Minnesota's Legacy

All Projects

Showing 1 - 40 of 45 | Export projects
Recipient
Wilkin SWCD
2014 Fiscal Year Funding Amount
$165,000
Fund Source

The Red River is impaired for sediment. This project will install best management practices to repair severe gullies that are contributing massive sediment loads to the Red River. The City of Moorhead also draws water from the Red River for its drinking water supply downstream. The proposed practices will reduce water treatment costs upon installation. Grant funds will be used to install four grade stabilization structures. These structures will control concentrated runoff and reduce flow velocities.

Wilkin
Recipient
Itasca County Soil and Water Conservation District
2016 Fiscal Year Funding Amount
$15,365
Fund Source

"This project will meet the following goals: develop, implement, and evaluate the impacts civic engagement outcomes for the Big Fork River Watershed; create a citizen understanding of the Watershed Restoration & Protection Strategy (WRAPS) and Total Maximum Daily Load (TMDL) process and the role citizens and stakeholders can play in attaining water quality restoration and protection; provide opportunities for citizens and stakeholders to assist local partners and state agencies in developing priorities for restoration as well projects to accomplish protection of high quality waters; and

Itasca
Koochiching
Recipient
Koochiching County Soil & Water Conservation District
2015 Fiscal Year Funding Amount
$161,596
Fund Source

The goals of this project are to develop and implement a stakeholder and public engagement program, update the Hydrological Simulation Program FORTRAN (HSPF) models for the Big Fork and Little Fork River Watersheds, develop Total Maximum Daily Load (TMDL) studies for impaired waterbodies, remove naturally impaired streams from the impairment list, develop a Watershed Restoration and Protection Strategy (WRAPS) report, and to conduct civic engagement activates necessary to ensure project success.

Koochiching
Recipient
Lake of the Woods Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$52,077
Fund Source

The "Bigfork River Target Watershed Assessment – Lake of the Woods & Koochiching Soil and Water Conservation Districts" Project focuses on collecting water chemistry and field parameters at Bear River, Big Fork River (4 sites), Caldwell Brook and Sturgeon River. The project will support the biological assessments being completed by MPCA staff for this Target Watershed Assessment. This work will also train and develop Koochiching SWCD staff to enable them to continue water quality monitoring in the Rainy River Basin.

Itasca
Koochiching
Recipient
Ramsey-Washington Metro WD
2014 Fiscal Year Funding Amount
$200,000
Fund Source

Ramsey-Washington Metro Watershed District (RWMWD) will improve water quality in Casey Lake and ultimately Kohlman Lake through the installation of approximately 25 rain gardens on priority properties identified as part of the Casey Lake Urban Stormwater Retrofit Assessment completed by Ramsey Conservation District (RCD) in 2011.

Ramsey
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$249,932
Fund Source

This project will construct, calibrate, a set of HSPF watershed models covering the entire area of the Lake of the Woods drainage, including the Rainy River watershed. The consultant will produce HSPF models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will clearly demonstrate that these models generate predicted output timeseries for hydrology which are consistent with available sets of observed data.

Koochiching
Lake of the Woods
Roseau
St. Louis
Recipient
Minnesota Department of Health
2019 Fiscal Year Funding Amount
$1,100,000
2018 Fiscal Year Funding Amount
$1,100,000
2017 Fiscal Year Funding Amount
$1,100,000
2016 Fiscal Year Funding Amount
$1,100,000
2015 Fiscal Year Funding Amount
$1,150,000
2014 Fiscal Year Funding Amount
$1,150,000
2013 Fiscal Year Funding Amount
$1,020,000
2012 Fiscal Year Funding Amount
$1,020,000
2011 Fiscal Year Funding Amount
$744,717
2010 Fiscal Year Funding Amount
$250,291
Fund Source

The Drinking Water Contaminants of Emerging Concern (CEC) program identifies environmental contaminants for which current health-based standards currently do not exist or need to be updated, investigate the potential for human exposure to these chemicals, and develop guidance values for drinking water. Contaminants evaluated by CEC staff include contaminants that have been released or detected in Minnesota waters (surface water and groundwater) or that have the potential to migrate to or be detected in Minnesota waters.

Statewide
Recipient
Itasca County Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$25,595
Fund Source

This project will collect intermediate watershed load monitoring data on the Bigfork River which is critical to the identification of stressors and assist in defining areas of concern within the Bigfork Watershed and its greater Rainy River Watershed. Itasca County SWCD will closely collaborate with Koochiching SWCD and MPCA on this project.

