Minnesota's Legacy

All Projects

Showing 1 - 40 of 68 | Export projects
Recipient
Chisago SWCD
2015 Fiscal Year Funding Amount
$150,000
Fund Source

Two large, actively eroding gullies located a few miles apart in Amador Township are contributing tremendous loads of phosphorus and sediment to the St. Croix River. One gully (Gully A) includes a major agricultural gully, severe road erosion, and sediment deposits of a foot or more thick in a state park. The second gully (Gully B) is over 4 feet deep, adjacent to a road, and is an annual problem. Stabilizing these two gullies will greatly reduce the sediment and phosphorus loading to the St. Croix River, which will help meet the reduction goal of the Lake St.

Chisago
Recipient
Chisago SWCD
2015 Fiscal Year Funding Amount
$30,000
Fund Source

Using a previous escarpment gully project as a model, the Chisago Soil and Water Conservation District will complete a similar inventory of actively eroding gullies along the Lower Sunrise River from the Kost Dam south to the confluence with the St. Croix, which includes the North Branch of the Sunrise, Hay Creek, and the Sunrise River main branch. There are major erosion issues along this stretch of river, no organized and efficient way to begin work in the area. The inventory report will provide the missing link.

Chisago
Recipient
Chisago SWCD
2015 Fiscal Year Funding Amount
$30,000
Fund Source

The Chisago Soil and Water Conservation District has been successful in implementing Best Management Practices in certain targeted locations within the county, including the prioritized and assessed areas of Chisago City, Lindstrom, and Center City. However, there are many areas that want to implement conservation projects but aren't within targeted areas. This award will empower community partners, especially lake associations, to award grants for rain gardens, shoreline buffers, and other worthwhile projects to improve water quality.

Chisago
Recipient
Chisago SWCD
2016 Fiscal Year Funding Amount
$220,500
Fund Source

The Chisago Soil and Water Conservation District (SWCD) has had such great success implementing gully stabilization projects along the St. Croix River escarpment that all of the current grant funding has been encumbered towards projects. Two large gully projects, one in the City of Taylors Falls and a second nearby in Interstate State Park, are lined up and ready to go as soon as funding is secured. Both of these gullies are large and have been actively eroding for many years, depositing large loads of sediment and phosphorus directly into the St. Croix River.

Chisago
Recipient
University of Minnesota
2016 Fiscal Year Funding Amount
$500,000
Fund Source

These funds are being used to systematically collect data and produce statistically valid estimates of the rate of soil erosion and tracking the adoption of high residue cropping systems in in the 67 counties with greater than 30% land in agricultural row crop production. Designed to establish a long term program in Minnesota to collect data and produce county, watershed, and state wide estimates of soil erosion caused by water and wind along with tracking adoption of conservation measures to address erosion.

Becker
Benton
Big Stone
Blue Earth
Brown
Carver
Chippewa
Chisago
Clay
Cottonwood
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Houston
Isanti
Jackson
Kandiyohi
Kittson
Lac qui Parle
Le Sueur
Lincoln
Lyon
Mahnomen
Recipient
Benton SWCD
2017 Fiscal Year Funding Amount
$200,000
Fund Source

This project targets nutrient reductions within the Mayhew and Big Elk Lake watersheds. The Benton Soil and Water Conservation District will work with farmers in implementing a variety of conservation practices including, but not limited to cropland erosion control projects, riparian pasture management, and nutrient management and feedlot pollution control systems. These strategies were identified through Total Daily Maximum Load Studies.

Benton
Sherburne
Recipient
Benton SWCD
2017 Fiscal Year Funding Amount
$200,000
Fund Source

Little Rock Lake experiences severe algae blooms due to excess phosphorus and these blooms are the worst known regionally. The goal of this project is to reduce algae blooms, improve water clarity, and avoid risk of drinking water contamination. The project will result in installing one farmer nutrient management project , four cover crops, two lakeshore buffer strips, six septic systems that also demonstrated an imminent threat to public health, six erosion control projects , one wetland restored, and one feedlot runoff control system.

