Showing 1 - 40 of 88 | Export projects
Recipient
Widseth Smtih Nolting
2015 Fiscal Year Funding Amount
$74,429
Fund Source

Widseth Smith Nolting (WSN) will evaluate and recommend to Minnesota Pollution Control Agency (MPCA) groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration.

Recipient
Rhithron Associates
2015 Fiscal Year Funding Amount
$155,860
Fund Source

The purpose of this project is to provide stream and large river macro invertebrate sample processing and identification for the Minnesota Pollution Control agency (MPCA) Biological Monitoring Unit.

The final product will consist of; data submitted electronically to the MPCA, project reference specification, return of all identified specimens, and an external and internal QA/QC report.

Recipient
Houston Engineering
2016 Fiscal Year Funding Amount
$4,953
Fund Source

The goal of this project is to address public comments on the public noticed draft Watershed Restoration & Protection Strategy (WRAPS) study and Total Maximum Daily Load (TMDL) report for the watershed, and to produce a final draft WRAPS study and TMDL report ready for final approval by the United States Environmental Protection Agency (USEPA) and Minnesota Pollution Control Agency (MPCA).

Recipient
LimnoTech
2015 Fiscal Year Funding Amount
$154,020
2016 Fiscal Year Funding Amount
$6,915
Fund Source

The goal of this project is to apply the Hydrological Simulation Program FORTRAN (HSPF) model to evaluate scenarios to support potential management actions and implementation in the watershed, construct Total Maximum Daily Load (TMDL) studies, and to develop a conceptual site model of the lakes for understanding phosphorus release.

Recipient
Axys Analytical Services, Ltd.
2015 Fiscal Year Funding Amount
$140,535
Fund Source

This study will test groundwater and drain tile waters at concentrated animal feedlot opperations (CAFOs) to evaluate the presence of intibiotics and hormones. Samples will be collected from monitoring wells, tile drain sumps, and tile line discharges.

Water samples will be sent to Axys Analytical Services as they are colleced from each monitoring site. A total of 18 samples will be generated in the field by pumping ultrapure water through the sampling system.

Recipient
Funding is awarded to projects selected by the evaluation committee. This is a competitive process.
2019 Fiscal Year Funding Amount
$662,000
2018 Fiscal Year Funding Amount
$663,000
2017 Fiscal Year Funding Amount
$787,000
2016 Fiscal Year Funding Amount
$788,000
2015 Fiscal Year Funding Amount
$1,100,000
2014 Fiscal Year Funding Amount
$1,000,000
2013 Fiscal Year Funding Amount
$1,050,000
2012 Fiscal Year Funding Amount
$1,050,000
Fund Source

The  goals of the program are to evaluate the effectiveness of agricultural conservation practices, identify underlying processes that affect water quality, and develop technologies to target critical areas of the landscape. Funded projects provide current and accurate scientific data on the environmental impacts of agricultural practices and help to develop or revise agricultural practices that reduce environmental impacts while maintaining farm profitability.

Recipient
Tetra Tech
2015 Fiscal Year Funding Amount
$125,000
Fund Source

The goal of this project is to construct, calibrate, and validate a Hydrological Simulation Program FORTRAN (HSPF) model for Minnesota portions of the Des Moines River watershed.

Recipient
Tech Sales Co.
2015 Fiscal Year Funding Amount
$2,000
Fund Source
This training will be for State employees who have purchased this new type of discharge measuring equipment. This training is needed to ensure that accurate and complete discharge measurements are made which is supplied to Minnesota Department of Natural Resources (DNR), Consulting firms, Local units of government, federal government and Minnesota Pollution Control Agency (MPCA) modelers.
Recipient
Western Hennepin County Pioneers Association
2015 Fiscal Year Funding Amount
$10,000
To hire a qualified professional to construct appropriate housing for a significant collections piece.
Recipient
Tetra Tech
2016 Fiscal Year Funding Amount
$93,637
Fund Source

The goal of this project is to construct, calibrate, and validate one fine-scale Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Duluth Watershed Restoration and Protection Strategy (WRAPS) project area for the simulation period 1995–2012. In addition, an existing condition (post-2012 flood) model scenario will be developed for use in WRAPS development. The contractor will produce HSPF models that can readily be used to provide information to support conventional parameter TMDLs.

