Minnesota's Legacy

All Projects

Showing 1 - 15 of 15 | Export projects
Recipient
Area 1 - Red River Valley Conservation Service Area
2014 Fiscal Year Funding Amount
$250,000
Fund Source

The Accelerated Water Quality Project Implementation Program will increase the connection between landowners, local government units and the landscape to accelerate efforts addressing non-point source loading to surface waters throughout the Red River Valley Conservation Service Area.

Becker
Beltrami
Clay
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Traverse
Wilkin
Recipient
Farmers, Rural Landowners, and Agricultural Supply Businesses
2019 Fiscal Year Funding Amount
$75,000
2018 Fiscal Year Funding Amount
$75,000
2017 Fiscal Year Funding Amount
$75,000
2016 Fiscal Year Funding Amount
$75,000
2015 Fiscal Year Funding Amount
$200,000
2014 Fiscal Year Funding Amount
$200,000
2013 Fiscal Year Funding Amount
$4,500,000
2012 Fiscal Year Funding Amount
$4,500,000
2011 Fiscal Year Funding Amount
$2,500,000
2010 Fiscal Year Funding Amount
$2,000,000
Fund Source

The AgBMP Loan Program provides needed funding for local implementation of clean water practices at an extremely low cost, is unique in its structure and is not duplicated by any other source of funding.The AgBMP loan program provides 3% loans through local lenders to farmers, rural landowners, and agriculture supply businesses.

Anoka
Becker
Blue Earth
Brown
Carver
Cook
Cottonwood
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Houston
Hubbard
Jackson
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
Morrison
Mower
Murray
Nicollet
Olmsted
Pipestone
Pope
Redwood
Renville
Rice
Rock
Scott
Sherburne
Sibley
St. Louis
Stearns
Steele
Stevens
Todd
Traverse
Wabasha
Waseca
Washington
Watonwan
Winona
Yellow Medicine
Recipient
RESPEC
2017 Fiscal Year Funding Amount
$62,485
Fund Source

This project involves the extension and update of the Hydrological Simulation Program FORTRAN (HSPF) model for the Bois de Sioux and Mustinka watersheds.

Big Stone
Grant
Otter Tail
Stevens
Traverse
Wilkin
Recipient
Tetra Tech Inc
2019 Fiscal Year Funding Amount
$89,477
Fund Source

The goal of this project is to extend existing Hydrologic Simulation Program FORTRAN (HSPF) models through 2017 for the following major watersheds: Redwood, Cottonwood, Watonwan, Blue Earth, Le Sueur, Pomme de Terre, Minnesota River-Headwaters, and Lac Qui Parle watersheds.

Big Stone
Blue Earth
Brown
Chippewa
Cottonwood
Douglas
Faribault
Freeborn
Grant
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
Murray
Otter Tail
Pipestone
Pope
Redwood
Renville
Stevens
Swift
Traverse
Waseca
Watonwan
Yellow Medicine
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$68,033

This project addresses five reaches of the Minnesota River that have aquatic recreation impairments as identified by high concentrations of E. coli. The project will describe the water quality impairments, complete pollutant source assessments, establish loading capacities and allocations for the impairments, and develop implementation strategies.

Big Stone
Blue Earth
Brown
Carver
Chippewa
Cottonwood
Douglas
Faribault
Freeborn
Grant
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
McLeod
Murray
Nicollet
Pipestone
Pope
Redwood
Renville
Scott
Sibley
Steele
Stevens
Swift
Waseca
Watonwan
Yellow Medicine
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$68,033
Fund Source

This project addresses five reaches of the Minnesota River that have aquatic recreation impairments as identified by high concentrations of E. coli. The project will describe the water quality impairments, complete pollutant source assessments, establish loading capacities and allocations for the impairments, and develop implementation strategies.

Big Stone
Blue Earth
Brown
Carver
Chippewa
Cottonwood
Douglas
Faribault
Freeborn
Grant
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
McLeod
Murray
Nicollet
Pipestone
Pope
Redwood
Renville
Scott
Sibley
Steele
Stevens
Swift
Waseca
Watonwan
Yellow Medicine
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$109,928
Fund Source

The goal of this project is to refine the nutrient and algae simulation in the Minnesota River basin using all relevant available sources of information. The outcome of this work order is a revised Hydrological Simulation Program – FORTRAN (HSPF) watershed model application for the Minnesota River basin that correctly represents nutrient sources and algae.