Itasca
Koochiching
Recipient
Lake of the Woods Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$108,044
Fund Source

This project involves the water quality monitoring of, and data analysis for four major watersheds (8-digit Hydrologic Unit Codes) in the Rainy River Basin. This monitoring will assist in providing the water chemistry data needed to calculate annual pollutant loads for the Major Watershed Pollutant Load Monitoring Network (MWPLMN) and provide short term data sets of select parameters to other Agency programs.

Beltrami
Itasca
Koochiching
Lake of the Woods
St. Louis
Recipient
Tetra Tech
2014 Fiscal Year Funding Amount
$90,000
Fund Source

The goal of this project is to finalize HSPF watershed models for the St. Louis, Cloquet, and Nemadji Rivers.

Aitkin
Carlton
Itasca
Pine
St. Louis
Recipient
RESPEC
2011 Fiscal Year Funding Amount
$174,579
Fund Source

This project will construct, calibrate, and validate two Hydrologic Simulation Program FORTRAN (HSPF) watershed models. The consultant will produce HSPF models that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDLs) at the Big Fork River and Little Fork River watersheds.

Itasca
Koochiching
St. Louis
Recipient
Itasca SWCD
2019 Fiscal Year Funding Amount
$18,016
Fund Source

This contract is for Itasca County Soil and Water Conservation District (SWCD) to assist in the public participation activities in Rainy Basin Watersheds of Little Fork and Big Fork.

Itasca
Recipient
Itasca County Soil and Water Conservation District
2014 Fiscal Year Funding Amount
$27,671
Fund Source

This project will result in spatial and long-term pollutant load information from Minnesota rivers and streams.

Itasca
Recipient
Itasca County Soil and Water Conservation District
2014 Fiscal Year Funding Amount
$69,980
Fund Source

This project will develop, implement, and evaluate the impacts of co-developed civic engagement outcomes for the St. Louis River, Big Fork River, and Littlefork River watersheds.

Itasca
Recipient
Koochiching County Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$73,777
2014 Fiscal Year Funding Amount
$181,976
Fund Source

The Koochiching County SWCD staff will collect water chemistry and field parameters at specific times to determine amount of contaminant load into each stream. These sites will coincide with locations where stream flow data is also being collected. This project will focus on watershed load monitoring in both the Big Fork and Little Fork River watersheds.

Itasca
Koochiching
St. Louis
Recipient
Koochiching County Soil and Water Conservation District
2013 Fiscal Year Funding Amount
$162,500
Fund Source

The goal of this project is to develop, implement, and evaluate the impacts of co-developed civic engagement outcomes for the Big Fork and Littlefork River Watersheds.

Itasca
Koochiching
Recipient
Lake of the Woods SWCD
2017 Fiscal Year Funding Amount
$55,956
Fund Source

The Rainy River - Rainy Lake, Rainy River - Baudette and Rapid River Watershed Assessments will include the waters of the Baudette River, Black River, Peppermint Creek, Rapid River, Rat Root River and Winter Road River in Koochiching and Lake of the Woods Counties. This assessment focuses on collection of water chemistry and field parameters at the 12 key sites identified and modified by the Minnesota Pollution Control Agency (MPCA). Five of the sites will have extra total phosphorus and chlorophyll analysis completed as identified by the MPCA for collecting river nutrients.

Koochiching
Lake of the Woods
St. Louis
Recipient
Lake of the Woods Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$39,134
Fund Source

This project will provide monitoring of four of the major watersheds (8-digit Hydrologic Unit Codes) in the western part of the Rainy River Basin. Staff from the Lake of the Woods SWCD will conduct water quality sampling, review, manage and provide collected data to the Minnesota Pollution Control Agency (MPCA).

Beltrami
Itasca
Koochiching
Lake of the Woods
Roseau
Recipient
Lake of the Woods Water Sustainability Foundation
2015 Fiscal Year Funding Amount
$500
2016 Fiscal Year Funding Amount
$500
2017 Fiscal Year Funding Amount
$500
2018 Fiscal Year Funding Amount
$500
Fund Source

The Minnesota Pollution Control Agency (MPCA) is a co-sponsor and assists with a portion of the financial support for the International Rainy River-Lake of the Woods Watershed Forum.

Cook
Koochiching
Lake
Lake of the Woods
Roseau
St. Louis
Recipient
Crow Wing County
2015 Fiscal Year Funding Amount
$67,300
Fund Source

This project is a cooperative effort between Crow Wing and Itasca County to contract with RMB Laboratories to generate 65 lake assessment/trend analysis reports. The watershed protection model is an innovative and proactive approach to water resource management which is geared towards prioritizing areas of concern, targeting implementation strategies, and measuring their effectiveness. These assessments are also useful and understandable tools for lake associations and the public.