Recipient
Metropolitan Council/Short Elliott Hendrickson
2014 Fiscal Year Funding Amount
$145,003
2015 Fiscal Year Funding Amount
$193,803
Fund Source

The State Fiscal Year 2014-2015 Clean Water Fund appropriation identified the northeast metro as an area where potential solutions are needed to address emerging water supply issues. The Metropolitan Council, in conjunction with S.E.H. consultants, evaluated water supply approaches to serve the northeastern part of the Twin Cities metropolitan area. A subregional study areas was selected based on the indication of potential problems with the long-term sustainability of current water supplies, as well as expressed interest by community stakeholders.

Recipient
Metropolitan Council/Barr Engineering Company
2014 Fiscal Year Funding Amount
$5,429
2015 Fiscal Year Funding Amount
$44,493
2016 Fiscal Year Funding Amount
$11,831
Fund Source

The State Fiscal Year 2014-2015 Clean Water Fund appropriation identified the northeast metro as an area where potential solutions are needed to address emerging water supply issues. Three projects are underway to identify the advantages and disadvantages of combining water supply systems, using new water supply sources such as treated water from Saint Paul Regional Water Services or raw water from the Mississippi or St. Croix rivers, and optimizing groundwater pumping to protect water levels in White Bear Lake and other lakes across the northeast metro.

Recipient
Tetra Tech
2015 Fiscal Year Funding Amount
$115,000
Fund Source
The goal of this project is to construct, calibrate, and validate two Hydrologic Simulation Program FORTRAN (HSPF) watershed models: Lake Superior North and Lake Superior -South. The contractor will produce HSPF models that can readily be used to provide information to support conventional parameter Total Maximum Daily Loads (TMDLs). The contractor will clearly demonstrate that these models generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.
Recipient
Houston Engineering
2015 Fiscal Year Funding Amount
$156,937
Fund Source

The goal of this project is to construct, calibrate, and validate two (2) watershed models using Hydrologic Simulation Program FORTRAN (HSPF).

Recipient
Tetra Tech
2015 Fiscal Year Funding Amount
$110,000
Fund Source

Construct, calibrate and validate 3 Hydrologic Simulation Program FORTRAN (HSPF) watershed models for the St Louis, Cloquet, and Nemadji River Watersheds.

Recipient
AQUA TERRA Consultants
2015 Fiscal Year Funding Amount
$199,999
Fund Source
Construct, calibrate, and validate three Hydrologic Simulation Program FORTRAN (HSPF) watershed models that can readily be used to provide information to support conventional parameter Total Maximum Daily Loads (TMDLs).
Recipient
AQUA TERRA Consultants
2015 Fiscal Year Funding Amount
$5,140
Fund Source

This project will finalize the guidance document to ensture consistency and validity of future Hydrological Simulation Program FORTRAN (HSPF) model applications within the State of MN. This improved guidance will help to ensure consistency and validity of future HSPF model applications within the State as part of the One Water Program.

Recipient
RESPEC
2016 Fiscal Year Funding Amount
$39,967
Fund Source

The goal of this project is to refine the segmentation, extend the simulation period, and recalibrate an existing Hydrologic Simulation Program FORTRAN (HSPF) watershed model for the Rum River Watershed.

Recipient
Tetra Tech
2015 Fiscal Year Funding Amount
$155,000
Fund Source

The goal of this project is to continue and finalize Hydrological Simulation Program FORTRAN (HSPF) watershed model construction and complete the calibration/validation process for the Minnesota River–Headwaters and Lac qui Parle watersheds that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) reports.

