Recipient
RESPEC
2013 Fiscal Year Funding Amount
$49,986
Fund Source

The goal of this project is to continue and finalize Hydrologic Simulation Program FORTRAN (HSPF) watershed model construction and complete the calibration/validation process. The project will add representation of point source discharges to the model, compile flow and water quality data for the purposes of calibration and validation. The end result will be an HSPF watershed model that can readily be used to provide information to support conventional parameter TMDLs.

Mahnomen
Norman
Polk
Recipient
Cannon River Watershed Partnership
2013 Fiscal Year Funding Amount
$32,421
Fund Source

This project will support the monitoring of two sites on the Cannon River throughout the field seasons of 2013 and 2014 during storm events and baseflow conditions to capture 25 samples per year at each site according to the WPLMN objectives. The information gathered from these samples and site visits will be compiled for reporting purposes and for use in calculating pollutant loading using the FLUX32 model.

Blue Earth
Dakota
Dodge
Freeborn
Goodhue
Le Sueur
Rice
Scott
Steele
Waseca
Recipient
Zumbro Watershed Partnership Inc.
2013 Fiscal Year Funding Amount
$81,122
Fund Source

The MPCA has identified 13 stream sites in the watershed to characterize watershed water quality. This project will supplement and complement the identification of the top 50 sites in the watershed that are contributing to water impairment and also help in identification of priority watersheds in the re-write of the watershed comprehensive plan. Water samples and field measurements will be collected at each monitoring location ranging from baseline events to high flow events.

Dodge
Goodhue
Mower
Olmsted
Rice
Steele
Wabasha
Recipient
University of Minnesota
2016 Fiscal Year Funding Amount
$500,000
Fund Source

These funds are being used to systematically collect data and produce statistically valid estimates of the rate of soil erosion and tracking the adoption of high residue cropping systems in in the 67 counties with greater than 30% land in agricultural row crop production. Designed to establish a long term program in Minnesota to collect data and produce county, watershed, and state wide estimates of soil erosion caused by water and wind along with tracking adoption of conservation measures to address erosion.

Becker
Benton
Big Stone
Blue Earth
Brown
Carver
Chippewa
Chisago
Clay
Cottonwood
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Houston
Isanti
Jackson
Kandiyohi
Kittson
Lac qui Parle
Le Sueur
Lincoln
Lyon
Mahnomen
Recipient
Benton SWCD
2017 Fiscal Year Funding Amount
$200,000
Fund Source

This project targets nutrient reductions within the Mayhew and Big Elk Lake watersheds. The Benton Soil and Water Conservation District will work with farmers in implementing a variety of conservation practices including, but not limited to cropland erosion control projects, riparian pasture management, and nutrient management and feedlot pollution control systems. These strategies were identified through Total Daily Maximum Load Studies.

Benton
Sherburne
Recipient
Benton SWCD
2017 Fiscal Year Funding Amount
$200,000
Fund Source

Little Rock Lake experiences severe algae blooms due to excess phosphorus and these blooms are the worst known regionally. The goal of this project is to reduce algae blooms, improve water clarity, and avoid risk of drinking water contamination. The project will result in installing one farmer nutrient management project , four cover crops, two lakeshore buffer strips, six septic systems that also demonstrated an imminent threat to public health, six erosion control projects , one wetland restored, and one feedlot runoff control system.

Benton
Morrison
Recipient
Elk River Watershed Association
2017 Fiscal Year Funding Amount
$182,500
Fund Source

A completed Total Maximum Daily Load (TMDL) study has identified mid to late summer phosphorus loading as a significant stressor to lakes and streams within the Big Elk Lake watershed. While this comprehensive study serves its role as the unifying document that identifies pollutants and sources, further work is required in order to develop site-specific Best Management Practices, design these practices, and oversee their implementation in order to reach clean water goals.

Benton
Sherburne
Recipient
Benton SWCD
2017 Fiscal Year Funding Amount
$6,600
Fund Source

The Benton County Water Plan advisory committee has the goal of protecting groundwater resources in Benton County. One of the methods identified is to seal unused wells. In 2013, Benton Soil and Water Conservation District completed an aggressive campaign to identify unused wells. We used several sources to locate potential wells, completed site visits for many wells and collected site information to assisting in prioritizing limited cost share resources.

