 Fiscal Year Funding Amount
$24,340
Fund Source

Carlton County Soil and Water Conservation District (SWCD) and local volunteers will lead an effort to collect total phosphorus, chlorophyll-A, hardness, chloride and secchi disc transparency data for the Minnesota Pollution Control Agency (MPCA) Surface Water Assessment Grant project on the following 10 lakes: Twentynine, Bob, Bear, Little Hanging Horn, Hanging Horn, Moose, Echo, Coffee, Kettle and Merwin.

Recipient
Chippewa River Watershed Project
2016 Fiscal Year Funding Amount
$100,429
Fund Source

The Chippewa River Watershed Project (CRWP) will work with the Minnesot Pollution Control Agency (MPCA) to conduct watershed pollutant load monitoring at four sites in the Chippewa River watershed and one site in the neighboring Pomme de Terre River watershed to aid the MPCA in measuring and comparing regional differences and long-term trends in water quality. Our goal is to collect quality data and complete load calculations for five sites using the MPCA's established protocols.

Recipient
Red Lake Watershed District
2014 Fiscal Year Funding Amount
$185,473
2016 Fiscal Year Funding Amount
$100,000
Fund Source

The overall goal is to develop a Watershed Restoration and Protection Strategy (WRAPS) Report and Total Maximum Daily Load (TMDL) Study that will address water quality impairments and maintain or improve water quality throughout the Clearwater River watershed. The study will identify sources of pollutants to the streams and lakes, allocate pollution reduction goals, and prioritize and identify implementation strategies to maintain or improve water quality in key lakes and streams in the watershed.

Recipient
Crow Wing County SWCD
2016 Fiscal Year Funding Amount
$48,450
2017 Fiscal Year Funding Amount
$6,326
Fund Source

The project will include lake monitoring on seventeen lakes found in the Mississippi River - Brainerd watershed in East Central Crow Wing County (CWC). The project will be conducted in an effort to gain data on these data-deficient lakes. One of the goals of the CWC Local Comprehensive Water Plan (CWP) is to establish a countywide Comprehensive Monitoring Plan (CMP). Surface water assessment monitoring will enable state 303(d) and 305(b) assessments and provide a better understanding of these lakes.

Recipient
US Geological Survey
2016 Fiscal Year Funding Amount
$75,000
Fund Source

The Minnesota Pollution Control Agency (MPCA) has identified streamflow alteration as a key stressor on aquatic life, but the characteristics of streamflow alteration acting as stressors have not been identified in the MPCA Watershed Restoration and Protection Strategy (WRAPS) process. Without indices that characterize streamflow alteration, the MPCA cannot quantitatively associate metrics of aquatic life condition to streamflow alteration. The lack of quantifiable indices limits the ability of the MPCA to assess environmental streamflow needs for streams and rivers throughout Minnesota.

Recipient
Tetra Tech
2016 Fiscal Year Funding Amount
$93,637
Fund Source

The goal of this project is to construct, calibrate, and validate one fine-scale Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Duluth Watershed Restoration and Protection Strategy (WRAPS) project area for the simulation period 1995–2012. In addition, an existing condition (post-2012 flood) model scenario will be developed for use in WRAPS development. The contractor will produce HSPF models that can readily be used to provide information to support conventional parameter TMDLs.

Recipient
Headwaters Science Center
2016 Fiscal Year Funding Amount
$57,028
Fund Source

This project will conduct water quality monitoring at 12 stream sampling sites. The sites will be monitored for chemical, physical, and bacteriological parameters over a two year time-period. The Headwaters Science Center (HSC) will be the lead agency and arrange volunteer cooperation from Trek North, Bemidji, Perham and/or Detroit Lakes High School students and their instructors. The HSC project lead will be responsible for oversight and full compliance to MPCA protocols.

Recipient
RESPEC
2016 Fiscal Year Funding Amount
$39,967
Fund Source

The goal of this project is to refine the segmentation, extend the simulation period, and recalibrate an existing Hydrologic Simulation Program FORTRAN (HSPF) watershed model for the Rum River Watershed.

