Minnesota's Legacy

All Projects

Showing 1 - 40 of 98 | Export projects
Recipient
Benton SWCD
2017 Fiscal Year Funding Amount
$200,000
Fund Source

Little Rock Lake experiences severe algae blooms due to excess phosphorus and these blooms are the worst known regionally. The goal of this project is to reduce algae blooms, improve water clarity, and avoid risk of drinking water contamination. The project will result in installing one farmer nutrient management project , four cover crops, two lakeshore buffer strips, six septic systems that also demonstrated an imminent threat to public health, six erosion control projects , one wetland restored, and one feedlot runoff control system.

Benton
Morrison
Recipient
Benton SWCD
2019 Fiscal Year Funding Amount
$175,000
Fund Source

These funds will be utilized in cost-share for landowners to install Agricultural Best Management Practices following Little Rock Lake TMDL Implementation Plan. Example of projects include Feedlot Improvements, Waste Storage Facilities, Erosion Control BMPs, Filter Strips and Streambank Stabilizations. An estimated 830 pounds per year of phosphorus and 800 tons of sediment will be reduced annually.

Benton
Morrison
Recipient
Farmers, Rural Landowners, and Agricultural Supply Businesses
2019 Fiscal Year Funding Amount
$75,000
2018 Fiscal Year Funding Amount
$75,000
2017 Fiscal Year Funding Amount
$75,000
2016 Fiscal Year Funding Amount
$75,000
2015 Fiscal Year Funding Amount
$200,000
2014 Fiscal Year Funding Amount
$200,000
2013 Fiscal Year Funding Amount
$4,500,000
2012 Fiscal Year Funding Amount
$4,500,000
2011 Fiscal Year Funding Amount
$2,500,000
2010 Fiscal Year Funding Amount
$2,000,000
Fund Source

The AgBMP Loan Program provides needed funding for local implementation of clean water practices at an extremely low cost, is unique in its structure and is not duplicated by any other source of funding.The AgBMP loan program provides 3% loans through local lenders to farmers, rural landowners, and agriculture supply businesses.

Anoka
Becker
Blue Earth
Brown
Carver
Cook
Cottonwood
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Houston
Hubbard
Jackson
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
Morrison
Mower
Murray
Nicollet
Olmsted
Pipestone
Pope
Redwood
Renville
Rice
Rock
Scott
Sherburne
Sibley
St. Louis
Stearns
Steele
Stevens
Todd
Traverse
Wabasha
Waseca
Washington
Watonwan
Winona
Yellow Medicine
Recipient
Metropolitan Council-Environmental Services
2013 Fiscal Year Funding Amount
$405,500
Fund Source

This project will provide condition monitoring and problem investigation monitoring at the following sites.
Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek.
Minnesota River: Tributaries include Eagle Creek,Riley Creek, and Valley Creek tributary to the St. Croix River

Anoka
Benton
Carver
Chisago
Dakota
Hennepin
Isanti
Le Sueur
McLeod
Meeker
Mille Lacs
Morrison
Nicollet
Pine
Ramsey
Renville
Rice
Scott
Sherburne
Sibley
Stearns
Washington
Wright
Recipient
Cass County Environmental Services Department
2010 Fiscal Year Funding Amount
$198,971
Fund Source

This monitoring project includes lake and stream monitoring and encompasses all of Cass County, and surrounding counties. The project will obtain water quality data for streams; in 2009, lakeshed assessments indicated that many surface waters throughout the county were data deficient. This project will address the need for sufficient data on a county-wide basis and fulfill the State’s intensive watershed monitoring program goals by obtaining water quality data at targeted lake and stream sites.

