Minnesota's Legacy

All Projects

Showing 1 - 40 of 53 | Export projects
Recipient
Chippewa River Watershed Project
2013 Fiscal Year Funding Amount
$136,325
Fund Source

This project will work with the MPCA to conduct watershed pollutant load monitoring at four sites in the Chippewa River watershed and one site in the neighboring Pomme de Terre River watershed . The Chippewa River Watershed Project (CRWP) team will also aid the MPCA in measuring and comparing regional differences and long-term trends in water quality. The goal is to collect quality data and complete load calculations for the five sites using the MPCA's established protocols.

Big Stone
Chippewa
Douglas
Grant
Kandiyohi
Otter Tail
Pope
Stearns
Stevens
Swift
Recipient
Pomme de Terre River Association JPB
2015 Fiscal Year Funding Amount
$387,146
Fund Source

The Pomme de Terre River Association has targeted and identified specific areas and activities required for marked water quality improvement. This project will implement of 16 Water and Sediment Control Basins (WASCOBs), 28 Rain Gardens, 2 Shoreline/ Stream bank stabilization, 10 Waste Pit Closures, 1 Terrace Project, and the enrollment of 1900 acres into conservation practices. These practices in total will directly result in site-specific and watershed-dependent reductions of 17,801 tons of sediment and 17,784 pounds of phosphorous from entering surface waters yearly in the watershed.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Pomme de Terre River Association JPB
2017 Fiscal Year Funding Amount
$431,587
Fund Source

The goal of the Pomme de Terre River Association (JPB) is to improve the local water resources within the watershed through targeted voluntary efforts and the building of strong relationships with local landowners, producers, and citizens. The Pomme de Terre River is currently not meeting state water quality for sediment. The purpose of this project is to strategically work towards a 53% sediment reduction goal at the mouth of the Pomme de Terre River based on a Watershed Restoration and Protection Strategy document.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Area 1 - Red River Valley Conservation Service Area
2014 Fiscal Year Funding Amount
$250,000
Fund Source

The Accelerated Water Quality Project Implementation Program will increase the connection between landowners, local government units and the landscape to accelerate efforts addressing non-point source loading to surface waters throughout the Red River Valley Conservation Service Area.

Becker
Beltrami
Clay
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Traverse
Wilkin
Recipient
Metropolitan Council-Environmental Services
2013 Fiscal Year Funding Amount
$405,500
Fund Source

This project will provide condition monitoring and problem investigation monitoring at the following sites.
Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek.
Minnesota River: Tributaries include Eagle Creek,Riley Creek, and Valley Creek tributary to the St. Croix River

Anoka
Benton
Carver
Chisago
Dakota
Hennepin
Isanti
Le Sueur
McLeod
Meeker
Mille Lacs
Morrison
Nicollet
Pine
Ramsey
Renville
Rice
Scott
Sherburne
Sibley
Stearns
Washington
Wright
Recipient
Minnesota River Board
2012 Fiscal Year Funding Amount
$91,691
Fund Source

This project will support a civic engagement cohort that will be offered in southwest Minnesota to foster partnering and build capacity of local government, organizations, and residents for effective civic engagement in water protection and restoration. This project will also build networks and the skill set of local resource professionals to do effective civic engagement work for water restoration and protection. The cohort will be administered through the Minnesota River Board (MRB), established in 1995 with a goal of focusing water management efforts on the local level.

Big Stone
Blue Earth
Brown
Chippewa
Cottonwood
Douglas
Faribault
Grant
Jackson
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
McLeod
Murray
Nicollet
Nobles
Otter Tail
Pipestone
Pope
Redwood
Renville
Rock
Sibley
Stevens
Swift
Traverse
Waseca
Watonwan
Yellow Medicine
Recipient
Emmons & Olivier Resources
2013 Fiscal Year Funding Amount
$99,355
Fund Source

This project will complete a pollutant source identification and subwatershed information report and support the development of a Draft Restoration and Protection Plan (RAPP). It will also support the devlopment of a Implementation Plan that will identify target areas for BMP implementation for bacteria reductions.