Benton
Morrison
Recipient
Elk River Watershed Association
2017 Fiscal Year Funding Amount
$182,500
Fund Source

A completed Total Maximum Daily Load (TMDL) study has identified mid to late summer phosphorus loading as a significant stressor to lakes and streams within the Big Elk Lake watershed. While this comprehensive study serves its role as the unifying document that identifies pollutants and sources, further work is required in order to develop site-specific Best Management Practices, design these practices, and oversee their implementation in order to reach clean water goals.

Benton
Sherburne
Recipient
Chisago SWCD
2017 Fiscal Year Funding Amount
$250,000
Fund Source

Goose, East and West Rush Lakes are not meeting state water quality standards due to excessive phosphorus. These are three of the worst lakes in Chisago County in terms of water quality, yet also some of the most heavily used lakes for recreation. The quality of the water in the St. Croix River is directly influenced by the poor quality water leaving East Rush, West Rush, and Goose Lakes.

Chisago
Recipient
Benton SWCD
2017 Fiscal Year Funding Amount
$6,600
Fund Source

The Benton County Water Plan advisory committee has the goal of protecting groundwater resources in Benton County. One of the methods identified is to seal unused wells. In 2013, Benton Soil and Water Conservation District completed an aggressive campaign to identify unused wells. We used several sources to locate potential wells, completed site visits for many wells and collected site information to assisting in prioritizing limited cost share resources.

Benton
Recipient
University of Minnesota
2016 Fiscal Year Funding Amount
$500,000
Fund Source

These funds are being used to systematically collect data and produce statistically valid estimates of the rate of soil erosion and tracking the adoption of high residue cropping systems in counties with greater than 30% land in agricultural row crop production. Designed to establish a long term program in Minnesota to collect data and produce county, watershed, and state wide estimates of soil erosion caused by water and wind along with tracking adoption of conservation measures to address erosion.

Becker
Benton
Big Stone
Blue Earth
Brown
Carver
Chippewa
Chisago
Clay
Cottonwood
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Houston
Isanti
Jackson
Kandiyohi
Kittson
Lac qui Parle
Le Sueur
Lincoln
Lyon
Mahnomen
Recipient
Benton SWCD
2019 Fiscal Year Funding Amount
$175,000
Fund Source

These funds will be utilized in cost-share for landowners to install Agricultural Best Management Practices following Little Rock Lake TMDL Implementation Plan. Example of projects include Feedlot Improvements, Waste Storage Facilities, Erosion Control BMPs, Filter Strips and Streambank Stabilizations. An estimated 830 pounds per year of phosphorus and 800 tons of sediment will be reduced annually.

Benton
Morrison
Recipient
Chisago SWCD
2019 Fiscal Year Funding Amount
$250,000
Fund Source

The Chisago Lakes Chain of Lakes watershed in southern Chisago County is made up of 18 lakes and outlets to the St. Croix River through the Sunrise River. The top 20 urban and rural projects around North and South Center Lakes that are identified in the Rural Subwatershed Assessment and Urban Stormwater Retrofit Analysis reports will be the top priority of this application. The goal is a phosphorus reduction of 100 pounds (4%) to North and South Center Lakes.

Chisago
Recipient
Chisago SWCD
2019 Fiscal Year Funding Amount
$105,000
Fund Source

The Mallery Jerseys dairy farm is critically located along the bluff of the St. Croix River escarpment and drains directly to the St. Croix River. In 2018, a Comprehensive Nutrient Management Plan was completed and identified a number of additional practices that should be implemented to improve the water quality of the St. Croix River. The proposed practices will reduce the phosphorus and nitrogen by 76 pounds (83%)and 265 pounds (85%) respectively.

Chisago
Recipient
Benton SWCD
2019 Fiscal Year Funding Amount
$456,500
Fund Source

The goal of this project is to achieve a 10% reduction in overall sediment discharge to the Mississippi River from the Northeast St. Cloud Drainage Area by installing one regional underground stormwater detention and treatment facility in partnership with a Neighborhood Redevelopment Project. The project will have over 16,000 cubic feet of water storage capacity treating 35 acres of stormwater runoff and is modeled to reduce sediment by 4.5 tons, which is 10% of the sediment reduction goal for this drainage area.