Crow Wing
Itasca
Recipient
United States Geological Survey (USGS)
2013 Fiscal Year Funding Amount
$140,000
Fund Source

The Little Fork River and Big Fork River - USGS FLOWSED project was established to collect site specific data for streamflow, SSC, and bedload at the Littlefork and Big Fork Rivers in Northern Minnesota; use the data to evaluate the use of dimensionless sediment rating curves for the rivers; and document the results of the study in conjunction with the results from other rivers in the state for the application of regional sediment rating curves to rivers in Minnesota.

Itasca
Koochiching
Recipient
Minnesota Pollution Control Agency
2014 Fiscal Year Funding Amount
$297,169
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Pollution Control Agency
2015 Fiscal Year Funding Amount
$287,628
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Pollution Control Agency
2010 Fiscal Year Funding Amount
$4,432,804
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities.

Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support.

Anoka
Becker
Beltrami
Big Stone
Carver
Cass
Chippewa
Clearwater
Crow Wing
Dakota
Grant
Hennepin
Hubbard
Itasca
Kandiyohi
Koochiching
Lac qui Parle
Lincoln
Lyon
Morrison
Olmsted
Otter Tail
Ramsey
Redwood
Renville
Sherburne
Stevens
Todd
Traverse
Wabasha
Wadena
Washington
Wilkin
Wright
Yellow Medicine
Recipient
Otter Tail, West SWCD
2015 Fiscal Year Funding Amount
$290,616
Fund Source

This Initiative is a nine-year plan to take a systematic approach to inventory and analyze all Public Waters within the County. Phase 1 includes identifying areas of concern through GIS analysis of current landuse along Public Waters, and the development of a database of non-compliant landowners which will be updated and maintained. Once landowners have been identified they will receive a joint letter and map stating that they may not be in compliance.

Otter Tail
Recipient
Otter Tail, East SWCD
2017 Fiscal Year Funding Amount
$471,000
Fund Source

The purpose of this project is to develop a detailed tool that can be used in all watersheds within the Otter Tail and Becker counties to prioritize, target, and measure implementation practices at the field scale. The PTM App will significantly increase the targeting capabilities in Otter Tail and Becker Counties. The Watershed Restoration and Protection Strategy has not been completed for Otter Tail County, yet, and the PTM App will be able to assist targeting and prioritizing when those documents are created.

Becker
Otter Tail
Recipient
Red River Watershed Mgmt Board
2014 Fiscal Year Funding Amount
$235,250
Fund Source

The Prioritization, Targeting, and Measuring Water Quality Improvement Application (PTMA) connects the general qualitative strategies in a Total Maximum Daily Load (TMDL) and Watershed Restoration and Protection (WRAP) and the identification of implementable on-the-ground Best Management Practices (BMPs). Leveraging geospatial data from the International Water Institute this application will be developed for two pilot areas within the Red River Basin.

Becker
Cass
Clay
Grant
Mahnomen
Norman
Otter Tail
Traverse
Recipient
Buffalo-Red River WD
2017 Fiscal Year Funding Amount
$168,000
Fund Source

This project will result in the development of three critical pieces of information. They include: 1. Development of restoration and protection strategies for all waterbodies in the district relative to the State's Non-point Source Funding plan 2. Use of PTMApp to tie the WRAPs implementation tables from the Buffalo and Red River Watersheds to targeted on-the-ground projects and practices that will provide measurable water quality improvements, and 3.

Becker
Clay
Otter Tail
Wilkin
Recipient
University of Minnesota Center for Changing Landscapes
2018 Fiscal Year Funding Amount
$15,490
Fund Source

This project seeks assistance from University of Minnesota in developing effective interview questions for community watershed assessments and will assist in understanding the data collected through community interviews.

Itasca
Koochiching
Lake of the Woods
Recipient
Koochiching County SWCD
2019 Fiscal Year Funding Amount
$323,695
Fund Source

Koochiching County has seven major watersheds in the county, this contract is for work in five of them: Big Fork, Little Fork, Rapid River, Lower Rainy River, and Rainy River Headwaters. The local Koochiching County Soil and Water Conservation District (SWCD) is positioned to assist in several elements of the Watershed Restoration and Protection Strategies (WRAPS) process. This includes gap monitoring for water chemistry, sediment work, Total Maximum Daily Load (TMDL) development, modeling scenarios, and WRAPS development.