Anoka
Benton
Carver
Crow Wing
Dakota
Douglas
Hennepin
Kandiyohi
McLeod
Meeker
Mille Lacs
Morrison
Pope
Ramsey
Sherburne
Sibley
Stearns
Todd
Washington
Wright
Recipient
Pomme de Terre River Association
2013 Fiscal Year Funding Amount
$216,600
Fund Source

This project will allow for outreach programs to engage interested citizens in protecting 200 acres of riparian buffer in the headwaters of the watershed, accounting for 1860 tons of sediment prevented from reaching surface waters each year the practices remain in place. The desired outcome would include 30 or more participants in the program, and to develop a more extensive volunteer base.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Headwaters Science Center
2016 Fiscal Year Funding Amount
$57,028
Fund Source

This project will conduct water quality monitoring at 12 stream sampling sites. The sites will be monitored for chemical, physical, and bacteriological parameters over a two year time-period. The Headwaters Science Center (HSC) will be the lead agency and arrange volunteer cooperation from Trek North, Bemidji, Perham and/or Detroit Lakes High School students and their instructors. The HSC project lead will be responsible for oversight and full compliance to MPCA protocols.

Otter Tail
Recipient
RESPEC
2011 Fiscal Year Funding Amount
$214,963
Fund Source

This project will complete spatial and temporal revisions of 6 Hydrologic Simulation Program FORTRAN (HSPF) models, the recalibration and validation of 7 watershed HSPF models, and the revision of the drainage network and point source representation of the Pomme de Terre HSPF model.

Big Stone
Blue Earth
Brown
Carver
Cottonwood
Dakota
Douglas
Faribault
Freeborn
Grant
Hennepin
Jackson
Le Sueur
Lincoln
Lyon
Mahnomen
Martin
McLeod
Murray
Nicollet
Norman
Otter Tail
Pipestone
Polk
Ramsey
Redwood
Renville
Rice
Scott
Sibley
Steele
Stevens
Swift
Waseca
Watonwan
Yellow Medicine
Recipient
Otter Tail, East SWCD
2017 Fiscal Year Funding Amount
$58,000
Fund Source

The purpose of this project is to identify effective irrigation and nutrient management best management practices and technologies and the barriers that prevent irrigators, producers, and other agricultural partners from adopting them in Otter Tail County. The primary goal is to reduce nitrate in areas where groundwater is susceptible to contamination as mapped by The Minnesota Department of Health by identifying effective BMPs and addressing the barriers to their adoption.

Becker
Douglas
Otter Tail
Todd
Wadena
Recipient
LimnoTech
2019 Fiscal Year Funding Amount
$11,920
Fund Source

The goal of this project is to finalize the Lake Pepin Watershed phosphorus total maximum daily load (TMDL) report by using the existing information and documentation prepared under previous contracts to prepare one TMDL report that addresses the impairments on the mainstem of the Mississippi River. Information developed to date for draft TMDLs on the Minnesota River mainstem will be documented for later use by the Minnesota Pollution Control Agency.

Anoka
Blue Earth
Brown
Carver
Chippewa
Cottonwood
Dakota
Goodhue
Hennepin
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
McLeod
Nicollet
Ramsey
Redwood
Renville
Rice
Scott
Sibley
Wabasha
Washington
Yellow Medicine
Recipient
Stevens Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$13,986
Fund Source

This project will complete data collection on 11 lakes over a 2 year period in the Pomme de Terre Watershed. The data collected will be be used in the Major Watershed Project proposed for this watershed.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Metropolitan Council
2010 Fiscal Year Funding Amount
$326,500
Fund Source

This project will provide condition monitoring and problem investigation monitoring at the following sites. Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek. Minnesota River: Tributaries include Eagle Creek, Riley Creek, and Willow Creek. St. Croix River: Tributary includes Valley Creek.

Wright
Washington
Stearns
Sibley
Sherburne
Scott
Rice
Renville
Pine
Nicollet
Morrison
Mille Lacs
Meeker
McLeod
Le Sueur
Isanti
Hennepin
Dakota
Chisago
Carver
Benton
Anoka
Recipient
Tetra Tech Inc
2019 Fiscal Year Funding Amount
$89,477
Fund Source

The goal of this project is to extend existing Hydrologic Simulation Program FORTRAN (HSPF) models through 2017 for the following major watersheds: Redwood, Cottonwood, Watonwan, Blue Earth, Le Sueur, Pomme de Terre, Minnesota River-Headwaters, and Lac Qui Parle watersheds.