Big Stone
Blue Earth
Brown
Carver
Chippewa
Cottonwood
Dakota
Douglas
Faribault
Freeborn
Grant
Hennepin
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
McLeod
Murray
Nicollet
Otter Tail
Pipestone
Pope
Redwood
Renville
Rice
Scott
Sibley
Stevens
Swift
Traverse
Waseca
Watonwan
Yellow Medicine
Recipient
Wilkin SWCD
2016 Fiscal Year Funding Amount
$203,000
Fund Source

The Otter Tail River is located in west-central Minnesota. Its Lower Otter Tail River (LOTR) reach is impaired for sediment. The LOTR begins at the dam of Orwell Reservoir near Fergus Falls and ends 48 river miles downstream at the confluence with the Bois de Sioux River at Breckenridge. No point sources contribute directly to the LOTR. Consequently, the turbidity impairment must be addressed through non-point measures. Current stream instability and bank erosion is largely a result of an 18-mile channel straightening completed by the Army Corps of Engineers in the 1950s.

Wilkin
Recipient
Wilkin SWCD
2016 Fiscal Year Funding Amount
$135,000
Fund Source

This restoration and protection project will reduce the loading of sediment to the Otter Tail River by 440 tons/year. This is about 6.5% of the total reduction needed to meet the goals of the Lower Otter Tail TMDL Implementation Plan. The Otter Tail River downstream of Orwell Dam is impaired due to sediment, with stream bank erosion being the primary contributor. This stream bank restoration will include the installation of woody toe debris benches and the installation of a vegetated slope along a 1,400 foot reach of the river.

Wilkin
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$75,000
Fund Source

The goal of this project is to complete the construction, calibration, and validation of a Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Otter Tail River watershed. The contractor will produce an HSPF model that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) Studies. The model will generate predicted output for hydrology, sediment, nutrients, and dissolved oxygen that is consistent with observed data.

Becker
Clay
Clearwater
Mahnomen
Otter Tail
Wilkin
Recipient
East Otter Tail SWCD
2017 Fiscal Year Funding Amount
$52,556
Fund Source

This project will determine the condition of the water bodies in the Otter Tail River watershed, initiate public participation in the Watershed Restoration and Protection Strategy (WRAPS) development process, begin identification of potential stressors and priority management areas within the watershed, and begin development of initial drafts of the Total Maximum Daily Load (TMDL) study and WRAPS report.

Becker
Clearwater
Otter Tail
Wilkin
Recipient
East Otter Tail SWCD
2019 Fiscal Year Funding Amount
$164,879
Fund Source

The goals of project are to: 1) engage stakeholders and the public in watershed management activities; 2) conduct microbial source tracking to determine the source(s) of E.

Becker
Clay
Clearwater
Mahnomen
Otter Tail
Wilkin
Recipient
University of Minnesota: Sponsored Projects Administration
2015 Fiscal Year Funding Amount
$80,322
Fund Source

This project will be the first of its kind Civic Engagement Cohort that focusses its efforts in an individual watershed. The Otter Tail River Watershed is scheduled to start a Watershed Restoration and Protection Strategy (WRAPS) in 2016 and as a component of that project, the cohort will provide the civic engagement requirement. The cohort will be comprised of 25-30 individuals located throughout the watershed who represent a broad spectrum of resource managers and citizens who are familiar with water quality and watershed management.

Becker
Clay
Clearwater
Mahnomen
Otter Tail
Wilkin
Recipient
Wilkin SWCD
2016 Fiscal Year Funding Amount
$201,000
Fund Source

The Otter Tail River is impaired for turbidity. This project involves the installation of 45 side-inlet structures into Wilkin County Ditch 3-2 and 7-1 and 22 acres of buffer strips along the entire systems. Eleven miles of continuous berm will also be constructed along the ditch. When installed these water quality practices will become a permanent part of the ditch system and will be maintained by the ditch authority. These ditches outlet to the Otter Tail River just upstream from Breckenridge, MN. Together these water quality BMPs will reduce sediment loading by 1,375 tons/year.

Wilkin
Recipient
International Water Institute
2016 Fiscal Year Funding Amount
$523,135
2018 Fiscal Year Funding Amount
$288,451
2019 Fiscal Year Funding Amount
$201,398
Fund Source

The International Water Institute (IWI) will monitor 42 sites (3 basin, 12 major watershed, and 27 subwatershed) in the Red River and Upper Mississippi River Basins intensively during 2016, 2017, 2018 and 2019. There will also be 5 sites in the Red River Basin where mercury samples will be collected in 2016 and 2017 and sent to Minnesota Department of Health for analysis. The IWI will collect water samples across the range of flow conditions targeting sample collection at times of moderate to high flow.

Beltrami
Cass
Grant
Itasca
Kittson
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Traverse
Wilkin