Aitkin
Becker
Beltrami
Carlton
Cass
Clearwater
Crow Wing
Hubbard
Itasca
Morrison
Otter Tail
St. Louis
Todd
Wadena
Recipient
Wadena Soil and Water Conservation District, Darren Newville, District Manager, darren.newville@mn.nacdnet.net (218) 631-3195 ext. 3
2017 Fiscal Year Funding Amount
$14,338
2016 Fiscal Year Funding Amount
$14,337
2015 Fiscal Year Funding Amount
$11,500
2014 Fiscal Year Funding Amount
$11,500
2013 Fiscal Year Funding Amount
$76,724
2012 Fiscal Year Funding Amount
$33,852
2011 Fiscal Year Funding Amount
$114,991
Fund Source

The Minnesota Department of Agriculture has signed a Joint Powers Agreement with Wadena County Soil and Water Conservation District (SWCD).

Becker
Benton
Cass
Crow Wing
Douglas
Hubbard
Kandiyohi
Morrison
Otter Tail
Pope
Sherburne
Stearns
Todd
Wadena
Recipient
Metropolitan Council/Environmental Financial Group Inc.
2010 Fiscal Year Funding Amount
$11,785
2011 Fiscal Year Funding Amount
$36,754
Fund Source

On behalf of the Metropolitan Council, Environmental Financial Group Inc. generated a matrix of water conservation programs with detailed information about the costs and benefits of the programs. Tools were also developed to allow users to calculate potential water savings, estimate program implementation costs, and test the effects of various water conservation programs and rate structures.

Aitkin
Anoka
Becker
Beltrami
Benton
Big Stone
Blue Earth
Brown
Carlton
Carver
Cass
Chippewa
Chisago
Clay
Clearwater
Cook
Cottonwood
Crow Wing
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Hennepin
Houston
Hubbard
Isanti
Itasca
Jackson
Kanabec
Kandiyohi
Kittson
Koochiching
Lac qui Parle
Lake
Lake of the Woods
Le Sueur
Lincoln
Lyon
Mahnomen
Marshall
Martin
McLeod
Meeker
Mille Lacs
Morrison
Mower
Murray
Nicollet
Nobles
Norman
Olmsted
Otter Tail
Pennington
Pine
Pipestone
Polk
Pope
Ramsey
Red Lake
Redwood
Renville
Rice
Rock
Roseau
Scott
Sherburne
Sibley
St. Louis
Statewide
Stearns
Steele
Stevens
Swift
Todd
Traverse
Wabasha
Wadena
Waseca
Washington
Watonwan
Wilkin
Winona
Wright
Yellow Medicine
Recipient
Crow Wing Soil and Water Conservation District (SWCD)
2013 Fiscal Year Funding Amount
$14,987
Fund Source

The project will include lake monitoring on three (3) lakes found in the Rum River watershed in southeastern Crow Wing County (CWC). The project will be conducted in an effort to gain sufficient data on these data-deficient lake sites. All of the proposed monitoring sites are target sites for 2013-2014. One of the goals of the CWC Local Comprehensive Water Plan (CWP) is to establish a countywide Comprehensive Monitoring Plan (CMP).

Aitkin
Anoka
Benton
Chisago
Crow Wing
Isanti
Kanabec
Mille Lacs
Morrison
Sherburne
Recipient
Crow Wing Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$45,964
Fund Source

This project will collect a complete Trophic Site Index (TSI) data set for Crow Wing County lakes and a complete data set for streams and rivers for the Intensive Monitoring Program (IMP). Crow Wing County, Cass County, Wadena County, Morrison County and Hubbard County are partnering to ensure that all target lakes and rivers within the Crow Wing River watershed are monitored efficiently.

Aitkin
Becker
Cass
Clearwater
Crow Wing
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
Wadena Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$30,000
Fund Source

This project will provide Stressor ID work and assistance for the development of a work plan for the Major Watershed Project. The Major Watershed Project will include a plan for civic engagement and outreach, with assistance from ten Local Government Units from the Crow Wing River Watershed.