Recipient
Tetra Tech
2015 Fiscal Year Funding Amount
$100,000
Fund Source

The goal of this project is to continue and finalize Hydrological Simulation Program FORTRAN (HSPF) watershed model construction and complete the calibration/validation process. The consultants will produce HSPF watershed model applications for the Lake Superior North and Lake Superior South watersheds that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) projects.

Recipient
RESPEC
2015 Fiscal Year Funding Amount
$132,210
Fund Source

The goal of this work is to enhance the Scenario Analysis Manager (SAM) tool. These enhancements will enable point source and stressor identification staff within the state to quickly access data, facilitate their research, and develop scenarios. This work will focus on the development of SAM by creating a user friendly interface, expanding the BMP database, and improving the BMP simulation methodology including optimization functionality. Additionally, this work includes development of a HSPF validation tool, testing and QAQC, and provides documentation and training to expected users.

Recipient
Tetra Tech
2015 Fiscal Year Funding Amount
$100,000
Fund Source

The Minnesota River Basin Hydrological Simulation Program FORTRAN (HSPF) models, which simulate flow and pollutant transport, need to be refined to be consistent with the most recent external sources of land use, hydrologic response, and surface flow attributions. The primary goal of this work is to refine the hydrologic calibration in the Minnesota River basin.

Recipient
Tetra Tech
2015 Fiscal Year Funding Amount
$99,998
Fund Source

The Minnesota River Basin Hydrological Simulation Program FORTRAN (HSPF) models simulate sediment erosion and transport, however these models periodically need to be adjusted to be consistent with the most recent sources of information regarding sediment distribution and loading rates. The goal of this project is to refine the sediment source partitioning and simulation in the Minnesota River basin using all relevant available sources of information.

Recipient
RESPEC
2015 Fiscal Year Funding Amount
$96,516
Fund Source

This project will fix problems at the statewide/system level so that all Watershed Restoration and Protection Strategy (WRAPS) reports and other projects will benefit by saving money and time as they will no longer have to do data reconciliation work.

Recipient
LimnoTech
2016 Fiscal Year Funding Amount
$62,280
Fund Source

The goal of this project is to prepare a draft Lake Pepin Total Maximum Daily Load (TMDL) Report. Lake Pepin is impaired by high levels of nutrients that cause excessive growth of algae.

Recipient
Emmons & Oliver Resources (EOR)
2015 Fiscal Year Funding Amount
$36,993
Fund Source

Update previous draft Total Maximum Daily Load (TMDL) documents and modeling files with Environmental Protection Agency (EPA) comments and site specific standards.

Recipient
Emmons & Oliver Resources (EOR)
2016 Fiscal Year Funding Amount
$23,900
Fund Source

This project is to finalize the Total Maximum Daily Loads (TMDLs) and Watershed Restoration & Protection Strategies (WRAPS) for the Red Eye and Long Prairie Watersheds.

Recipient
Tetra Tech
2016 Fiscal Year Funding Amount
$48,995
Fund Source

This project will develop draft Total Maximum Daily Load (TMDL) studies addressing seven impaired lakes in the Lower Minnesota River Watershed (Fish, Pike, O’Dowd, Thole, Schneider, Titlow and Cleary Lakes). TMDLs will describe the impairment in each lake and water quality targets, and will include a phosphorus source assessment, a lake response model and supporting report components that document assumptions and methodologies, and a TMDL equation with completed load allocations, wasteload allocations, and margin of safety for each impairment.

Recipient
Barr Engineering-Minneapolis
2016 Fiscal Year Funding Amount
$53,994
Fund Source

The goal of this project is to develop draft Total Maximum Daily Load (TMDL) computations for six impaired lakes and two impaired streams, and to provide TMDL development documentation for selected draft TMDL report sections.