Benton
Recipient
Chisago SWCD
2019 Fiscal Year Funding Amount
$100,000
Fund Source

A large, actively eroding gully has existed on the campus of Parmly, a senior living complex in Chisago City, for at least 50 years. The gully is on the banks of Green Lake, which is at high risk for becoming impaired in the near future. The Parmly gully project is identified as a source of untreated stormwater and phosphorus loading in the Chisago City urban subwatershed retrofit analysis report. Stabilization of the gully will provide a 20% reduction in phosphorus loading to Green Lake. The staff of Parmly is in full support of the project and a design is complete.

Chisago
Recipient
Chisago SWCD
2019 Fiscal Year Funding Amount
$90,000
Fund Source

The St. Croix River escarpment has been a focal point for the Chisago Soil and Water Conservation District over the past 8 years, and continues to be one of the leading areas of Chisago County in terms of phosphorus reduction projects to Lake St. Croix. Of the original inventory, 16 of the 36 gullies have been stabilized. This application includes the stabilization of 5 gullies. These projects will reduce the phosphorus loading to the St. Croix River by at least 50 pounds per year and sediment loading by at least 50 tons per year.

Chisago
Recipient
Roseau River WD
2016 Fiscal Year Funding Amount
$147,700
Fund Source

A collaboration between the Roseau County SWCD and the Roseau River Watershed District (RRWD), the CD 8 Subwatershed Sediment Reduction Project will reduce sediment delivery to the Roseau River by implementing Best Management Practices on sites that have been identified as the greatest contributors of sediment. Sites were prioritized based on modeled data from the Watershed District's Site Prioritization Grant, and the International Watershed Institutes's Water Quality Decision Support Application (WQDSA) and local knowledge of the subwatershed.

Roseau
Recipient
Area 1 - Red River Valley Conservation Service Area
2014 Fiscal Year Funding Amount
$250,000
Fund Source

The Accelerated Water Quality Project Implementation Program will increase the connection between landowners, local government units and the landscape to accelerate efforts addressing non-point source loading to surface waters throughout the Red River Valley Conservation Service Area.

Becker
Beltrami
Clay
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Traverse
Wilkin
Recipient
Benton SWCD
2010 Fiscal Year Funding Amount
$16,500
Fund Source

This project continues water plan activities from a 2007 Clean Water Legacy grant and initiates a multi-county project to restore hydrology and water quality in an impaired trout stream.The first goal of this project is to reduce the impacts of animal manure and fertilizer on surface and groundwater by installing low cost feedlot improvements and targeted manure management planning.

Benton
Recipient
Comfort Lake-Forest Lake WD
2019 Fiscal Year Funding Amount
$144,000
Fund Source

This project proposes the implementation of 10 best management practices identified as having the lowest cost-benefit ratio as it relates to phosphorus reduction to downstream Moody and Bone Lakes with an estimated reduction to watershed phosphorus loads to Bone Lake by 90 pounds per year and to Moody Lake by 24 pounds per year. The Bone Lake watershed is at the ?top? of the larger watershed, making it an ideal location to begin work that will have direct improvements downstream.

Chisago
Washington
Recipient
Comfort Lake-Forest Lake WD
2017 Fiscal Year Funding Amount
$88,000
Fund Source

Bone Lake and upstream Moody Lake are the headwaters of the Comfort Lake-Forest Lake Watershed District northern flow network, and as such, their water quality sets the stage for downstream waters, particularly Comfort Lake, the Sunrise River, and ultimately Lake St. Croix. This project proposes the implementation of six wetland restorations located along the tributary identified as the single highest source of phosphorus loading to Bone Lake. These wetland restorations are estimated to reduce watershed phosphorus loads to Bone Lake by 50 pounds per year.