Big Stone
Blue Earth
Brown
Chippewa
Cottonwood
Douglas
Faribault
Freeborn
Grant
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
Murray
Otter Tail
Pipestone
Pope
Redwood
Renville
Stevens
Swift
Traverse
Waseca
Watonwan
Yellow Medicine
Recipient
Minnesota Pollution Control Agency
2010 Fiscal Year Funding Amount
$4,432,804
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities.

Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support.

Anoka
Becker
Beltrami
Big Stone
Carver
Cass
Chippewa
Clearwater
Crow Wing
Dakota
Grant
Hennepin
Hubbard
Itasca
Kandiyohi
Koochiching
Lac qui Parle
Lincoln
Lyon
Morrison
Olmsted
Otter Tail
Ramsey
Redwood
Renville
Sherburne
Stevens
Todd
Traverse
Wabasha
Wadena
Washington
Wilkin
Wright
Yellow Medicine
Recipient
Minnesota Pollution Control Agency
2014 Fiscal Year Funding Amount
$297,169
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Pollution Control Agency
2015 Fiscal Year Funding Amount
$287,628
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Pollution Control Agency
2012 Fiscal Year Funding Amount
$5,500,000
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities within the described priority watersheds.

Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support.

Aitkin
Beltrami
Carver
Cass
Clearwater
Crow Wing
Dodge
Goodhue
Hennepin
Hubbard
Kandiyohi
Lake of the Woods
Marshall
McLeod
Meeker
Mower
Olmsted
Pennington
Polk
Red Lake
Renville
Rice
Roseau
Sibley
Steele
Wabasha
Wright
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$109,928
Fund Source

The goal of this project is to refine the nutrient and algae simulation in the Minnesota River basin using all relevant available sources of information. The outcome of this work order is a revised Hydrological Simulation Program – FORTRAN (HSPF) watershed model application for the Minnesota River basin that correctly represents nutrient sources and algae.

Big Stone
Blue Earth
Brown
Carver
Chippewa
Cottonwood
Dakota
Douglas
Faribault
Freeborn
Grant
Hennepin
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
McLeod
Murray
Nicollet
Otter Tail
Pipestone
Pope
Redwood
Renville
Rice
Scott
Sibley
Stevens
Swift
Traverse
Waseca
Watonwan
Yellow Medicine
Recipient
Otter Tail, East SWCD
2014 Fiscal Year Funding Amount
$150,000
Fund Source

The Otter Tail County Community Partners Grant Project will enable community groups to go beyond planning and take action to protect their water resources. This grant program will provide targeted community groups with the means to make positive improvements now and identify high priority projects for future opportunities. Engaging community members in the identification of water protection opportunities with the data in recently completed lake assessment reports will help build connections and foster a stewardship ethic.

Otter Tail
Recipient
Otter Tail, West SWCD
2015 Fiscal Year Funding Amount
$290,616
Fund Source

This Initiative is a nine-year plan to take a systematic approach to inventory and analyze all Public Waters within the County. Phase 1 includes identifying areas of concern through GIS analysis of current landuse along Public Waters, and the development of a database of non-compliant landowners which will be updated and maintained. Once landowners have been identified they will receive a joint letter and map stating that they may not be in compliance.

Otter Tail
Recipient
Otter Tail, East SWCD
2017 Fiscal Year Funding Amount
$16,225
Fund Source

The Otter Tail Water Management District (OTWMD) manages the wastewater for nearly 1,750 private residences near Otter Tail Lake, Deer Lake, and Lake Blanche. There OTWMD is responsible for 101 monitoring wells that were installed in 1984 and 1985 that are no longer being used and need to be properly sealed. The goal of this project is for the East Otter Tail Soil and Water Conservation District (EOTSWCD) to assist the OTWMD in properly sealing 100% of the monitoring wells that are located within the Otter Tail Surficial Aquifer.