Itasca
Koochiching
St. Louis
Recipient
Koochiching County SWCD
2017 Fiscal Year Funding Amount
$99,930
Fund Source

This project will provide an important framework for civic and citizen engagement and communication in the International Rainy River-Lake of the Woods Watershed, which will contribute to long-term public participation in surface water protection and restoration activities.

Cook
Itasca
Koochiching
Lake
Lake of the Woods
St. Louis
Recipient
United States Geological Survey (USGS)
2012 Fiscal Year Funding Amount
$10,800
2013 Fiscal Year Funding Amount
$11,119
Fund Source

This project will collect real-time parameter data for specific conductance, water temperature, pH, dissolved oxygen, turbidity and stream flow at the United States geological Survey (USGS) gaging stations located at Fargo, ND and Grand Forks, ND on the Red River of the North; and publish the data both on the USGS NWIS website and in the USGS Annual Report.

Beltrami
Clay
Clearwater
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Wilkin
Recipient
United States Geological Survey
2015 Fiscal Year Funding Amount
$11,780
Fund Source

The objectives of this project are to collect real-time parameter data for specific conductance, water temperature, pH, dissolved oxygen, turbidity and stream flow at the United States Geological Survey (USGS) gaging stations located at Fargo, ND and Grand Forks, ND on the Red River of the North. Data will be published on the USGS Nation Water Information System (NWIS) website and in the USGS Annual Report.

Agency staff and local partners will gain an improved understanding of the nautre of the chemical and physical attributes of the Red River of the North.

Clay
Polk
Recipient
Red River Watershed Mgmt Board
2014 Fiscal Year Funding Amount
$30,636
Fund Source

As part of the FY 2012 funding cycle, the Board of Water and Soil Resources granted funds for development of the Water Quality Decision Support Application (WQDSA). The WQDSA will provide land and water managers with geospatial data and online tools to prioritize, market, and implement actions on the landscape to achieve water quality objectives identified in local and state water plans and to ensure that public funding decisions are strategic and defensible.

Becker
Clay
Mahnomen
Norman
Polk
Recipient
Red River Watershed Management Board
2010 Fiscal Year Funding Amount
$346,000
Fund Source

This project will develop an effective transferable model to engage and educate watershed residents, stakeholders and others to better understand and protect watershed ecostystems through environmental monitoring, training, and formal and informal education programs in their local watershed. The project will build on the foundation of the existing Red River Basin River Watch program by strengthening three main activity areas: 1) curriculum integration and teacher training, 2) youth leadership and civic engagement, and 3) applied research collaboration and watershed science skills building.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Itasca
Kittson
Koochiching
Lake of the Woods
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Red River Watershed Management Board
2012 Fiscal Year Funding Amount
$200,000
Fund Source

MN Legislative Clean Water Fund funding to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data all for the benefit of water quality in the Red River Basin.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Kittson
Lake of the Woods
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Buffalo-Red River Watershed District
2016 Fiscal Year Funding Amount
$19,860
Fund Source

The purpose of this project is to improve understanding of primary productivity in the Red River and the diversity and population structure of the algal communities occurring along the river system. This will be accomplished through taxonomic identification of periphyton and phytoplankton assemblages necessary for characterizing responses to nutrient gradients along the Red River of the North.

Becker
Beltrami
Clay
Clearwater
Douglas
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Pope
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
United States Geological Survey
2014 Fiscal Year Funding Amount
$11,440
Fund Source

The objective of this project is to collect real-time parameter data for specific conductance, water temperature, pH, dissolved oxygen, turbidity and stream flow at the United States Geological Survey (USGS) gaging stations located at Fargo and Grand Forks North Dakota.

Clay
Polk
Recipient
Itasca Community College
2010 Fiscal Year Funding Amount
$117,272
Fund Source

This assessment will be performed using scientific volunteers, will build capacity at a technical training program at Itasca Community College (ICC), and will provide MPCA with answers providing a reasonable expectation for water quality in this under-studied region of Minnesota.

Itasca
Koochiching
St. Louis
Recipient
Itasca County Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$31,656
Fund Source

This project will collect water chemistry and field parameters at the Popple River, Bowstring River, Big Fork River, Rice River, Caribou Lake and Eagle lake. It will also support the biological assessments being completed by MPCA staff for this Target Watershed Assessment. This project is a collaborative effort with MPCA, 3 SWCDs, and the well established Bigfork River Watch Program. This project is a collaborative effort with Lake of the Woods and Koochiching County SWCDs because the Big Fork Watershed encompasses both Itasca and Koochiching Counties.

Itasca
Koochiching