Benton
Recipient
University of Minnesota
2016 Fiscal Year Funding Amount
$500,000
Fund Source

These funds are being used to systematically collect data and produce statistically valid estimates of the rate of soil erosion and tracking the adoption of high residue cropping systems in counties with greater than 30% land in agricultural row crop production. Designed to establish a long term program in Minnesota to collect data and produce county, watershed, and state wide estimates of soil erosion caused by water and wind along with tracking adoption of conservation measures to address erosion.

Becker
Benton
Big Stone
Blue Earth
Brown
Carver
Chippewa
Chisago
Clay
Cottonwood
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Houston
Isanti
Jackson
Kandiyohi
Kittson
Lac qui Parle
Le Sueur
Lincoln
Lyon
Mahnomen
Recipient
Benton SWCD
2019 Fiscal Year Funding Amount
$175,000
Fund Source

These funds will be utilized in cost-share for landowners to install Agricultural Best Management Practices following Little Rock Lake TMDL Implementation Plan. Example of projects include Feedlot Improvements, Waste Storage Facilities, Erosion Control BMPs, Filter Strips and Streambank Stabilizations. An estimated 830 pounds per year of phosphorus and 800 tons of sediment will be reduced annually.

Benton
Morrison
Recipient
Benton SWCD
2019 Fiscal Year Funding Amount
$456,500
Fund Source

The goal of this project is to achieve a 10% reduction in overall sediment discharge to the Mississippi River from the Northeast St. Cloud Drainage Area by installing one regional underground stormwater detention and treatment facility in partnership with a Neighborhood Redevelopment Project. The project will have over 16,000 cubic feet of water storage capacity treating 35 acres of stormwater runoff and is modeled to reduce sediment by 4.5 tons, which is 10% of the sediment reduction goal for this drainage area.

Benton
Recipient
Wadena Soil and Water Conservation District
2013 Fiscal Year Funding Amount
$145,000
Fund Source

Most of Hubbard, Todd and Wadena Counties' irrigated acreage consists of highly permeable, low water holding capacity, sandy textured soils overlying shallow and buried sand and gravel aquifers. These aquifers are very susceptible to non-point water quality degradation from land use practices.

Wadena
Recipient
SE SWCD Technical Support JPB
2013 Fiscal Year Funding Amount
$613,047
Fund Source

This project will fully fund three Nonpoint Engineering Assistance (NPEA) Joint Powers Board positions in cooperation with the NPEA Base Funding anticipated at $130,000 per year. This will allow a 2nd Professional Engineer to be retained in addition to a Lead Engineer and Technician. This 'accelerated' engineering previously was funded with BWSR Challenge Grants, and an EPA319 grant with corresponding BWSR CWF Matching Grant to handle the high workload associated with the large number of BWSR feedlot cost-share projects approved in South East Minnesota.

Dodge
Fillmore
Freeborn
Goodhue
Houston
Mower
Olmsted
Rice
Steele
Wabasha
Winona
Recipient
SE SWCD Technical Support JPB
2013 Fiscal Year Funding Amount
$333,120
Fund Source

This project will extend two Feedlot Technical positions initially created and funded by a FY2011 CWF Feedlot Water Quality Grant that assess and help fix animal waste runoff from small feedlots. The technicians will work with and under the Technical Authority and priorities of the South East Soil and Water Conservation District Tech Support JPB lead Engineer. This project will enable more projects to be constructed resulting in a reduction of nitrogen, phosphorus and fecal coliform runoff into surface and ground water in South East Minnesota and the Mississippi River.

Dodge
Fillmore
Freeborn
Goodhue
Houston
Mower
Olmsted
Rice
Steele
Wabasha
Winona
Recipient
Area 1 - Red River Valley Conservation Service Area
2014 Fiscal Year Funding Amount
$250,000
Fund Source

The Accelerated Water Quality Project Implementation Program will increase the connection between landowners, local government units and the landscape to accelerate efforts addressing non-point source loading to surface waters throughout the Red River Valley Conservation Service Area.