Recipient
Carlton County SWCD
2016 Fiscal Year Funding Amount
$22,175
Fund Source

Starting in 2016 the Minnesota Pollution Control Agency (MPCA) will be collecting monitoring data on many lakes and streams in the Kettle River and Upper Saint Croix Watersheds. While this information will be useful to assess the overall health of the watershed, it will miss locations in the watershed that can provide critical information to local implementers, local governments, and citizens.

Recipient
Lac qui Parle-Yellow Bank Watershed District
2016 Fiscal Year Funding Amount
$155,060
Fund Source

The primary goal of this project is to partner with stakeholders in the development of a comprehensive Watershed Restoration and Protection Strategies (WRAPS) report to be used on the local level. Achieving this goal will require sound working relationships between local government units (LGUs), watershed citizens, and state and federal government. Gathering input from these groups will be critical when the Minnesota Pollution Control Agency (MPCA) drafts a WRAPS Report that can be utilized by local decision-makers.

Recipient
Lake of the Woods SWCD
2015 Fiscal Year Funding Amount
$305,620
2016 Fiscal Year Funding Amount
$66,412
2017 Fiscal Year Funding Amount
$47,202
Fund Source

The Lake of the Woods (LOW) Total Maximum Daily Load (TMDL) study will: (1) identify water quality goals for the Minnesota portions of the LOW/Rainy River Watershed; (2) recommend nutrient allocations to achieve TMDLs where waters do not meet standards; and (3) provide opportunities for stakeholders to engage in the process of watershed-management planning to adopt protection and restoration strategies. The project will include existing in-lake and watershed model updates, TMDL component development, restoration plan development, and public participation.

Recipient
Lake of the Woods Soil and Water Conservation District
2016 Fiscal Year Funding Amount
$75,303
Fund Source

This project is to conduct water chemistry monitoring at two subwatershed sites and two major watershed sites in 2016 and 2017 based on flow conditions, targeting runoff events using protocols defined in the Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedures and Guidance. The data collected will be submitted to Minnesota Pollution Control Agency (MPCA) and used for calculating pollutant loads.

Recipient
Lake of the Woods Water Sustainability Foundation
2015 Fiscal Year Funding Amount
$500
2016 Fiscal Year Funding Amount
$500
2017 Fiscal Year Funding Amount
$500
2018 Fiscal Year Funding Amount
$500
Fund Source

The Minnesota Pollution Control Agency (MPCA) is a co-sponsor and assists with a portion of the financial support for the International Rainy River-Lake of the Woods Watershed Forum.

Recipient
LimnoTech
2016 Fiscal Year Funding Amount
$62,280
Fund Source

The goal of this project is to prepare a draft Lake Pepin Total Maximum Daily Load (TMDL) Report. Lake Pepin is impaired by high levels of nutrients that cause excessive growth of algae.

Recipient
Emmons & Oliver Resources (EOR)
2016 Fiscal Year Funding Amount
$23,900
Fund Source

This project is to finalize the Total Maximum Daily Loads (TMDLs) and Watershed Restoration & Protection Strategies (WRAPS) for the Red Eye and Long Prairie Watersheds.

Recipient
Tetra Tech
2016 Fiscal Year Funding Amount
$48,995
Fund Source

This project will develop draft Total Maximum Daily Load (TMDL) studies addressing seven impaired lakes in the Lower Minnesota River Watershed (Fish, Pike, O’Dowd, Thole, Schneider, Titlow and Cleary Lakes). TMDLs will describe the impairment in each lake and water quality targets, and will include a phosphorus source assessment, a lake response model and supporting report components that document assumptions and methodologies, and a TMDL equation with completed load allocations, wasteload allocations, and margin of safety for each impairment.

Recipient
Barr Engineering-Minneapolis
2016 Fiscal Year Funding Amount
$53,994
Fund Source

The goal of this project is to develop draft Total Maximum Daily Load (TMDL) computations for six impaired lakes and two impaired streams, and to provide TMDL development documentation for selected draft TMDL report sections.

Recipient
Upper Minnesota River Watershed District
2016 Fiscal Year Funding Amount
$228,013
Fund Source

The goal of this project is to develop a Watershed Restoration and Protection Plan (WRAPS) to be used at the local level. It will increase the number of citizens participating in education and outreach events; foster information and idea exchange around watershed issues through relationships and social networks; involve community members in crafting civic engagement activities/plans in which they feel ownership and desire to implement; and promote awareness, concern, and watershed stewardship to community organizations/institutions.