Recipient
Mahnomen County Historical Society
2016 Fiscal Year Funding Amount
$5,120
To microfilm Mahnomen County and Tribal newspapers to make primary records more accessible to the public.
Recipient
Wenck Associates, Inc.
2016 Fiscal Year Funding Amount
$39,912
Fund Source

The goal of this project is to develop Total Maximum Daily Load (TMDL) allocations and complete a final draft TMDL report for the 29 stream impairments listed in the Missouri River Basin. The project will produce completed models and pollutant source assessments for each impairment parameter, and a draft TMDL report that summarizes results of these analyses and TMDL allocations for each stream.

Recipient
Aqua Lux Lucis, Inc.
2016 Fiscal Year Funding Amount
$5,000
Fund Source

Using data supplied by Minnesota Pollution Control Agency (MPCA), this project will model the relationship between sulfate and sulfide in wild rice habitats.

Recipient
Emmons & Oliver Resources (EOR)
2016 Fiscal Year Funding Amount
$7,329
Fund Source

This project will address United States Environmental Protection Agency (USEPA) comments on the Preliminary Draft Total Maximum Daily Load (TMDL) study and Minnesota Pollution Control Agency (MPCA) comments on the pre-public notice draft Watershed Restoration & Protection Strategy (WRAPS) report, and produce Public Notice Draft TMDL study and Public Notice Draft WRAPS report ready for public review and comment.

Recipient
Tetra Tech
2015 Fiscal Year Funding Amount
$160,000
Fund Source

This project is to complete the Watershed Restoration and Protection (WRAP) process, complete Total Maximum Daily Load (TMDL) reports and calculations, develop and discuss Hydrological Simulation Program FORTRAN (HSPF) model scenarios, set restoration and protection priorities, and integrate all of this information in the final WRAPS report.

Recipient
Tetra Tech
2016 Fiscal Year Funding Amount
$80,000
Fund Source

The goal of this project is to construct, calibrate, and validate a Hydrologic Simulation Program FORTRAN (HSPF) watershed model for the Otter Tail watershed. The contractor will produce a HSPF watershed model application(s) that can readily be used to provide information to support conventional parameter Total Maximum Daily Loads (TMDLs). The contractor will clearly demonstrate that this model generates predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen that are consistent with available sets of observed data.

Recipient
The MDA contracted OmniMedia Group for exhibit design and the lesson plan was developed by Stefan Theimer
2015 Fiscal Year Funding Amount
$4,999
2013 Fiscal Year Funding Amount
$13,570
2012 Fiscal Year Funding Amount
$40,970
Fund Source

Theme of this exhibit: Farmers are combining current conservation practices with new technology to protect the environment. 

Recipient
Wenck Associates, Inc.
2015 Fiscal Year Funding Amount
$21,434
Fund Source

The overall goal is to develop a Watershed Restoration and Protection Strategy (WRAPS) report and Total Maximum Daily Load (TMDL) study that will address water quality stream impairments and maintain or improve water quality of streams throughout the Pioneer Sarah Creek watershed, which is part of the North and South Fork Crow major watersheds. The study will identify sources of pollutants to the streams and develop restoration and protection strategies for the streams in the Pioneer-Sarah Creek watershed.

Recipient
Emmons & Oliver Resources (EOR)
2016 Fiscal Year Funding Amount
$4,953
Fund Source

This project will review comments received for the Pope County Eight Lakes Total Maximum Daily Load (TMDL) and prepare responses to comments.

Recipient
Laura Phillips-Mao
2016 Fiscal Year Funding Amount
$3,400
Fund Source

The goal of this project is the development of a model of wild rice population dynamics, using RAMAS software, which mimics natural variability of population levels and calculates the probability of population extinction.

Recipient
RESPEC
2016 Fiscal Year Funding Amount
$99,991
Fund Source

The goal of this project is to construct, calibrate, and validate a watershed model using the Hydrological Simulation Program FORTRAN (HSPF) model for the Upper/Lower Red Lake Watershed. The contractor will produce an HSPF model that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) Studies. The model will generate predicted output for hydrology, sediment, nutrients, and dissolved oxygen that is consistent with observed data.