Becker
Cass
Clearwater
Crow Wing
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
Emmons & Olivier Resources (EOR)
2013 Fiscal Year Funding Amount
$51,477
Fund Source

This project will develop a TMDL for all impaired lakes within the Crow Wing Watershed by furthering data collection in the watershed, analysis of data, allocation calculations, and introducing outreach and stakeholder participation activities.

Wadena
Crow Wing
Clearwater
Todd
Cass
Otter Tail
Becker
Morrison
Hubbard
Recipient
Emmons & Olivier Resources
2012 Fiscal Year Funding Amount
$15,041
Fund Source

This first year of the project will collect available data relevant to the TMDL development, determine the data sets best suited for the TMDL development. Gain a better understanding of the watershed and impaired lakes, and assessment of all potential sources (internal and external) of the causes of lake impairment. EOR will also review the data produced by the MPCA for the impairment assessment for each of the lakes during year 1 of the project.

Becker
Cass
Clearwater
Crow Wing
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
Wadena Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$30,000
Fund Source

This project will initiate project coordination among project partners. It will enhance civic engagement and outreach endeavors activities to support Phase 2 of TMDL project. It will also support field activities associated with stressor ID work.

Becker
Cass
Clearwater
Crow Wing
Hubbard
Morrison
Otter Tail
Wadena
Recipient
Wenck Associates, Inc.
2012 Fiscal Year Funding Amount
$29,872
Fund Source

This project willl complete a final TMDL document that will be submitted to EPA for approval. Document will include Lake Osakis, Clifford Lake, Faille Lake, and Smith Lake impairments. A final technical memorandum describing the elements of the model framework and any deviations from the recommended construction methodology will be also be provided with the submission of the watershed models.

Douglas
Morrison
Otter Tail
Todd
Wadena
Recipient
Hubbard Soil & Water Conservation District (SWCD)
2012 Fiscal Year Funding Amount
$69,990
Fund Source

This project covers activities necessary to complete the major watershed restoration and projection project. The major objectives this project covers include contract administration, watershed coordination, stressor ID activities, identifying priority management zones, engage watershed citizens, and the creation of watershed restoration and protection plans.

Becker
Cass
Clearwater
Crow Wing
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
RESPEC
2012 Fiscal Year Funding Amount
$49,996
Fund Source

This project will finalize HSPF watershed model construction by incorporating internal phosphorus loading in modeled lakes, run a suite of implementation scenarios and generate a GenScn project containing model output. The consultant will produce HSPF watershed models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will deliver all modeling files for baseline and implementation scenarios and provide a GenScn project containing model output.

Becker
Carver
Cass
Clearwater
Crow Wing
Douglas
Hennepin
Hubbard
Kandiyohi
McLeod
Meeker
Morrison
Otter Tail
Pope
Renville
Sibley
Stearns
Todd
Wadena
Wright
Recipient
Emmons & Olivier Resources
2013 Fiscal Year Funding Amount
$99,355
Fund Source

This project will complete a pollutant source identification and subwatershed information report and support the development of a Draft Restoration and Protection Plan (RAPP). It will also support the devlopment of a Implementation Plan that will identify target areas for BMP implementation for bacteria reductions.

Anoka
Benton
Carver
Crow Wing
Dakota
Douglas
Hennepin
Kandiyohi
McLeod
Meeker
Mille Lacs
Morrison
Pope
Ramsey
Sherburne
Sibley
Stearns
Todd
Washington
Wright
Recipient
Wenck Associates, Inc.
2013 Fiscal Year Funding Amount
$1,879
Fund Source

This project will support the completion of a final draft Total Maximum Daily Load (TMDL) document for the Osakis, Smith and Faille Lakes TMDL and the submittal to EPA for final approval.

Douglas
Meeker
Morrison
Pope
Stearns
Todd
Recipient
Benton Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$75,000
Fund Source

This project will determine the magnitude and sources of pollutants in Little Rock Creek and will estimate the reductions in loadings that are needed in order for the stream reaches to support cold water fish assemblages and attain water quality standards.