Recipient
Aitkin County Soil and Water Conservation District
2016 Fiscal Year Funding Amount
$44,678
Fund Source
Recipient
Aitkin County Soil and Water Conservation District
2016 Fiscal Year Funding Amount
$200,000
Fund Source

This project will focus on creating a watershed identity, monitoring & assessment, stressor ID assistance, Total Maximum Daily Load (TMDL) report development, Watershed Restoration & Protection Strategy (WRAPS) report development, watershed prioritization and targeting, and the continuation of the Civic Engagement components of the project. Currently, this watershed has seven listed conventional impairments (Lake Eutrophication); however, it is possible that additional stream impairments (up to four) may be identified during the IWM process.

Recipient
Morrison Soil and Water Conservation District
2016 Fiscal Year Funding Amount
$30,000
Fund Source

Phase 1 of this project is primarily geared towards project planning and coordination among project partners, developing an initial civic engagement strategic plan, holding a watershed kick-off meeting, and gathering and summarizing available water quality data.

Recipient
Minnesota Department of Natural Resources
2016 Fiscal Year Funding Amount
$13,000
Fund Source

This project will assist in assessing the quality of the Mississippi River bordering with Wisconsin in partnership with the Minnesota DNR (MNDNR), the Wisconsin DNR (WIDNR) and the Metropolitan Council of Environmental Services (MCES). Sampling will be conducted in 2016 using water chemistry and biological indicators, using a 5 state strategy recently developed recently with the leadership of the Upper Mississippi River Basin Association. The Minnesota entities will focus their work on the River from St Anthony Falls to the Chippewa River confluence in Lake Pepin.

Recipient
Wenck Associates, Inc.
2016 Fiscal Year Funding Amount
$39,912
Fund Source

The goal of this project is to develop Total Maximum Daily Load (TMDL) allocations and complete a final draft TMDL report for the 29 stream impairments listed in the Missouri River Basin. The project will produce completed models and pollutant source assessments for each impairment parameter, and a draft TMDL report that summarizes results of these analyses and TMDL allocations for each stream.

Recipient
Aqua Lux Lucis, Inc.
2016 Fiscal Year Funding Amount
$5,000
Fund Source

Using data supplied by Minnesota Pollution Control Agency (MPCA), this project will model the relationship between sulfate and sulfide in wild rice habitats.

Recipient
MInnesota Pollution Control Agency
2016 Fiscal Year Funding Amount
$567,922
2017 Fiscal Year Funding Amount
$620,426
Fund Source

This project supports monitoring and assessment activities by Minnesota Pollution Control Agency (MPCA) Environmental Outcomes staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities. The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Recipient
Minnesota Pollution Control Agency
2014 Fiscal Year Funding Amount
$33,940
2015 Fiscal Year Funding Amount
$39,346
2016 Fiscal Year Funding Amount
$47,631
2017 Fiscal Year Funding Amount
$46,084
2018 Fiscal Year Funding Amount
$50,000
Fund Source

The Clean Water Council was created through the Clean Water Legacy Act (Minn. Stat. Ch 114D) which was signed into law June 2, 2006. The council’s role is to advise on the administration and implementation of the Clean Water Legacy Act. See the Council’s FY18-19 Clean Water Fund and Policy Recommendations Report (December 1, 2016). The 28-member Clean Water Council (Council) represents organizations with a major role in achieving clean water, enabling consensus building and coordination on a wide array of issues critical to the people of Minnesota.

Recipient
Minnesota Pollution Control Agency
2014 Fiscal Year Funding Amount
$691,911
2015 Fiscal Year Funding Amount
$831,629
2016 Fiscal Year Funding Amount
$755,618
2017 Fiscal Year Funding Amount
$764,768
Fund Source

Staffing support for the development of permits that provide for implementation of Total Maximum Daily Load (TMDL) requirements at wastewater facilities and stormwater permittees.

Recipient
MInnesota Pollution Control Agency
2016 Fiscal Year Funding Amount
$275,000
2017 Fiscal Year Funding Amount
$275,000
Fund Source

This project will evaluate best management performance and effectiveness to support meeting total maximum daily loads; develop standards and incorporate state of the art guidance using minimal impact design standards as the model; and implement a knowledge and technology transfer system across local government, industry, and regulatory sectors.

