MSU-Mankato Water Resources Center in the Mankato area will provide conventional pollutant monitoring at the following sites: Beauford Ditch, Big Cobb River, Blue Earth River, Le Sueur River (3), Little Cobb River, Minnesota River (2), Watonwan River.
The goal of the project is to complete the dataset for the assessment of Aquatic Recreation Use in Cedar Lake by monitoring total phosphorus, chlorophyll-a, and secchi depth.
The goal of this project is to assess water quality in the following Anoka County waterbodies: Minard Lake, Pickerel Lake, Trott Brook, Seelye Brook, Cedar Creek, and the Rum River.
The goal of this project is to complete a two-year data set for physical, bacterial, and water chemistry sampling for the Intensive Watershed Monitoring Plan to aid MPCA’s assessment of the aquatic health of the Mississippi Headwaters(HUC 07010101) Watershed.
The goal of this project is to collect data, water chemistry and field parameters, which will be paired with biological data collected by the MPCA to assess water quality conditions at seven sites along targeted reaches within the Snake River Watershed and five sites in the Two River Watershed.
The primary goal of this project is to accurately collect surface water quality data to help support the MPCA’s Intensive Watershed Monitoring efforts in the Lake Superior North Watershed.
The overall goal of this project is to perform water quality monitoring duties to accomplish MPCA’s SWAG monitoring efforts at the four sites listed in Section IV of this application for the Middle Minnesota River stream sites selected in Renville, Redwood and Brown counties and allow for the assessment of aquatic life and aquatic recreation use for those reaches of the minor streams.
The goal of this project is to establish data sets to evaluate the Aquatic Recreational Use of Mallard, Sucker, and Ozawindib Lakes in southeastern Clearwater County.
This project will support the monitoring of two sites on the Cannon River throughout the field seasons of 2013 and 2014 during storm events and baseflow conditions to capture 25 samples per year at each site according to the WPLMN objectives. The information gathered from these samples and site visits will be compiled for reporting purposes and for use in calculating pollutant loading using the FLUX32 model.
This project will obtain spatial and long-term pollutant load information from the Root River watershed in Southeast Minnesota. To accomplish this, the Fillmore Soil and Water Conservation District (SWCD) will assist the MPCA with water quality monitoring and annual pollutant loading calculations. Approximately 25 grab samples will be collected/site/year at 5 sites within the Root River watershed (totaling 125 grab samples/year). Annual load calculations for each site will be determined using the FLUX32 model.
This project will work with the MPCA to conduct watershed pollutant load monitoring at four sites in the Chippewa River watershed and one site in the neighboring Pomme de Terre River watershed . The Chippewa River Watershed Project (CRWP) team will also aid the MPCA in measuring and comparing regional differences and long-term trends in water quality. The goal is to collect quality data and complete load calculations for the five sites using the MPCA's established protocols.
This project will monitor six sites within the Minnesota River Basin: Hawk Creek near Maynard, Hawk Creek near Granite Falls, Beaver Creek near Beaver Falls, Yellow Medicine River near Granite Falls, Yellow Medicine River near Hanley Falls, and Spring Creek near Hanley Falls. The sites will be monitored according to MPCA’s Major Watershed Load Monitoring Standard Operating Procedure, which is the procedure being followed for sites currently monitored by the Hawk Creek Watershed Project (HCWP).
The goal of this project is to perform water quality monitoring and load calculation duties to accomplish MPCA's Watershed Pollutant Load Monitoring Network monitoring efforts at seven sites for the Redwood and Cottonwood River watersheds as well as the Minnesota River site near Morton.
This project goal is to conduct water chemistry monitoring at seventeen stream locations, to record and submit all data collected through this process, and to provide the information necessary for the calculation of water quality pollutant loads using the FLUX32 program.
The MPCA has identified 13 stream sites in the watershed to characterize watershed water quality. This project will supplement and complement the identification of the top 50 sites in the watershed that are contributing to water impairment and also help in identification of priority watersheds in the re-write of the watershed comprehensive plan. Water samples and field measurements will be collected at each monitoring location ranging from baseline events to high flow events.
Contractor assistance with site selection, reconnaissance and obtaining access for installation of ambient groundwater monitoring wells in Ramsey county and Hennepin county. This project will provide services and oversight of the installation for up to 16 well sites.
The Aitkin County Soil and Water Conservation District will partner with the Minnesota Pollution Control Agency and local volunteers to conduct water quality monitoring in high priority areas of the Upper Mississippi River (Brainerd) Watershed. Four lakes will be sampled, including Sheriff, Rabbit, French, and Section Twelve. Four stream/river sites will be monitored including the Rice River (2 sites), Ripple River, and Sissabagama Creek. Through this effort we will obtain information that will be useful in assessing the health of this watershed.
The Aitkin County Soil and Water Conservation District will partner with the Minnesota Pollution Control Agency and local volunteers to conduct water quality monitoring in high priority areas of the Upper Mississippi River Grand Rapids Watershed. Five lakes will be sampled, including Savanna, Shumway, Loon, Hay, and Washburn. Through this effort we will obtain information that will be useful in assessing the health of this watershed. This will be valuable in planning for future restoration and protection efforts that will ensure good water and environmental quality for Aitkin County.