Benton
Morrison
Recipient
Multiple Local Government Units
2010 Fiscal Year Funding Amount
$1,234,350
Fund Source

Currently, there are approximately 5,050 feedlots with fewer than 300 animal units that need to come into compliance with State feedlot rules. Clean Water Feedlot Water Quality Management Grant funds are being used to provide financial assistance to landowners with feedlot operations less than 300 animal units in size and located in a riparian area or impaired watershed.

Aitkin
Benton
Dodge
Douglas
Fillmore
Goodhue
Morrison
Renville
Stearns
Waseca
Washington
Winona
Recipient
Morrison Soil and Water Conservation District
2013 Fiscal Year Funding Amount
$18,575
Fund Source

This site has been monitored for several years due to past storm events causing flood waters that impacted State Highway 371 and Belle Prairie housing developments. This site is contributing large amounts of sediment and is one of the worst erosion sites identified along the Mississippi River in Morrison County.

Morrison
2019 Fiscal Year Funding Amount
$250,000
2018 Fiscal Year Funding Amount
$250,000
2017 Fiscal Year Funding Amount
$250,000
2016 Fiscal Year Funding Amount
$250,000
2015 Fiscal Year Funding Amount
$250,000
2014 Fiscal Year Funding Amount
$250,000
Fund Source

The Minnesota DNR and the Minnesota Forest Resources Council work with forest landowners, managers and loggers to implement a set of voluntary sustainable forest management guidelines that include water quality best management practices (BMPs) to ensure sustainable habitat, clean water, and productive forest soils, all contributing to healthy watersheds. This project will monitor the implementation of these forest management guidelines and BMPs on forested watersheds in MN.

Fillmore
Goodhue
Wabasha
Winona
Carlton
Houston
Koochiching
Lake of the Woods
Mahnomen
Olmsted
Otter Tail
Pine
Roseau
Stearns
Todd
Wadena
Aitkin
Anoka
Becker
Beltrami
Benton
Cass
Clearwater
Cook
Crow Wing
Hubbard
Isanti
Itasca
Kanabec
Lake
Mille Lacs
Morrison
Sherburne
St. Louis
Recipient
Crow Wing Soil and Water Conservation District
2014 Fiscal Year Funding Amount
$20,442
Fund Source

This leadership workshop series will provide the participants (citizen leaders) with knowledge, skills, processes and tools that can help to strengthen their current efforts and nurture new ones.

Aitkin
Becker
Beltrami
Cass
Clearwater
Crow Wing
Douglas
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
Board of Water & Soil Resources
2012 Fiscal Year Funding Amount
$600,000
2013 Fiscal Year Funding Amount
$397,580
Fund Source

BWSR will administer funding to eligible County projects that provide funds and other assistance to low income property owners to upgrade or replace Noncompliant Septic Systems. BWSR will also manage annual reporting completed by each County.

Aitkin
Beltrami
Big Stone
Carlton
Carver
Cass
Chippewa
Chisago
Clearwater
Cook
Cottonwood
Crow Wing
Dakota
Dodge
Douglas
Hubbard
Isanti
Jackson
Kandiyohi
Koochiching
Lac qui Parle
Lake of the Woods
Lincoln
Marshall
McLeod
Morrison
Norman
Olmsted
Pennington
Pine
Pipestone
Polk
Pope
Red Lake
Roseau
Scott
Sibley
St. Louis
Stearns
Steele
Todd
Traverse
Wadena
Waseca
Washington
Wilkin
Winona
Yellow Medicine
Recipient
Emmons & Olivier Resources
2013 Fiscal Year Funding Amount
$77,773
Fund Source

The goal of this project is to develop a TMDL for all impaired stream reaches within the Crow Wing Watershed and for Eighth Crow Wing Lake.

