Minnesota's Legacy

All Projects

Showing 1 - 40 of 75 | Export projects
Recipient
Cannon River Watershed Partnership
2013 Fiscal Year Funding Amount
$32,421
Fund Source

This project will support the monitoring of two sites on the Cannon River throughout the field seasons of 2013 and 2014 during storm events and baseflow conditions to capture 25 samples per year at each site according to the WPLMN objectives. The information gathered from these samples and site visits will be compiled for reporting purposes and for use in calculating pollutant loading using the FLUX32 model.

Blue Earth
Dakota
Dodge
Freeborn
Goodhue
Le Sueur
Rice
Scott
Steele
Waseca
Recipient
Metropolitan Council-Environmental Services
2013 Fiscal Year Funding Amount
$405,500
Fund Source

This project will provide condition monitoring and problem investigation monitoring at the following sites.
Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek.
Minnesota River: Tributaries include Eagle Creek,Riley Creek, and Valley Creek tributary to the St. Croix River

Anoka
Benton
Carver
Chisago
Dakota
Hennepin
Isanti
Le Sueur
McLeod
Meeker
Mille Lacs
Morrison
Nicollet
Pine
Ramsey
Renville
Rice
Scott
Sherburne
Sibley
Stearns
Washington
Wright
Recipient
Metropolitan Council/Environmental Financial Group Inc.
2010 Fiscal Year Funding Amount
$11,785
2011 Fiscal Year Funding Amount
$36,754
Fund Source

On behalf of the Metropolitan Council, Environmental Financial Group Inc. generated a matrix of water conservation programs with detailed information about the costs and benefits of the programs. Tools were also developed to allow users to calculate potential water savings, estimate program implementation costs, and test the effects of various water conservation programs and rate structures.

Aitkin
Anoka
Becker
Beltrami
Benton
Big Stone
Blue Earth
Brown
Carlton
Carver
Cass
Chippewa
Chisago
Clay
Clearwater
Cook
Cottonwood
Crow Wing
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Hennepin
Houston
Hubbard
Isanti
Itasca
Jackson
Kanabec
Kandiyohi
Kittson
Koochiching
Lac qui Parle
Lake
Lake of the Woods
Le Sueur
Lincoln
Lyon
Mahnomen
Marshall
Martin
McLeod
Meeker
Mille Lacs
Morrison
Mower
Murray
Nicollet
Nobles
Norman
Olmsted
Otter Tail
Pennington
Pine
Pipestone
Polk
Pope
Ramsey
Red Lake
Redwood
Renville
Rice
Rock
Roseau
Scott
Sherburne
Sibley
St. Louis
Statewide
Stearns
Steele
Stevens
Swift
Todd
Traverse
Wabasha
Wadena
Waseca
Washington
Watonwan
Wilkin
Winona
Wright
Yellow Medicine
Recipient
Emmons & Olivier Resources (EOR)
2013 Fiscal Year Funding Amount
$51,477
Fund Source

This project will develop a TMDL for all impaired lakes within the Crow Wing Watershed by furthering data collection in the watershed, analysis of data, allocation calculations, and introducing outreach and stakeholder participation activities.

Wadena
Crow Wing
Clearwater
Todd
Cass
Otter Tail
Becker
Morrison
Hubbard
Recipient
Emmons & Olivier Resources
2012 Fiscal Year Funding Amount
$15,041
Fund Source

This first year of the project will collect available data relevant to the TMDL development, determine the data sets best suited for the TMDL development. Gain a better understanding of the watershed and impaired lakes, and assessment of all potential sources (internal and external) of the causes of lake impairment. EOR will also review the data produced by the MPCA for the impairment assessment for each of the lakes during year 1 of the project.

Becker
Cass
Clearwater
Crow Wing
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
Wenck Associates, Inc.
2012 Fiscal Year Funding Amount
$29,872
Fund Source

This project willl complete a final TMDL document that will be submitted to EPA for approval. Document will include Lake Osakis, Clifford Lake, Faille Lake, and Smith Lake impairments. A final technical memorandum describing the elements of the model framework and any deviations from the recommended construction methodology will be also be provided with the submission of the watershed models.