Otter Tail
Recipient
Otter Tail, East SWCD
2017 Fiscal Year Funding Amount
$471,000
Fund Source

The purpose of this project is to develop a detailed tool that can be used in all watersheds within the Otter Tail and Becker counties to prioritize, target, and measure implementation practices at the field scale. The PTM App will significantly increase the targeting capabilities in Otter Tail and Becker Counties. The Watershed Restoration and Protection Strategy has not been completed for Otter Tail County, yet, and the PTM App will be able to assist targeting and prioritizing when those documents are created.

Becker
Otter Tail
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$75,000
Fund Source

The goal of this project is to complete the construction, calibration, and validation of a Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Otter Tail River watershed. The contractor will produce an HSPF model that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) Studies. The model will generate predicted output for hydrology, sediment, nutrients, and dissolved oxygen that is consistent with observed data.

Becker
Clay
Clearwater
Mahnomen
Otter Tail
Wilkin
Recipient
East Otter Tail SWCD
2017 Fiscal Year Funding Amount
$52,556
Fund Source

This project will determine the condition of the water bodies in the Otter Tail River watershed, initiate public participation in the Watershed Restoration and Protection Strategy (WRAPS) development process, begin identification of potential stressors and priority management areas within the watershed, and begin development of initial drafts of the Total Maximum Daily Load (TMDL) study and WRAPS report.

Becker
Clearwater
Otter Tail
Wilkin
Recipient
East Otter Tail SWCD
2019 Fiscal Year Funding Amount
$164,879
Fund Source

The goals of project are to: 1) engage stakeholders and the public in watershed management activities; 2) conduct microbial source tracking to determine the source(s) of E.

Becker
Clay
Clearwater
Mahnomen
Otter Tail
Wilkin
Recipient
University of Minnesota: Sponsored Projects Administration
2015 Fiscal Year Funding Amount
$80,322
Fund Source

This project will be the first of its kind Civic Engagement Cohort that focusses its efforts in an individual watershed. The Otter Tail River Watershed is scheduled to start a Watershed Restoration and Protection Strategy (WRAPS) in 2016 and as a component of that project, the cohort will provide the civic engagement requirement. The cohort will be comprised of 25-30 individuals located throughout the watershed who represent a broad spectrum of resource managers and citizens who are familiar with water quality and watershed management.

Becker
Clay
Clearwater
Mahnomen
Otter Tail
Wilkin
Recipient
Tetra Tech
2016 Fiscal Year Funding Amount
$80,000
Fund Source

The goal of this project is to construct, calibrate, and validate a Hydrologic Simulation Program FORTRAN (HSPF) watershed model for the Otter Tail watershed. The contractor will produce a HSPF watershed model application(s) that can readily be used to provide information to support conventional parameter Total Maximum Daily Loads (TMDLs). The contractor will clearly demonstrate that this model generates predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen that are consistent with available sets of observed data.

Becker
Clay
Clearwater
Mahnomen
Otter Tail
Wilkin
Recipient
Pomme de Terre River Association
2019 Fiscal Year Funding Amount
$18,302
Fund Source

The goal is to facilitate strategic networking, learning, and participation of targeted groups to assess, build, and leverage community capacity (i.e. community resources and values) to become aware of water quality issues and increase best management practice adoption to restore and protect water quality in the Pomme de Terre River watershed.  This goal will benefit the completion of the second cycle of the watershed approach by providing useful information important in the completion of Watershed Restoration and Protection Strategies (WRAPS) report.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Emmons & Olivier Resources, Inc.
2019 Fiscal Year Funding Amount
$38,292
Fund Source

This project will develop the Pomme de Terre Watershed Total Maximum Daily Load (TMDL) study for the second round of the 10-year watershed approach cycle in the Pomme de Terre watershed. This phase of the project will address 4 stream impairments and 3 lake impairments and produce a draft TMDL document. A second phase may be needed as the stressor ID report identifies more stream reaches with TMDL relevant stressors.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Stevens Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$132,120
Fund Source