Becker
Beltrami
Clay
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Traverse
Wilkin
Recipient
Minnesota Geological Survey
2014 Fiscal Year Funding Amount
$615,000
2015 Fiscal Year Funding Amount
$615,000
Fund Source

This project will accelerate production of County Geologic Atlases (part A). An atlas is a set of geologic maps and associated databases for a county that facilitate informed management of natural resources, especially water and minerals.

Brown
Cass
Dodge
Hennepin
Isanti
Lake
Redwood
St. Louis
Wadena
Washington
Recipient
Afton, City of
2017 Fiscal Year Funding Amount
$5,742,716
Fund Source

Construct sewer collection and treatment system for unsewered area

Washington
Recipient
Afton, City of
2011 Fiscal Year Funding Amount
$19,836
Fund Source

Evaluate alternatives to fix failing subsurface sewage treatment systems

Washington
Recipient
Farmers, Rural Landowners, and Agricultural Supply Businesses
2019 Fiscal Year Funding Amount
$75,000
2018 Fiscal Year Funding Amount
$75,000
2017 Fiscal Year Funding Amount
$75,000
2016 Fiscal Year Funding Amount
$75,000
2015 Fiscal Year Funding Amount
$200,000
2014 Fiscal Year Funding Amount
$200,000
2013 Fiscal Year Funding Amount
$4,500,000
2012 Fiscal Year Funding Amount
$4,500,000
2011 Fiscal Year Funding Amount
$2,500,000
2010 Fiscal Year Funding Amount
$2,000,000
Fund Source

The AgBMP Loan Program provides needed funding for local implementation of clean water practices at an extremely low cost, is unique in its structure and is not duplicated by any other source of funding.The AgBMP loan program provides 3% loans through local lenders to farmers, rural landowners, and agriculture supply businesses.

Anoka
Becker
Blue Earth
Brown
Carver
Cook
Cottonwood
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Houston
Hubbard
Jackson
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
Morrison
Mower
Murray
Nicollet
Olmsted
Pipestone
Pope
Redwood
Renville
Rice
Rock
Scott
Sherburne
Sibley
St. Louis
Stearns
Steele
Stevens
Todd
Traverse
Wabasha
Waseca
Washington
Watonwan
Winona
Yellow Medicine
Recipient
Peer Engineering
2014 Fiscal Year Funding Amount
$115,910
Fund Source

Peer Engineering, Inc. (Peer) will evaluate and recommend to MPCA groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration. Superfund staff will assist in the project by providing oversight of contractual requirements and provide technical assistance as needed.

Dakota
Hennepin
Mower
Rice
Washington
Recipient
Benton SWCD
2010 Fiscal Year Funding Amount
$16,500
Fund Source

This project continues water plan activities from a 2007 Clean Water Legacy grant and initiates a multi-county project to restore hydrology and water quality in an impaired trout stream.The first goal of this project is to reduce the impacts of animal manure and fertilizer on surface and groundwater by installing low cost feedlot improvements and targeted manure management planning.

Benton
Recipient
Anoka Conservation District
2010 Fiscal Year Funding Amount
$400,000
Fund Source

A direct appropriation of $400,000 in FY 2010 for the Anoka Conservation District (ACD) is for the metropolitan landscape restoration program for water quality and improvement projects in the seven-county metro area (the law also provides $600,000 for this purpose in FY2011).

Anoka
Carver
Dakota
Hennepin
Ramsey
Scott
Washington
Recipient
Anoka Conservation District
2011 Fiscal Year Funding Amount
$600,000
Fund Source

A direct appropriation of $400,000 in FY 2010 and $600,000 in FY2011 for the Anoka Conservation District (ACD) is for the metropolitan landscape restoration program for water quality and improvement projects in the seven-county metro area.