Douglas
Morrison
Otter Tail
Todd
Wadena
Recipient
Science Museum of Minnesota-St. Croix Watershed Research Station
2012 Fiscal Year Funding Amount
$149,996
Fund Source

This project will directly inform the Lake of the Woods (LoW )TMDL process by identifying nutrient reduction targets, a timeline of phosphorus loadings to the lake, and measures of historical in-lake variability (e.g., nutrients, biological communities). Results will complement and build on ongoing research efforts on internal loading and sediment core analysis.

Lake of the Woods
Roseau
Recipient
Lake of the Woods Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$31,714
Fund Source

This project will support the collection and analysis of sediment core samples, from each of the five bays ( Little Traverse, Big Traverse, Muskeg, Sabaskong and 4-Mile Bays), to ensure adequate characterization of the P fluxes from deposited sediment and equilibrium P fluxes from re-suspended sediment.

Lake of the Woods
Roseau
Recipient
Hubbard Soil & Water Conservation District (SWCD)
2012 Fiscal Year Funding Amount
$69,990
Fund Source

This project covers activities necessary to complete the major watershed restoration and projection project. The major objectives this project covers include contract administration, watershed coordination, stressor ID activities, identifying priority management zones, engage watershed citizens, and the creation of watershed restoration and protection plans.

Becker
Cass
Clearwater
Crow Wing
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
RESPEC
2012 Fiscal Year Funding Amount
$49,996
Fund Source

This project will finalize HSPF watershed model construction by incorporating internal phosphorus loading in modeled lakes, run a suite of implementation scenarios and generate a GenScn project containing model output. The consultant will produce HSPF watershed models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will deliver all modeling files for baseline and implementation scenarios and provide a GenScn project containing model output.

Becker
Carver
Cass
Clearwater
Crow Wing
Douglas
Hennepin
Hubbard
Kandiyohi
McLeod
Meeker
Morrison
Otter Tail
Pope
Renville
Sibley
Stearns
Todd
Wadena
Wright
Recipient
Emmons & Olivier Resources
2013 Fiscal Year Funding Amount
$99,355
Fund Source

This project will complete a pollutant source identification and subwatershed information report and support the development of a Draft Restoration and Protection Plan (RAPP). It will also support the devlopment of a Implementation Plan that will identify target areas for BMP implementation for bacteria reductions.

Anoka
Benton
Carver
Crow Wing
Dakota
Douglas
Hennepin
Kandiyohi
McLeod
Meeker
Mille Lacs
Morrison
Pope
Ramsey
Sherburne
Sibley
Stearns
Todd
Washington
Wright
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$70,000
Fund Source

This project will complete spatial and temporal revisions , recalibration and validation of 7 watershed HSPF models. These fully functioning calibrated validated executable models will simulate hydrology, sediment (sand, silt, and clay), temperature, phosphorus, nitrogen, dissolved oxygen, biochemical oxygen demand, and algae at the 12-digit HUC subbasin scale (or finer).

Blue Earth
Brown
Carver
Cottonwood
Dakota
Faribault
Freeborn
Jackson
Le Sueur
Lincoln
Lyon
Martin
McLeod
Murray
Nicollet
Pipestone
Ramsey
Redwood
Renville
Rice
Scott
Sibley
Steele
Waseca
Watonwan
Yellow Medicine
Recipient
Bois de Sioux Watershed District
2013 Fiscal Year Funding Amount
$285,000
Fund Source

This project will set water quality goals for the Minnesota portions of the watershed, recommend allocations for achieving total maximum daily loads where waters do not meet Minnesota state standards and are listed as impaired, and recommend management strategies for those Minnesota waters meeting state standards. This project also recognizes that as monitoring continues in the watershed, additional impairments may be identified.

Grant
Otter Tail
Traverse
Wilkin
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$249,932
Fund Source

This project will construct, calibrate, a set of HSPF watershed models covering the entire area of the Lake of the Woods drainage, including the Rainy River watershed. The consultant will produce HSPF models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will clearly demonstrate that these models generate predicted output timeseries for hydrology which are consistent with available sets of observed data.

