Minnesota's Legacy

All Projects

Showing 1 - 40 of 241 | Export projects
Recipient
Freshwater Society
2011 Fiscal Year Funding Amount
$500
Fund Source

This project will provide support for the 10th Annual Road Salt Symposium at the Minnesota Landscape Arboretum. The symposium brings together environmental organizations, companies that produce winter road de-icing salts and chemicals, scientists, policy-makers and transportation workers. They Symposium provides information on chlorides in our waters and provides innovative and new approaches to help repair our waters and sustain our resources for future generations.

Statewide
Recipient
Cannon River Watershed Partnership
2013 Fiscal Year Funding Amount
$32,421
Fund Source

This project will support the monitoring of two sites on the Cannon River throughout the field seasons of 2013 and 2014 during storm events and baseflow conditions to capture 25 samples per year at each site according to the WPLMN objectives. The information gathered from these samples and site visits will be compiled for reporting purposes and for use in calculating pollutant loading using the FLUX32 model.

Blue Earth
Dakota
Dodge
Freeborn
Goodhue
Le Sueur
Rice
Scott
Steele
Waseca
Recipient
Zumbro Watershed Partnership Inc.
2013 Fiscal Year Funding Amount
$81,122
Fund Source

The MPCA has identified 13 stream sites in the watershed to characterize watershed water quality. This project will supplement and complement the identification of the top 50 sites in the watershed that are contributing to water impairment and also help in identification of priority watersheds in the re-write of the watershed comprehensive plan. Water samples and field measurements will be collected at each monitoring location ranging from baseline events to high flow events.

Dodge
Goodhue
Mower
Olmsted
Rice
Steele
Wabasha
Recipient
Peer Engineering
2012 Fiscal Year Funding Amount
$72,000
Fund Source

Contractor assistance with site selection, reconnaissance and obtaining access for installation of ambient groundwater monitoring wells in Ramsey county and Hennepin county. This project will provide services and oversight of the installation for up to 16 well sites.

Statewide
Recipient
Widseth Smtih Nolting
2014 Fiscal Year Funding Amount
$116,042
Fund Source

Widseth Smith Nolting (WSN) will evaluate and recommend to MPCA groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration. Superfund staff will assist in the project by providing oversight of contractual requirements and provide technical assistance as needed.

Statewide
Recipient
Peer Engineering
2014 Fiscal Year Funding Amount
$115,910
Fund Source

Peer Engineering, Inc. (Peer) will evaluate and recommend to MPCA groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration. Superfund staff will assist in the project by providing oversight of contractual requirements and provide technical assistance as needed.

Dakota
Hennepin
Mower
Rice
Washington
Recipient
Widseth Smtih Nolting
2015 Fiscal Year Funding Amount
$74,429
Fund Source

Widseth Smith Nolting (WSN) will evaluate and recommend to Minnesota Pollution Control Agency (MPCA) groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration.

Statewide
Recipient
Widseth Smith & Nolting
2012 Fiscal Year Funding Amount
$177,052
Fund Source

Contractor assistance with site selection, reconnaissance and obtaining access for installation of ambient groundwater monitoring wells in northcentral and northeastern Minnesota. This project will provide services and oversight of the installation for up to 31 well sites.

Statewide
Recipient
AMEC Geomatrix
2010 Fiscal Year Funding Amount
$80,000
Fund Source

Installation of 35-40 monitoring wells in the 11 county metropolitan area.

Statewide
Recipient
Widseth Smith Nolting (WSN)
2010 Fiscal Year Funding Amount
$20,000
Fund Source

Contractor assistance with site selection, reconnaissance and obtaining access for installation of ambient groundwater monitoring wells in Minnesota. This project will provide services for up to 25 well sites.

Statewide
Recipient
Thein Well Company
2010 Fiscal Year Funding Amount
$73,945
Fund Source

This construction project will provide the installation of (40) wells to support Ambient Groundwater monitoring activities at the MPCA.