Becker
Cass
Clearwater
Crow Wing
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
Emmons & Olivier Resources (EOR)
2013 Fiscal Year Funding Amount
$31,328
Fund Source

The Crow Wing River Watershed consists of approximately 1,959 square miles in the north to north central portion of the Upper Mississippi River Basin in Central Minnesota. The watershed encompasses all or parts of Becker, Cass, Clearwater, Crow Wing, Hubbard, Morrison, Otter Tail, Todd and Wadena Counties. The dominant land use within the watershed is forested (41%), agriculture (32%), grass, shrub and wetland make up 17%, water (7%) and urban (3%).

Becker
Cass
Clearwater
Crow Wing
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$253,710
Fund Source

The goal of this project is to construct, calibrate, and validate five Hydrologic Simulation Program FORTRAN (HSPF) watershed models. The outcome will be HSPF models that can readily be used to provide information to support conventional parameter TMDLs. These models will generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.

Wright
Todd
Stearns
St. Louis
Sherburne
Morrison
Mille Lacs
Meeker
Kanabec
Itasca
Isanti
Chisago
Cass
Carlton
Benton
Anoka
Aitkin
Recipient
Crow Wing County
2015 Fiscal Year Funding Amount
$31,742
Fund Source

Monitoring the health of Minnesota rivers is vital in determining, maintaining, and improving the health of the rivers for the environment and public use. The scope of this project is to collect surface water chemistry samples at designated sampling locations during appropriate time periods and at appropriate frequencies during these time periods for 1 year beginning in February 2015. The data collected and submitted to MPCA will provide information necessary to determine stream characteristics and calculate water quality pollutant loads.

Benton
Morrison
Todd
Recipient
RESPEC
2011 Fiscal Year Funding Amount
$96,618
Fund Source

This project will support construction of three watershed framework models built using the Hydrologic Simulation Program FORTRAN (HSPF). These executable models will simulate hydrology at the subbasin scale. An HSPF model will be built for each of three major watersheds: the Crow River/North Fork Crow River, the South Fork Crow River, and the Sauk River.

Carver
Douglas
Hennepin
Kandiyohi
McLeod
Meeker
Morrison
Pope
Renville
Sibley
Stearns
Todd
Wright
Recipient
AQUA TERRA Consultants
2011 Fiscal Year Funding Amount
$99,950
Fund Source

This project will support construction of three watershed framework models built using the Hydrologic Simulation Program FORTRAN (HSPF). These executable models will simulate hydrology at the subbasin scale. An HSPF model will be built for each of these major watersheds: Crow Wing River, Redeye River, and Long Prairie River.

Becker
Cass
Clearwater
Crow Wing
Douglas
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$396,300
Fund Source

The goal of this project is to continue and finalize HSPF watershed model construction and complete the calibration/validation process.

Aitkin
Anoka
Becker
Beltrami
Benton
Carlton
Cass
Clearwater
Crow Wing
Hubbard
Isanti
Itasca
Kanabec
Meeker
Mille Lacs
Morrison
Sherburne
St. Louis
Stearns
Todd
Wright
Recipient
RESPEC
2011 Fiscal Year Funding Amount
$149,677
Fund Source

This project will finalize HSPF watershed model construction and complete the calibration/validation process for the following three watersheds: North Fork Crow River, South Fork Crow River, and Sauk River.

Carver
Douglas
Hennepin
Kandiyohi
McLeod
Meeker
Morrison
Pope
Renville
Sibley
Stearns
Todd
Wright
Recipient
Aqua Terra Consultants
2012 Fiscal Year Funding Amount
$120,238
2013 Fiscal Year Funding Amount
$134,980
Fund Source

This project will continue HSPF watershed model construction beyond the initial framework development. The consultant will add representation of point source discharges to the model. The consultant will also compile flow data for the purposes of calibration and validation. Finally, an initial hydrologic calibration will be performed and submitted for approval.