Koochiching
Lake of the Woods
Roseau
St. Louis
Recipient
Wenck Associates, Inc.
2013 Fiscal Year Funding Amount
$1,879
Fund Source

This project will support the completion of a final draft Total Maximum Daily Load (TMDL) document for the Osakis, Smith and Faille Lakes TMDL and the submittal to EPA for final approval.

Douglas
Meeker
Morrison
Pope
Stearns
Todd
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$89,967
Fund Source

This project will construct, calibrate, and validate an HSPF watershed model for the Lake of the Woods River watershed. The consultants will produce HSPF watershed models that can readily be used to provide information to support conventional parameter TMDLs. The consultants will clearly demonstrate that the models generate predicted output time series for hydrology, sediment, nutrients, and dissolved oxygen that are consistent with available sets of observed data.

Lake of the Woods
Roseau
Recipient
Benton Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$75,000
Fund Source

This project will determine the magnitude and sources of pollutants in Little Rock Creek and will estimate the reductions in loadings that are needed in order for the stream reaches to support cold water fish assemblages and attain water quality standards.

Benton
Morrison
Recipient
University of Minnesota
2012 Fiscal Year Funding Amount
$175,000
2013 Fiscal Year Funding Amount
$175,000

PROJECT OVERVIEW

Aitkin
Becker
Beltrami
Benton
Carlton
Cass
Clearwater
Cook
Crow Wing
Hubbard
Itasca
Koochiching
Lake
Lake of the Woods
Mahnomen
Marshall
Morrison
Otter Tail
Pennington
Pine
Polk
Red Lake
Roseau
St. Louis
Todd
Wadena
Recipient
Aqua Terra Consultants
2013 Fiscal Year Funding Amount
$36,848
Fund Source

This project will maximize the utility and usefulness of three HSPF models that have been constructed and calibrated for hydrology. The contractor will identify and reduce parameterization errors in the following three HSPF models: 1) Buffalo River Watershed, 2 ) Thief River Watershed, 3) Bois de Sioux-Mustinka Watersheds. This will result, not only in a better hydrology calibration, but will also improve each of the models’ ability to more accurately estimate sediment and pollutant loads and concentrations.

Becker
Beltrami
Big Stone
Clay
Grant
Marshall
Otter Tail
Pennington
Roseau
Stevens
Traverse
Wilkin
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$253,710
Fund Source

The goal of this project is to construct, calibrate, and validate five Hydrologic Simulation Program FORTRAN (HSPF) watershed models. The outcome will be HSPF models that can readily be used to provide information to support conventional parameter TMDLs. These models will generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.

Wright
Todd
Stearns
St. Louis
Sherburne
Morrison
Mille Lacs
Meeker
Kanabec
Itasca
Isanti
Chisago
Cass
Carlton
Benton
Anoka
Aitkin
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$89,968
Fund Source

The goal of this project is to construct, calibrate, and validate a watershed model using Hydrologic Simulation Program FORTRAN (HSPF). The project will result in a HSPF model that can readily be used to provide information to support conventional parameter TMDLs.

Kittson
Marshall
Roseau
Recipient
Great River Regional Library
2013 Fiscal Year Funding Amount
$347,553
2012 Fiscal Year Funding Amount
$343,363

Minnesota’s 12 regional public library systems, which encompass 350 public libraries in all areas of the state, benefit from a portion of the Legacy Amendment’s Arts and Cultural Heritage Fund. Through State Library Services, a division of the Minnesota Department of Education, each regional public library system receives a formula-driven allocation from the annual $3 million Minnesota Regional Library Legacy Grant.

Benton
Morrison
Sherburne
Stearns
Todd
Wright
Recipient
Great River Regional Library
2014 Fiscal Year Funding Amount
$250,097
2015 Fiscal Year Funding Amount
$250,097

Minnesota’s 12 regional public library systems, which encompass 350 public libraries in all areas of the state, benefit from a portion of the Legacy Amendment’s Arts and Cultural Heritage Fund. Through State Library Services, a division of the Minnesota Department of Education, each regional public library system receives a formula-driven allocation from the annual $3 million Minnesota Regional Library Legacy Grant.