Statewide
Recipient
Minnesota Pollution Control Agency
2017 Fiscal Year Funding Amount
$180,000
Statewide
Recipient
Metropolitan Council-Environmental Services
2013 Fiscal Year Funding Amount
$405,500
Fund Source

This project will provide condition monitoring and problem investigation monitoring at the following sites.
Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek.
Minnesota River: Tributaries include Eagle Creek,Riley Creek, and Valley Creek tributary to the St. Croix River

Anoka
Benton
Carver
Chisago
Dakota
Hennepin
Isanti
Le Sueur
McLeod
Meeker
Mille Lacs
Morrison
Nicollet
Pine
Ramsey
Renville
Rice
Scott
Sherburne
Sibley
Stearns
Washington
Wright
Recipient
St. Cloud State University
2010 Fiscal Year Funding Amount
$125,816
Fund Source

This project is a continuation of Statewide Lake study that revealed the obiquitous presence of endrocrine active compounds (EACs) in many MN Lakes. The initial project findings suggested two potential knowledge gaps in our understanding of EACs and their effects in lake environments. First, the sources of EACs and their entrance points into lakes need to be better defined than was possible in our previous statewide lake study.

Statewide
Recipient
University of Minnesota
2012 Fiscal Year Funding Amount
$5,739
2011 Fiscal Year Funding Amount
$148,900
Fund Source

This project will promulgate a nitrate water quality standard to address aquatic life toxicity, and gather information needed to support the development of total nitrogen (N) loading reduction strategies for Minnesota’s waters and also address Minnesota’s contribution to marine water hypoxia. Project will also develop a framework for a watershed nitrogen planning aid that can be used to optimize selection of Best Management Practice (BMP) systems for reducing nitrogen.

Statewide
Recipient
Wenck Associates, Inc.
2012 Fiscal Year Funding Amount
$4,811
Fund Source

This project will support updates to the Draft Bald Eagle Lake TMDL. The updates will address comments received during the public comment period. The comments resulted in the development of individual Wasteload Allocations for stormwater sources in the Bald Eagle Lake watershed.

Anoka
Dakota
Hennepin
Ramsey
Washington
Recipient
Tetra Tech
2013 Fiscal Year Funding Amount
$109,878
Fund Source

The goal of this project is to develop statewide biological criteria for managing the state’s water resources, in keeping with the federal Clean Water Act. The MPCA is using the Biological Condition Gradient (BCG) for this development. The BCG is a conceptual model that describes changes in aquatic ecosystems on a gradient of increasing anthropogenic stress.

Statewide
Recipient
Rhithron Associates
2015 Fiscal Year Funding Amount
$155,860
Fund Source

The purpose of this project is to provide stream and large river macro invertebrate sample processing and identification for the Minnesota Pollution Control agency (MPCA) Biological Monitoring Unit.

The final product will consist of; data submitted electronically to the MPCA, project reference specification, return of all identified specimens, and an external and internal QA/QC report.

Statewide
Recipient
Cannon River Watershed Partnership
2013 Fiscal Year Funding Amount
$47,973
Fund Source

The goal of this project is to use a science-based and participatory approach to understanding and promoting conservation practices in the agricultural community.

Blue Earth
Dakota
Dodge
Freeborn
Goodhue
Le Sueur
Rice
Scott
Steele
Waseca
Recipient
LimnoTech
2014 Fiscal Year Funding Amount
$134,427
Fund Source
The goal of this project is to construct, calibrate, and validate an HSPF watershed model for the Cannon River Watershed.
Dakota
Goodhue
Le Sueur
Rice
Steele
Waseca
Recipient
Zumbro Watershed Partnership, Inc.
2015 Fiscal Year Funding Amount
$106,580
Fund Source
Complete section 3 of Watershed Restoration and Protection Strategy (WRAPS) document for the Cannon and Zumbro Watersheds and provide input to sections 1 and 2.
Dakota
Dodge
Goodhue
Le Sueur
Olmsted
Rice
Steele
Wabasha
Waseca
Recipient
LimnoTech
2015 Fiscal Year Funding Amount
$154,020
2016 Fiscal Year Funding Amount
$6,915
Fund Source

The goal of this project is to apply the Hydrological Simulation Program FORTRAN (HSPF) model to evaluate scenarios to support potential management actions and implementation in the watershed, construct Total Maximum Daily Load (TMDL) studies, and to develop a conceptual site model of the lakes for understanding phosphorus release.

Dakota
Goodhue
Le Sueur
Rice
Steele
Recipient
Washington Conservation District
2012 Fiscal Year Funding Amount
$14,142
Fund Source

This project addresses the identified need for an Implementation Plan that provides an overall roadmap for the effort it will take to meet the Carnelian Marine St. Croix Multi-Lakes Total Maximum Daily Load (TMDL). An Implementation Plan will be developed, with involvement of the Project Partners and stakeholder groups, that sets forth prioritized strategies for attaining the TMDL and a method for tracking the progress of those efforts. The Implementation Plan will be restoration-focused, but will include protection-oriented information/actions as well.