Anoka
Carver
Dakota
Hennepin
Ramsey
Scott
Washington
Recipient
University of St. Thomas
2014 Fiscal Year Funding Amount
$203,000

The occurrences of contaminants including antibiotics, other pharmaceuticals, and personal care products in the environment have gained increasing attention in recent years because of their potential health and ecological impacts. However, serious gaps remain in our understanding of these contaminants and the significance of the threats they may pose, such as to drinking water. Through this appropriation scientists at the University of St.

Anoka
Dakota
Goodhue
Hennepin
Ramsey
Sherburne
Stearns
Wabasha
Wright
Recipient
Minnesota Humanities Center
2018 Fiscal Year Funding Amount
$150,000
Fund Source

The goal of this project is to use the We Are Water MN exhibit and their technical knowledge in relationship-building and storytelling to increase community capacity for sustainable watershed management in the Cannon River, Cedar River, Mississippi-Headwaters, Mississippi-Grand Rapids, Mississippi-Twin Cities, Red Lake River, Rum River and St. Louis River watersheds.

Benton
Carlton
Dakota
Hennepin
Itasca
Mille Lacs
Mower
Polk
Recipient
Washington Conservation District
2011 Fiscal Year Funding Amount
$48,270
Fund Source

The Washington Conservation District (WCD), Washington County, and South Washington Watershed District (SWWD) are partnering to retrofit water quality improvement practices at the Oakdale Library. The goal is clean water and the project will work toward the 101 pound phosphorus load reduction target for Armstrong Lake identified in the SWWD Watershed Plan. The project will also benefit Wilmes Lake, which is downstream from Armstrong and is impaired by excess nutrients.

Washington
Recipient
Metropolitan Council-Environmental Services
2013 Fiscal Year Funding Amount
$405,500
Fund Source

This project will provide condition monitoring and problem investigation monitoring at the following sites.
Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek.
Minnesota River: Tributaries include Eagle Creek,Riley Creek, and Valley Creek tributary to the St. Croix River

Anoka
Benton
Carver
Chisago
Dakota
Hennepin
Isanti
Le Sueur
McLeod
Meeker
Mille Lacs
Morrison
Nicollet
Pine
Ramsey
Renville
Rice
Scott
Sherburne
Sibley
Stearns
Washington
Wright
Recipient
Metropolitan Council/University of Minnesota - Minnesota Technical Assistance Program (MnTAP)
2012 Fiscal Year Funding Amount
$11,243
2013 Fiscal Year Funding Amount
$36,453
2014 Fiscal Year Funding Amount
$45,337
Fund Source

Working with the Metropolitan Council, the University of Minnesota - Minnesota Technical Assistance Program (MnTAP) is investigating the opportunity for water conservation by private industrial water users across the Twin Cities metropolitan region. Private industrial water users are defined as industries that use private wells for their water supply. This work is determining factors that encourage or create barriers for implementation of identified industrial water conservation opportunities.

Anoka
Carver
Dakota
Hennepin
Ramsey
Scott
Washington
Recipient
Benton Soil and Water Conservation District
2016 Fiscal Year Funding Amount
$431,000
Benton
Morrison
Recipient
Wenck Associates, Inc.
2012 Fiscal Year Funding Amount
$4,811
Fund Source

This project will support updates to the Draft Bald Eagle Lake TMDL. The updates will address comments received during the public comment period. The comments resulted in the development of individual Wasteload Allocations for stormwater sources in the Bald Eagle Lake watershed.

Anoka
Dakota
Hennepin
Ramsey
Washington
Recipient
Comfort Lake-Forest Lake WD
2014 Fiscal Year Funding Amount
$360,750
Fund Source

This project will focus, on a sub-regional scale, on water quality improvements targeted at concentrated runoff flows generated from upstream, developed portions of the City of Forest Lake. This project will work to modify an existing wetland complex located in publicly owned Bixby Park of Forest Lake to increase water quality treatment potential and storage capacity. The project will also incorporate an innovative iron-enhanced sand filter which will remove dissolved phosphorus, resulting in a 206 pound/year reduction of phosphorous and a 27 tons/year removal of sediment.