Certain stretches of the Pomme de Terre River have been identified as impaired. This project will quantify the reductions in pollutant loading that would be necessary to bring water quality in the impaired stretches to an acceptable level. It will also identify strategies that would improve water quality in these impaired stretches. Some funds will support public input activities into the Pomme de Terre River watershed management plan.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Pomme de Terre River Association JPB
2014 Fiscal Year Funding Amount
$274,816
Fund Source

The goal of the Pomme de Terre River Association (JPB) is to improve local water resources within the watershed through targeted voluntary efforts and build strong relationships with local landowners, producers, and citizens. Utilizing the State's first Watershed Restoration and Protection Strategy, the JPB has targeted and identified specific areas and activities required for marked water quality improvement.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Pomme de Terre River Association JPB
2016 Fiscal Year Funding Amount
$115,248
Fund Source

The goal of the Pomme de Terre River Association (PDTRA JPB) is to improve the local water resources within the watershed through targeted voluntary efforts and the building of strong relationships with local landowners, producers, and citizens. To further our efforts in strategically working to achieve our reduction goals, listed in our Major Watershed Restoration and Protection Strategies Report and Turbidity Total Maximum Daily Load report, we would like to further define our Priority Management Zones through the development of a hydrological conditioned Digital Elevation Model.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Pomme de Tere River Association
2017 Fiscal Year Funding Amount
$46,133
Fund Source

The Pomme de Terre River Association will partner with the Minnesota Pollution Control Agency to conduct water quality monitoring in the Pomme de Terre River Watershed. The purpose will be to determine if waters meet the states non-point source pollution standards. The data collected will be utilized to produce the cycle two Watershed Restoration and Protection Strategy (WRAPS) report and supporting documents for the watershed. Through the utilization of this funding a total of 11 lakes and 7 stream reaches will be assessed.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Pomme de Terre River Association Joint Powers Board
2011 Fiscal Year Funding Amount
$257,610
Fund Source

The Pomme de Terre River watershed is located in west central Minnesota and occupies a portion of six counties. For many years surface water quality within the watershed has been a concern to local government, and in 1982 the Counties and SWCDs within the watershed area formed the Pomme de Terre River Association Joint Powers Board to begin addressing this issue. In 2002 the Pomme de Terre River was placed on the Impaired Waters list for turbidity.The project partners are collaborating to improve surface water quality within the watershed with a grant from the Clean Water Fund.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Pomme de Terre River Association
2017 Fiscal Year Funding Amount
$52,000
Fund Source

This project will establish a framework with the Pomme de Terre River Association (PDTRA), county staff, Soil and Water Conservation District staff, and state agencies that will outline their involvement throughout the development of the Watershed Restoration and Protection Strategy (WRAPS) for the Pomme de Terre River watershed. This work will form the basis to establish restoration and protection strategies that local governments and watershed organizations can use to make decisions that will lead to protecting and restoring the waters in the watershed.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
RESPEC
2017 Fiscal Year Funding Amount
$19,996
Fund Source

The goal of this project is to extend through 2016, calibrate, and validate the existing watershed model using Hydrological Simulation Program FORTRAN (HSPF) for the Pomme de Terre River Watershed. The contractor will produce an HSPF model that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) studies.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Red River Watershed Mgmt Board
2014 Fiscal Year Funding Amount
$235,250
Fund Source

The Prioritization, Targeting, and Measuring Water Quality Improvement Application (PTMA) connects the general qualitative strategies in a Total Maximum Daily Load (TMDL) and Watershed Restoration and Protection (WRAP) and the identification of implementable on-the-ground Best Management Practices (BMPs). Leveraging geospatial data from the International Water Institute this application will be developed for two pilot areas within the Red River Basin.

Becker
Cass
Clay
Grant
Mahnomen
Norman
Otter Tail
Traverse
Recipient
Buffalo-Red River WD
2017 Fiscal Year Funding Amount
$168,000
Fund Source

This project will result in the development of three critical pieces of information. They include: 1. Development of restoration and protection strategies for all waterbodies in the district relative to the State's Non-point Source Funding plan 2. Use of PTMApp to tie the WRAPs implementation tables from the Buffalo and Red River Watersheds to targeted on-the-ground projects and practices that will provide measurable water quality improvements, and 3.

Becker
Clay
Otter Tail
Wilkin