Anoka
Chisago
Isanti
Pine
Ramsey
Washington
Recipient
Washington Conservation District
2010 Fiscal Year Funding Amount
$103,598
Fund Source

Continued TMDL project to support next phases associated with completion of TMDL's for ten lakes in the Carnelian Marine Saint Croix Watershed District (CMSCWD). Ten lakes are; East Boot, Fish, Goose, Hay, Jellum’s, Long, Loon, Louise, Mud and South Twin.

Anoka
Chisago
Isanti
Pine
Washington
Recipient
Cass County Environmental Services Department
2010 Fiscal Year Funding Amount
$198,971
Fund Source

This monitoring project includes lake and stream monitoring and encompasses all of Cass County, and surrounding counties. The project will obtain water quality data for streams; in 2009, lakeshed assessments indicated that many surface waters throughout the county were data deficient. This project will address the need for sufficient data on a county-wide basis and fulfill the State’s intensive watershed monitoring program goals by obtaining water quality data at targeted lake and stream sites.

Aitkin
Becker
Beltrami
Carlton
Cass
Clearwater
Crow Wing
Hubbard
Itasca
Morrison
Otter Tail
St. Louis
Todd
Wadena
Recipient
Axys Analytical Services, Ltd.
2015 Fiscal Year Funding Amount
$140,535
Fund Source

This study will test groundwater and drain tile waters at concentrated animal feedlot opperations (CAFOs) to evaluate the presence of intibiotics and hormones. Samples will be collected from monitoring wells, tile drain sumps, and tile line discharges.

Water samples will be sent to Axys Analytical Services as they are colleced from each monitoring site. A total of 18 samples will be generated in the field by pumping ultrapure water through the sampling system.

Statewide
Recipient
City of Roseville
2013 Fiscal Year Funding Amount
$100,000
Fund Source

The Villa Park Wetland Restoration Project proposes sediment removal from 6 contiguous stormwater wetland treatment cells within the Villa Park Wetland system resulting in an additional 118lbs/yr of total phosphorus(TP) removal from water entering Lake McCarrons.

Anoka
Carver
Dakota
Hennepin
Ramsey
Sherburne
Washington
Wright
Recipient
Minnesota Association of Soil and Water Conservation Districts (MASWCD)
2011 Fiscal Year Funding Amount
$1,500
Fund Source

This project will provide Soil and Water Conservation Districts the opportunity to nominate an individual, business, company, municipality or organization for their concern, cooperation and/or implementation of conservation practices in a community environment. This award recognizes nominees that have excelled in a variety of categories which include: storm water management; land use conservation planning and implementation, and leadership relating to community conservation practices.

Statewide
Recipient
University of Minnesota Office of Sponsored Projects Administration (SPA)
2015 Fiscal Year Funding Amount
$145,000
2014 Fiscal Year Funding Amount
$145,000
Fund Source

The goal of this project is to develop a core team of wastewater professionals and academics engaged in understanding and solving wastewater-related problems in Minnesota, with national relevance. The team will promote the use of new technology, designs and practices to address existing and emerging wastewater treatement challenges, including the treatement of wastewater for reuse and the emergence of new and unregulated contaminants.

Statewide
Recipient
Minnesota Pollution Control Agency
2010 Fiscal Year Funding Amount
$155,000
Fund Source

This project will provide notification of the potential for coal tar contamination, establish a storm water pond inventory schedule, and develop best management practices for treating and cleaning up contaminated sediments. The sampling design includes 15 stormwater ponds, 5 each from residential, commercial, and industrial land use areas. Municipalities in the metro area with MS4 permits of stormwater ponds will be contacted to nominate candidate sites for this study. GPS coordinates will be taken at all sampling sites.

Statewide
Recipient
United States Geological Survey (USGS)
2010 Fiscal Year Funding Amount
$146,602
Fund Source

USGS will complete the following activities in support of the SCSU project Assessing the Contribution of Microhabitat Differences on Biological Effects in Bluegill Sunfish in Sullivan Lake, MN-Continuation of MN Lakes Study 2010-2011. Geospatial analysis of maps, aerial photography, satellite imagery, GIS data, and field mapping (topography, bathymetry, vegetation, habitat); Bulk characterization of the physical and chemical features of the littoral zone, inflows, and outflows.