Chisago
Washington
Recipient
Multiple Local Government Units
2013 Fiscal Year Funding Amount
$1,631,794
Fund Source

Funds are to be used to protect, enhance and restore water quality in lakes, rivers and streams and to protect groundwater and drinking water. Activities include structural and vegetative practices to reduce runoff and retain water on the land, feedlot water quality projects, SSTS abatement grants for low income individuals, and stream bank, stream channel and shoreline protection projects. For the fiscal year 2012, BWSR awarded 12 local governments with funds.

Chisago
Lac qui Parle
Lake of the Woods
McLeod
Mille Lacs
Pennington
Pope
St. Louis
Stearns
Todd
Washington
Winona
Recipient
Chisago SWCD
2014 Fiscal Year Funding Amount
$250,000
Fund Source

In 2010, Legislation allocated Clean Water Fund (CWF) dollars to the Anoka Conservation District to initiate an 11 county metro subwatershed assessment program. The purpose of subwatershed assessments is to improve water quality, increase groundwater recharge and reduce runoff volumes. These goals are achieved by identifying opportunities in the subwatersheds most contributing to the degradation of the high priority water bodies and developing designs for Best Management Practices (BMPs) that treat stormwater runoff.

Chisago
Recipient
Chisago SWCD
2011 Fiscal Year Funding Amount
$230,526
Fund Source

The Chisago Lakes Chain of Lakes Stormwater Retrofit Assessment has assessed 54 small watersheds for the optimal locations for best management practices. A long list of Best Management Practices has been identified, the next step is to design and install the most cost effective projects.

Chisago
Recipient
Benton SWCD
2015 Fiscal Year Funding Amount
$705,000
Fund Source

This project addresses the northeast St. Cloud drainage basin, the highest priority in the St. Cloud Stormwater Management Plan. St. Cloud has observed and documented ongoing sediment loading to the Mississippi River from the 367 acre watershed. The project is also a companion to the Green Roofs Blue Waters program in which several sediment reduction BMPs are being identified and installed along the Mississippi River.

Benton
Recipient
Chisago Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$84,400
Fund Source

The St. Croix River is a national Wild and Scenic River. The river continues to see a decline in water quality due to elevated nutrient levels. Erosion of gullies along the river contribute large amounts of sediment and nutrients to the river.

Chisago
Recipient
Chisago SWCD
2014 Fiscal Year Funding Amount
$117,000
Fund Source

In 2011, the Chisago Soil and Water Conservation District (SWCD) received a Clean Water Fund (CWF) grant to inventory active gully erosion sites along the St. Croix River from the Wild River State Park entrance south to the Chisago/Washington county line. This inventory is now being used to contact landowners with active and severe gully erosion to begin the process of developing a plan correct the problems using Best Management Practices (BMPs).

Chisago
Recipient
Chisago SWCD
2011 Fiscal Year Funding Amount
$31,579
Fund Source

This project will inventory active gully erosion sites along the St. Croix River escarpment from the entrance to Wild River State Park near Almelund, MN, and south to the Chisago County line. The resulting inventory will be utilized to contact landowners with actively eroding gully sites on their property and will begin the process of developing a plan to implement Best Management Practices (BMPs) to correct the problems.

Chisago
Recipient
Comfort Lake Forest Lake Watershed District
2012 Fiscal Year Funding Amount
$30,200
Fund Source

The Comfort Lake Forest Lake Watershed includes numerous private ditches and partially drained wetlands which are a priority for mapping, assessment and restoration. The project will include the mapping and assessment of all drained and partially drained wetlands in the watershed. In addition, a web-based GIS system will be developed to inventory, assess, target and track the effectiveness of various conservation practices towards the attainment of water quality goals.

Chisago
Washington
Recipient
Elk River Watershed Association
2011 Fiscal Year Funding Amount
$149,104
Fund Source

The Elk River Watershed Association (ERWSA) was formed to enable Sherburne and Benton Counties to work together to implement Local Water Management Plans. Since its formation in 1994, the ERWSA has primarily focused on working with land owners to reduce non-point sources of pollution within the watershed. Sherburne and Benton SWCD staff have extensive experience installing conservation practices. The ERWSA draws support from Sherburne County, Benton County, and local lake associations.