Benton
Morrison
Sherburne
Stearns
Todd
Wright
Recipient
Great River Regional Library
2016 Fiscal Year Funding Amount
$183,129
2017 Fiscal Year Funding Amount
$177,552

Minnesota’s twelve regional library systems, which encompass more than 350 public libraries in all areas of the state, can benefit from a portion of the Legacy Amendment’s Arts and Cultural Heritage Fund. Through State Library Services, a division of the Minnesota Department of Education, each regional library system is eligible to receive a formula-driven allocation from the annual $2.2 million Minnesota Regional Library System Legacy Grant. Great River Regional Library (GRRL) is a consolidated regional public library system in central Minnesota.

Benton
Morrison
Sherburne
Stearns
Todd
Wright
Recipient
Great River Regional Library
2018 Fiscal Year Funding Amount
$208,158
2019 Fiscal Year Funding Amount
$208,158

Minnesota's twelve regional library systems, which encompass more than 350 public libraries in all areas of the state, can benefit from a portion of the Legacy Amendment's Arts and Cultural Heritage Fund. Through State Library Services, a division of the Minnesota Department of Education, each regional library system is eligible to receive a formula-driven allocation from the annual $2.5 million Minnesota Regional Library System Legacy Grant. Great River Regional Library (GRRL) is a consolidated regional public library system in central Minnesota.

Benton
Morrison
Sherburne
Stearns
Todd
Wright
Recipient
Houston Engineering
2012 Fiscal Year Funding Amount
$67,996
Fund Source

This project will continue to develop, and calibrate/validate the hydrology of an HSPF watershed model for the Thief River watershed. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval. The consultant will produce an HSPF watershed model that can readily be used to provide information to support conventional parameter TMDLs.

Beltrami
Marshall
Pennington
Roseau
Recipient
AQUA TERRA Consultants
2011 Fiscal Year Funding Amount
$99,950
Fund Source

This project will support construction of three watershed framework models built using the Hydrologic Simulation Program FORTRAN (HSPF). These executable models will simulate hydrology at the subbasin scale. An HSPF model will be built for each of these major watersheds: Crow Wing River, Redeye River, and Long Prairie River.

Becker
Cass
Clearwater
Crow Wing
Douglas
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$250,000
Fund Source

The goal of this project is to complete the calibration/validation process of Hydrologic Simulation FORTRAN (HSPF) watershed models for the Lake of the Woods/Rainy River Basin.

Cook
Koochiching
Lake
Lake of the Woods
Roseau
St. Louis
Recipient
RESPEC
2011 Fiscal Year Funding Amount
$149,677
Fund Source

This project will finalize HSPF watershed model construction and complete the calibration/validation process for the following three watersheds: North Fork Crow River, South Fork Crow River, and Sauk River.

Carver
Douglas
Hennepin
Kandiyohi
McLeod
Meeker
Morrison
Pope
Renville
Sibley
Stearns
Todd
Wright
Recipient
Emmons and Olivier Resources, Inc. (EOR)
2011 Fiscal Year Funding Amount
$135,000
Fund Source

This project will complete the development of two watershed HSPF models for the Mustinka River and Bois de Sioux River watersheds. These calibrated and validated executable models will simulate hydrology at the 12-digit HUC subbasin scale.

Big Stone
Grant
Otter Tail
Stevens
Traverse
Wilkin
Recipient
Aqua Terra Consultants
2012 Fiscal Year Funding Amount
$120,238
2013 Fiscal Year Funding Amount
$134,980
Fund Source

This project will continue HSPF watershed model construction beyond the initial framework development. The consultant will add representation of point source discharges to the model. The consultant will also compile flow data for the purposes of calibration and validation. Finally, an initial hydrologic calibration will be performed and submitted for approval.

Becker
Cass
Clearwater
Crow Wing
Douglas
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$128,887
Fund Source
The goal of this project is to extend the existing HSPF models through 2012 in the Chippewa Watershed (07020005) and Hawk-Yellow Medicine Watershed (07020004) to incorporate recent monitoring data to support current MPCA business needs and sediment source investigations.
Blue Earth
Brown
Carver
Chippewa
Cottonwood
Dakota
Douglas
Faribault
Freeborn
Hennepin
Kandiyohi
Le Sueur
Lincoln
Lyon
McLeod
Murray
Nicollet
Otter Tail
Pipestone
Pope
Renville
Rice
Scott
Sibley
Steele
Swift
Waseca
Watonwan
Yellow Medicine
Recipient
RESPEC
2011 Fiscal Year Funding Amount
$214,963
Fund Source

This project will complete spatial and temporal revisions of 6 Hydrologic Simulation Program FORTRAN (HSPF) models, the recalibration and validation of 7 watershed HSPF models, and the revision of the drainage network and point source representation of the Pomme de Terre HSPF model.