Recipient
Minnesota Pollution Control Agency
2014 Fiscal Year Funding Amount
$162,243
2015 Fiscal Year Funding Amount
$171,456
2016 Fiscal Year Funding Amount
$154,632
2017 Fiscal Year Funding Amount
$394,892
Fund Source

Staffing support to evaluate the performance of existing stormwater infiltration sites, as identified in the Minimal Impact Design Standards (MIDS) project. Monitor the range of existing infiltration devices in Minnesota and compare to design criteria, maintenance records, and quantify year-round infiltration rates. Develop and refine pretreatment options and standards for municipal stormwater treatment.

Recipient
Minnesota Pollution Control Agency
2014 Fiscal Year Funding Amount
$4,105,849
2015 Fiscal Year Funding Amount
$4,173,501
2016 Fiscal Year Funding Amount
$5,309,905
2017 Fiscal Year Funding Amount
$6,028,498
Fund Source

This project supports activities by Minnesota Pollution Control (MPCA) Watershed Division staff that provide technical assistance, project oversight, coordination, outreach and other agency activities associated with assessing, listing and conducting Total Maximum Daily Load (TMDL) studies throughout the State of Minnesota. Project also includes lab analysis, equipment, and fieldwork expenses associated with TMDL work at the MPCA.

Recipient
MInnesota Pollution Control Agency
2016 Fiscal Year Funding Amount
$5,351,892
2017 Fiscal Year Funding Amount
$5,528,098
Fund Source

This project supports monitoring and assessment activities by Minnesota Pollution Control Agency (MPCA) Environmental Outcomes staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities within the described priority watersheds. Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support. Biological and Water Chemistry Stream Monitoring: Monitoring to assess the conditions of streams in each watershed.

Recipient
Minnesota Pollution Control Agency
2014 Fiscal Year Funding Amount
$1,000,000
2015 Fiscal Year Funding Amount
$1,000,000
2016 Fiscal Year Funding Amount
$784,501
2017 Fiscal Year Funding Amount
$1,215,690
Fund Source

The Minnesota Pollution Control Agency (MPCA) uses a watershed-oriented approach to assess surface water quality and define restoration and protection measures. Each of Minnesota's 81 major watersheds is assessed intensively every 10 years, based on a staggered schedule that addresses, on average, eight watersheds per year.  To increase the amount of data directly available to the public online, and to make internal operations more efficient, the MPCA started a multi-year Watershed Data Integration Project (WDIP).

Recipient
Emmons & Oliver Resources (EOR)
2016 Fiscal Year Funding Amount
$7,329
Fund Source

This project will address United States Environmental Protection Agency (USEPA) comments on the Preliminary Draft Total Maximum Daily Load (TMDL) study and Minnesota Pollution Control Agency (MPCA) comments on the pre-public notice draft Watershed Restoration & Protection Strategy (WRAPS) report, and produce Public Notice Draft TMDL study and Public Notice Draft WRAPS report ready for public review and comment.

Recipient
Tetra Tech
2016 Fiscal Year Funding Amount
$80,000
Fund Source

The goal of this project is to construct, calibrate, and validate a Hydrologic Simulation Program FORTRAN (HSPF) watershed model for the Otter Tail watershed. The contractor will produce a HSPF watershed model application(s) that can readily be used to provide information to support conventional parameter Total Maximum Daily Loads (TMDLs). The contractor will clearly demonstrate that this model generates predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen that are consistent with available sets of observed data.

Recipient
Pine County Soil and Water Conservation District
2016 Fiscal Year Funding Amount
$40,902
Fund Source

Samples will be taken from lakes and streams from the Kettle River Watershed. The sampling and monitoring of these waters will result in a better understanding of the water quality within the watershed. Having a better understanding of the water quality in the watershed can help when targeting where to put conservation projects on the ground.

Recipient
Emmons & Oliver Resources (EOR)
2016 Fiscal Year Funding Amount
$4,953
Fund Source

This project will review comments received for the Pope County Eight Lakes Total Maximum Daily Load (TMDL) and prepare responses to comments.