Benton
Sherburne
Recipient
Washington Conservation District
2017 Fiscal Year Funding Amount
$81,000
Fund Source

The goal of this project is to adapt and expand the existing successful Master Water Stewards program to engage citizens and catalyze clean water projects in suburban, exurban and rural communities of Washington and southern Chisago Counties. As part of this project, 20 citizens' stewards will be recruited and trained to work in partnership with the Washington Conservation District and area watershed management organizations to implement clean water projects in identified priority areas.

Chisago
Washington
Recipient
Multiple Local Government Units
2010 Fiscal Year Funding Amount
$1,234,350
Fund Source

Currently, there are approximately 5,050 feedlots with fewer than 300 animal units that need to come into compliance with State feedlot rules. Clean Water Feedlot Water Quality Management Grant funds are being used to provide financial assistance to landowners with feedlot operations less than 300 animal units in size and located in a riparian area or impaired watershed.

Aitkin
Benton
Dodge
Douglas
Fillmore
Goodhue
Morrison
Renville
Stearns
Waseca
Washington
Winona
Recipient
Comfort Lake-Forest Lake WD
2017 Fiscal Year Funding Amount
$36,000
Fund Source

This project will develop an enhanced street sweeping plan for the City of Forest Lake that optimizes phosphorus removal from increasing sweeping frequency with the cost of additional sweeps. In addition, this project will identify road-specific street sweeping timing and frequency, quantify expected phosphorus load reductions, itemize costs of enhanced street sweeping, and recommend funding options to the City of Forest Lake.

Chisago
Washington
Recipient
Comfort Lake-Forest Lake Watershed District
2012 Fiscal Year Funding Amount
$176,047
Fund Source

Comfort Lake is one of Chisago county's largest recreational lakes. Comfort Lake is of regional significance with public access for boating, fishing and swimming. A pollution reduction study was conducted for the lake because of decreasing water quality. This study identified highly urban areas as one of the sources of nutrients.

Chisago
Washington
Recipient
Chisago Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$238,640
Fund Source

In partnership with the Chisago Lakes Lake Improvement District, subwatershed assessments for the communities of Center City, Lindstrom and Chisago City, all within the Chisago Lakes Chain of Lakes watershed have been completed. The tourism economy of these communities depends on the Chisago Lakes Chain of Lakes.

Chisago
Recipient
Chisago County
2014 Fiscal Year Funding Amount
$80,000
Fund Source

This project will develop an inventory of the Chisago County public ditch system and significant tributaries, including record searching and field verification to identify and confirm locations of existing public ditches. This project will also identify, inventory and evaluate functions, purpose, and necessity of the Chisago County ditch system and determine legal status of ditches, rights, and responsibilities as defined in Minnesota Statutes 103E.

Chisago
Recipient
Two Rivers Watershed District
2013 Fiscal Year Funding Amount
$200,000
Fund Source

Lake Bronson is the only major recreational lake in Kittson County. The project is a continuation project from FY2012 and will reduce runoff and decrease movement of sediment, nutrients and bacteria by targeting, prioritizing and installing vegetative practices and installing Side Water Inlets within the Lake Bronson watersheds. Emphasis will be placed on the South Branch of Two Rivers. There is a portion of impaired stream reach as identified by the Minnesota Pollution Control, which directly feeds Lake Bronson.

Kittson
Marshall
Roseau
Recipient
Benton SWCD
2018 Fiscal Year Funding Amount
$198,250
Fund Source
Benton
Stearns
Recipient
Benton Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$163,639
Fund Source

Little Rock Lake,in Benton County, is negatively impacted for nutrients. Little Rock Lake is a significant regional recreational lake. Toxins released by blue green algae blooms have been the highest ever measured by the Minnesota Department of Health. Given the importance of this resource and the severity of the water quality problems, obtaining tangible water quality improvements is a high priority in the Benton and Morrison County local water management plans.

Benton