Becker
Cass
Clearwater
Crow Wing
Douglas
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
RESPEC
2016 Fiscal Year Funding Amount
$39,967
Fund Source

The goal of this project is to refine the segmentation, extend the simulation period, and recalibrate an existing Hydrologic Simulation Program FORTRAN (HSPF) watershed model for the Rum River Watershed.

Aitkin
Anoka
Benton
Chisago
Crow Wing
Isanti
Kanabec
Mille Lacs
Morrison
Sherburne
Recipient
University of Minnesota-Extension
2019 Fiscal Year Funding Amount
$110,000
2018 Fiscal Year Funding Amount
$110,000
2017 Fiscal Year Funding Amount
$110,000
2016 Fiscal Year Funding Amount
$110,000
2015 Fiscal Year Funding Amount
$110,000
2014 Fiscal Year Funding Amount
$110,000
Fund Source

Funding supports an Irrigation Specialist to develop guidance and provide education on irrigation and nitrogen best management practices (BMPs). In this position, Dr. Vasu Sharma provides direct support to irrigators on issues of irrigation scheduling and soil water monitoring. She is collaborating on the development of new irrigation scheduling tools that help irrigators manage water and nitrogen resources more precisely. These tools help reduce nitrogen leaching losses in irrigated cropping systems.

Becker
Beltrami
Benton
Big Stone
Blue Earth
Brown
Cass
Chippewa
Clay
Crow Wing
Dakota
Douglas
Goodhue
Grant
Hubbard
Isanti
Kandiyohi
Kittson
Lac qui Parle
Lincoln
Marshall
Meeker
Morrison
Mower
Norman
Otter Tail
Pipestone
Polk
Pope
Red Lake
Renville
Rice
Sherburne
Stearns
Stevens
Swift
Todd
Wabasha
Wadena
Washington
Watonwan
Wright
Recipient
AECOM, Inc.
2010 Fiscal Year Funding Amount
$35,000
Fund Source

Phase 4 of the Lake Winona Total Maximum Daily Load (TMDL) project will finalize the draft Lake Winona TMDL, dated November 2009, by completing additional data analysis, lake quality modeling, updating the TMDL report, and supporting the public involvement process.

Cass
Douglas
Morrison
Otter Tail
Todd
Recipient
Benton SWCD
2014 Fiscal Year Funding Amount
$79,400
Fund Source

Little Rock Creek, a cold-water trout stream in central Minnesota, is impaired due to the lack of trout and other cold water fish. The trout are absent because of high water temperatures, low dissolved oxygen and high nitrate levels, stressors caused from a lack of base flow and overuse of groundwater. This project continues a 2011 initiative to assist irrigators in the Little Rock Creek groundwater recharge area with managing the timing and amount of irrigation applied to their crops.

Benton
Morrison
Recipient
Benton SWCD
2015 Fiscal Year Funding Amount
$227,500
Fund Source

The Little Rock Lake Total Maximum Daily Load study has identified areas in the watershed where phosphorus reduction is needed and what best management practices need to be applied. This is a coordinated implementation effort with Benton and Morrison Soil and Water Conservation Districts and Natural Resources Conservation Service, the Little Rock Lake Association, the livestock industry and other partners to install best management practices at numerous sites to continue cleaning up Little Rock Lake.

Benton
Morrison
Recipient
Emmons & Oliver Resources (EOR)
2016 Fiscal Year Funding Amount
$23,900
Fund Source

This project is to finalize the Total Maximum Daily Loads (TMDLs) and Watershed Restoration & Protection Strategies (WRAPS) for the Red Eye and Long Prairie Watersheds.

Douglas
Morrison
Otter Tail
Todd
Wadena
Recipient
Emmons & Olivier Resources (EOR)
2014 Fiscal Year Funding Amount
$77,128
Fund Source

The goal of this project is to develop a Total Maximum Daily Load (TMDL) for all impaired stream reaches and lakes within the Long Prairie and Red Eye Watersheds.

Douglas
Morrison
Otter Tail
Todd
Wadena