Big Stone
Blue Earth
Brown
Carver
Cottonwood
Dakota
Douglas
Faribault
Freeborn
Grant
Hennepin
Jackson
Le Sueur
Lincoln
Lyon
Mahnomen
Martin
McLeod
Murray
Nicollet
Norman
Otter Tail
Pipestone
Polk
Ramsey
Redwood
Renville
Rice
Scott
Sibley
Steele
Stevens
Swift
Waseca
Watonwan
Yellow Medicine
Recipient
University of Minnesota-Natural Resources Research Institute (NRRI)
2011 Fiscal Year Funding Amount
$72,461
2012 Fiscal Year Funding Amount
$3,340
2013 Fiscal Year Funding Amount
$35,744
Fund Source

This project will determine pre- and post-settlement nutrient trends from sediment chronology, fossil diatom assemblages, and from sediment profiles representing human history in the region (i.e., at least 150 years). Project activities include sample collection; sample preparation; diatom analysis; database creation and management; and data interpretation. Sample cores will be taken on the Lake of the Woods in five major bays (i.e., Four-mile, Muskeg, Sabaskong, Little Traverse, and Big Traverse) in the southern basin.

Lake of the Woods
Roseau
Recipient
AECOM, Inc.
2010 Fiscal Year Funding Amount
$35,000
Fund Source

Phase 4 of the Lake Winona Total Maximum Daily Load (TMDL) project will finalize the draft Lake Winona TMDL, dated November 2009, by completing additional data analysis, lake quality modeling, updating the TMDL report, and supporting the public involvement process.

Cass
Douglas
Morrison
Otter Tail
Todd
Recipient
United States Geological Survey (USGS)
2011 Fiscal Year Funding Amount
$796,400
Fund Source

This project will support the collection of water-quality samples and gauge streamflow near the mouths of the Rainy and Warroad Rivers; collect water-quality samples at 10 sites in LOW; and measure streamflow velocities and cross-sectional areas of 5 channel constrictions in LOW.

Roseau
Lake of the Woods
Recipient
Lake of the Woods Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$237,180
2013 Fiscal Year Funding Amount
$15,993
Fund Source

This project will gather watershed data necessary for the development of a Watershed Restoration and Protection Strategy to maintain or improve water quality within the LoW Watershed; and establish project and sub-basin work groups and/or focus groups to guide the MWRPP process.

Lake of the Woods
Roseau
Recipient
University of Minnesota
2013 Fiscal Year Funding Amount
$100,000
Fund Source

With a perceived increase in the frequency and intensity of cyanobacterial algal blooms in Lake of the Woods (LOW), there has been an increased effort to collect information about the nature of algal blooms, nutrient concentrations and sources of nutrients to the LOW.

Lake of the Woods
Roseau
Recipient
Minnesota State University-Mankato
2011 Fiscal Year Funding Amount
$137,787
Fund Source

This project will initiate the process of community engagement in the LeSueur River watershed by assessing the needs and interests of the community and bringing a diverse set of stakeholders together to determine how best to foster action in improving and protecting water quality.

Blue Earth
Faribault
Freeborn
Le Sueur
Steele
Waseca
Recipient
LimnoTech
2013 Fiscal Year Funding Amount
$59,116
Fund Source

The MPCA has selected the Soil and Water Assessment Tool (SWAT) watershed model to simulate watershed hydrology and water quality to assess various restoration scenarios in the Little Cannon River watershed. The SWAT model is an important tool in developing an understanding of existing conditions and simulating conditions under various management scenarios to inform the development of implementation strategies and plans to restore and protect streams and lakes.

Blue Earth
Dakota
Dodge
Freeborn
Goodhue
Le Sueur
Rice
Scott
Steele
Waseca