Washington
Recipient
Washington Conservation District
2016 Fiscal Year Funding Amount
$160,000
Fund Source

In recent years, nutrient enrichment has occurred in Lake St. Croix due to increasing amounts of phosphorus entering the lake from the watershed. According to the TMDL, approximately half of the phosphorus-loading to Lake St. Croix is in the soluble form, and agriculture has been identified as one of the largest contributors of that phosphorus. In addition to the TMDL, subwatershed analyses were completed to identify, assess, and prioritize phosphorus-reducing practices in rural areas draining to Lake St. Croix in Washington County. This project will reduce phosphorus discharges to the St.

Washington
Recipient
Comfort Lake-Forest Lake WD
2019 Fiscal Year Funding Amount
$144,000
Fund Source

This project proposes the implementation of 10 best management practices identified as having the lowest cost-benefit ratio as it relates to phosphorus reduction to downstream Moody and Bone Lakes with an estimated reduction to watershed phosphorus loads to Bone Lake by 90 pounds per year and to Moody Lake by 24 pounds per year. The Bone Lake watershed is at the ?top? of the larger watershed, making it an ideal location to begin work that will have direct improvements downstream.

Chisago
Washington
Recipient
Comfort Lake-Forest Lake WD
2017 Fiscal Year Funding Amount
$88,000
Fund Source

Bone Lake and upstream Moody Lake are the headwaters of the Comfort Lake-Forest Lake Watershed District northern flow network, and as such, their water quality sets the stage for downstream waters, particularly Comfort Lake, the Sunrise River, and ultimately Lake St. Croix. This project proposes the implementation of six wetland restorations located along the tributary identified as the single highest source of phosphorus loading to Bone Lake. These wetland restorations are estimated to reduce watershed phosphorus loads to Bone Lake by 50 pounds per year.

Chisago
Washington
Recipient
Brown's Creek Watershed District
2013 Fiscal Year Funding Amount
$72,500
Fund Source

Brown's Creek Watershed District, the MN DNR Trails and Countryside Auto Repair will partner to achieve significant thermal and sediment reductions in the biologically impaired Brown's Creek by installing one large scale rain garden with infiltration, one pretreatment chamber for sediment capture off of parking and drive lanes, and a two cell bio-filtration garden. The entire project site is intensely utilized, drains untreated water to Brown's Creek, and is located on the developing Brown's Creek State Trail.

Washington
Recipient
Brown's Creek Watershed District
2013 Fiscal Year Funding Amount
$45,000
Fund Source

Brown's Creek Watershed District (BCWD) has identified this project as a part of the Brown's Creek TMDL Implementation. The identified untreated residential development in Stillwater directly contributes stormwater to Brown's Creek, a DNR designated trout stream currently impaired for turbidity and lack of cold water assemblage. The main stressors for Brown's Creek are total suspended solids and thermal loading.

Washington
Recipient
Browns Creek WD
2014 Fiscal Year Funding Amount
$33,500
Fund Source

Brown's Creek is one of the few remaining cold water fisheries in the Metropolitan Area; however, it is impaired due to high suspended solids and high water temperatures. To understand the extensive and complex in-stream temperature and local climate data already collected by the Brown's Creek Watershed District, this grant will facilitate the development of a thermal model to determine thermal sources and cost-effective management projects and practices to reduce thermal loading to Brown's Creek.

Washington
Recipient
Browns Creek WD
2015 Fiscal Year Funding Amount
$204,350
Fund Source

The Watershed District is partnering with the City of Stillwater to reduce sediment and thermal loading to Brown's Creek from existing impervious gravel parking lot and paved roads to achieve Total Maximum Daily Load water quality goals in this reach of Brown's Creek.

Washington
Recipient
Browns Creek WD
2017 Fiscal Year Funding Amount
$51,525
Fund Source

The purpose of the project is to target the type and location of riparian vegetation restoration needed to shade three miles of unforested buffer on Brown's Creek, a metro area trout stream impaired for thermal and sediment loading. The project will conduct a riparian shading analysis, cost-benefit analysis, and modeling of restoration scenarios based on field measurements of shade in the unforested buffer of Brown's Creek.