Minnesota's Legacy

All Projects

Showing 1 - 2 of 2 | Export projects
Recipient
Washington County
2015 Fiscal Year Funding Amount
$1,250,000

The St. Croix River is one of the most pristine, large river ecosystems remaining in the upper Mississippi River System. Washington County, in partnership with the City of Stillwater, is using this appropriation to acquire 15 acres containing 3,500 feet of St. Croix River shoreline just north of downtown Stillwater and parallel to the Brown’s Creek State Trail. The land will be turned into a local nature park for trail users, river users, tourists, and area residents with passive recreation including fishing, boat launching, walking, and picnicking.

Washington
Recipient
U.S. Geological Survey
2015 Fiscal Year Funding Amount
$129,000

Effective groundwater management requires accurate knowledge about the water budget, which is the amount of water stored within the system in aquifers and the amount of water flowing through the overall hydrologic system including water flowing at the surface, water flowing from above ground down into aquifers, and water flowing between aquifers below the surface.

Goodhue
St. Louis