Statewide
Recipient
Cook County SWCD
2019 Fiscal Year Funding Amount
$2,570
Fund Source

In conjunction with the Board of Soil and Water Resources (BWSR), the Minnesota Pollution Control Agency (MPCA) is developing a process for public participation that can be used across Minnesota Water Quality Framework programs such as 1 Watershed, 1 Plan, Watershed Restoration and Protection Strategies (WRAPS), Total Maximum Daily Load (TMDL) studies, and others. This contract will provide support for a northern Minnesota Soil and Water Conservation District (SWCD) to assist in shaping the statewide guidance.

Statewide
Recipient
Board of Water and Soil Resources
2014 Fiscal Year Funding Amount
$2,574,731
2015 Fiscal Year Funding Amount
$2,909,980
2016 Fiscal Year Funding Amount
$2,753,907
2017 Fiscal Year Funding Amount
$2,429,331
2018 Fiscal Year Funding Amount
$2,696,395
2019 Fiscal Year Funding Amount
$2,599,600
Fund Source

The Minnesota Pollution Control Agency (MPCA) offers grants to counties for Subsurface Sewage Treatment System (SSTS) program administration and special projects to improve SSTS compliance rates, and assistance for low-income homeowners with needed SSTS upgrades. The MPCA will determine grant allocations based on applications review; funds will flow to counties through the Board of Water and Soil Resources' Natural Resources Block Grants.

Statewide
Recipient
Randy S. Ferrin
2011 Fiscal Year Funding Amount
$4,997
Fund Source

The Contractor will assist in planning and executing the regular meetings of the St. Croix River Basin Team, including providing minutes of the meetings. Assist in the functioning of the priority issue subcommittees. Respond to public notices for re-issuances of NPDES permits, EAWs and other pertinent public notices, and participate in prioritized public meetings with local governmental units and water planning organizations.

Anoka
Chisago
Isanti
Pine
Ramsey
Washington
Recipient
Wadena Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$30,000
Fund Source

This project will provide Stressor ID work and assistance for the development of a work plan for the Major Watershed Project. The Major Watershed Project will include a plan for civic engagement and outreach, with assistance from ten Local Government Units from the Crow Wing River Watershed.

Becker
Cass
Clearwater
Crow Wing
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
Emmons & Olivier Resources (EOR)
2013 Fiscal Year Funding Amount
$51,477
Fund Source

This project will develop a TMDL for all impaired lakes within the Crow Wing Watershed by furthering data collection in the watershed, analysis of data, allocation calculations, and introducing outreach and stakeholder participation activities.

Wadena
Crow Wing
Clearwater
Todd
Cass
Otter Tail
Becker
Morrison
Hubbard
Recipient
Wadena Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$30,000
Fund Source

This project will initiate project coordination among project partners. It will enhance civic engagement and outreach endeavors activities to support Phase 2 of TMDL project. It will also support field activities associated with stressor ID work.

Becker
Cass
Clearwater
Crow Wing
Hubbard
Morrison
Otter Tail
Wadena
Recipient
Crow Wing Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$45,964
Fund Source

This project will collect a complete Trophic Site Index (TSI) data set for Crow Wing County lakes and a complete data set for streams and rivers for the Intensive Monitoring Program (IMP). Crow Wing County, Cass County, Wadena County, Morrison County and Hubbard County are partnering to ensure that all target lakes and rivers within the Crow Wing River watershed are monitored efficiently.

Aitkin
Becker
Cass
Clearwater
Crow Wing
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
Emmons & Olivier Resources
2012 Fiscal Year Funding Amount
$15,041
Fund Source

This first year of the project will collect available data relevant to the TMDL development, determine the data sets best suited for the TMDL development. Gain a better understanding of the watershed and impaired lakes, and assessment of all potential sources (internal and external) of the causes of lake impairment. EOR will also review the data produced by the MPCA for the impairment assessment for each of the lakes during year 1 of the project.

Becker
Cass
Clearwater
Crow Wing
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
Wenck Associates, Inc.
2012 Fiscal Year Funding Amount
$29,872
Fund Source

This project willl complete a final TMDL document that will be submitted to EPA for approval. Document will include Lake Osakis, Clifford Lake, Faille Lake, and Smith Lake impairments. A final technical memorandum describing the elements of the model framework and any deviations from the recommended construction methodology will be also be provided with the submission of the watershed models.

Douglas
Morrison
Otter Tail
Todd
Wadena