Peer Engineering, Inc. (Peer) will evaluate and recommend to MPCA groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration. Superfund staff will assist in the project by providing oversight of contractual requirements and provide technical assistance as needed.
Widseth Smith Nolting (WSN) will evaluate and recommend to MPCA groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration. Superfund staff will assist in the project by providing oversight of contractual requirements and provide technical assistance as needed.
Widseth Smith Nolting (WSN) will evaluate and recommend to Minnesota Pollution Control Agency (MPCA) groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration.
Contractor assistance with site selection, reconnaissance and obtaining access for installation of ambient groundwater monitoring wells in northcentral and northeastern Minnesota. This project will provide services and oversight of the installation for up to 31 well sites.
Contractor assistance with site selection, reconnaissance and obtaining access for installation of ambient groundwater monitoring wells in Minnesota. This project will provide services for up to 25 well sites.
This project will be a complete TMDL report for the Biota and Bacteria (E. coli) impairments for the Ann River Watershed. The water bodies associated with these impairments will then be removed from the MPCA’s impaired waters list, and implementation activities to restore the water bodies will begin.
To address the problems caused by invasive species, the 1991 Minnesota Legislature directed the Minnesota Department of Natural Resources (DNR) to establish the Invasive Species Program. The program is designed to implement actions to prevent the spread of invasive species and manage invasive aquatic plants and wild animals (Minnesota Statutes 84D).
The three primary goals of the DNR Invasive Species Program are to:
1. Prevent the introduction of new invasive species into Minnesota.
2. Prevent the spread of invasive species within Minnesota.
The DNR is working with local communities and an interagency team to define, prioritize, and establish groundwater management areas in Minnesota. Groundwater management areas will have increased data collection and monitoring that allow the state and local communities to understand water supplies, uses, limitations, and threats to natural resources that depend on groundwater. This information will support detailed aquifer protection plans that ensure equitable and sustainable groundwater and drinking water use for the future.
This project is studying the response of certain aquifers to groundwater pumping. Research involves an aquifer test, which is an experiment where a well is pumped at a known, constant, pumping rate; changes in groundwater levels and stream flows in the areas around the aquifer test site are observed while the well is being pumped. These tests help us understand how groundwater flows between aquifers, which are underground rock and sand layers that hold water.Understanding the interactions between shallow and deep aquifers and surface water is important for managing groundwater supplies.
This project will provide condition monitoring and problem investigation monitoring at the following sites.
Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek.
Minnesota River: Tributaries include Eagle Creek,Riley Creek, and Valley Creek tributary to the St. Croix River
This project is a continuation of Statewide Lake study that revealed the obiquitous presence of endrocrine active compounds (EACs) in many MN Lakes. The initial project findings suggested two potential knowledge gaps in our understanding of EACs and their effects in lake environments. First, the sources of EACs and their entrance points into lakes need to be better defined than was possible in our previous statewide lake study.
Great River Energy (GRE) operates a power plant in the City of Elk River which generates electricity by incinerating municipal solid wastes. The plant is located proximate to the City of Elk River wastewater treatment plant (WWTP). This project will result in a corresponding reduction of groundwater use by GRE.
The "Bigfork River Target Watershed Assessment – Lake of the Woods & Koochiching Soil and Water Conservation Districts" Project focuses on collecting water chemistry and field parameters at Bear River, Big Fork River (4 sites), Caldwell Brook and Sturgeon River. The project will support the biological assessments being completed by MPCA staff for this Target Watershed Assessment. This work will also train and develop Koochiching SWCD staff to enable them to continue water quality monitoring in the Rainy River Basin.
This project will utilize a systematic approach to identify principal sources, or “hot-spots”, of sediment contributions and work with individual landowners, county drainage officials, and municipalities to coordinate and implement critical Best Management Practices (BMP’s), establish demonstration sites, and provide education and outreach efforts. This project will also establish baseline watershed data with the addition of site specific information, and determine high priority watersheds. Appropriate practices will be identified and mapped utilizing GPS and GIS equipment and software.
This project will develop a watershed approach plan, including impaired waters allocations, for the Mustinka Watershed, located at the headwaters of the Red River of the North, in western Minnesota, lying partly in Grant, Stevens, Ottertail, Big Stone, and Traverse counties. The watershed approach plan will set water quality goals for the watershed, recommend allocations for achieving total maximum daily loads where waters do not meet state standards and are listed as impaired.
This project will work in cooperation with individual volunteers to perform grab samples and visual assessments of four waterbody sites in Brown County. The data collected will be an educational tool to inform the County’s citizens about water quality concerns. Using volunteers to collect the water quality samples and visual assessments will result in the volunteers taking personal pride and stewardship in clean water throughout the County.
Carlton County Soil and Water Conservation District (SWCD) and local volunteers will lead an effort to collect total phosphorus, chlorophyll-A, hardness, chloride and secchi disc transparency data for the Minnesota Pollution Control Agency (MPCA) Surface Water Assessment Grant project on the following 10 lakes: Twentynine, Bob, Bear, Little Hanging Horn, Hanging Horn, Moose, Echo, Coffee, Kettle and Merwin.