Minnesota's Legacy

All Projects

Showing 1 - 40 of 54 | Export projects
Recipient
Freeborn County
2015 Fiscal Year Funding Amount
$494,500
Fund Source

The City of Myrtle is an unsewered community in Freeborn County. Thirty-one of thirty-two properties are connected to a community straight pipe, which discharges raw sewage into Deer Creek, a tributary of the Cedar River and are classified as an imminent threat to public health (ITPHS). This project will provide cost-share assistance to 28 low income property owners, who are connected to the City of Myrtle community straight pipe, for construction of individual subsurface sewage treatment systems.

Freeborn
Recipient
Faribault County SWCD
2015 Fiscal Year Funding Amount
$110,000
Fund Source

The Faribault Soil and Water Conservation District will provide mini-grants to conservation-conscious community organizations who voluntarily construct best management practices that provide storage and treatment of stormwater runoff at its source.

Faribault
Recipient
Freeborn SWCD
2016 Fiscal Year Funding Amount
$32,500
Fund Source

County Ditch #8 (CD8) has been identified as an area of high erosion by the Freeborn County Drainage Authority and the Turtle Creek Watershed district. Project entails using conservation BMPs such as water and sediment control basins, grassed waterways, and alternative tile intakes to address gully and sheet and rill erosion concerns at the headwaters of CD8.

Freeborn
Recipient
Farmers, Rural Landowners, and Agricultural Supply Businesses
2019 Fiscal Year Funding Amount
$75,000
2018 Fiscal Year Funding Amount
$75,000
2017 Fiscal Year Funding Amount
$75,000
2016 Fiscal Year Funding Amount
$75,000
2015 Fiscal Year Funding Amount
$200,000
2014 Fiscal Year Funding Amount
$200,000
2013 Fiscal Year Funding Amount
$4,500,000
2012 Fiscal Year Funding Amount
$4,500,000
2011 Fiscal Year Funding Amount
$2,500,000
2010 Fiscal Year Funding Amount
$2,000,000
Fund Source

The AgBMP Loan Program provides needed funding for local implementation of clean water practices at an extremely low cost, is unique in its structure and is not duplicated by any other source of funding.The AgBMP loan program provides 3% loans through local lenders to farmers, rural landowners, and agriculture supply businesses.

Anoka
Becker
Blue Earth
Brown
Carver
Cook
Cottonwood
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Houston
Hubbard
Jackson
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
Morrison
Mower
Murray
Nicollet
Olmsted
Pipestone
Pope
Redwood
Renville
Rice
Rock
Scott
Sherburne
Sibley
St. Louis
Stearns
Steele
Stevens
Todd
Traverse
Wabasha
Waseca
Washington
Watonwan
Winona
Yellow Medicine
Recipient
Peer Engineering
2014 Fiscal Year Funding Amount
$115,910
Fund Source

Peer Engineering, Inc. (Peer) will evaluate and recommend to MPCA groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration. Superfund staff will assist in the project by providing oversight of contractual requirements and provide technical assistance as needed.

Dakota
Hennepin
Mower
Rice
Washington
Recipient
Crow Wing SWCD
2016 Fiscal Year Funding Amount
$310,000
Fund Source

The Crow Wing Soil and Water Conservation District (SWCD) proposes to complete stormwater best management practices (BMPs) that will reduce 40 pounds of phosphorus and 40 tons of sediment per year from entering Big Trout Lake. The Crow Wing County (CWC) Water Plan identifies Big Trout Lake as a priority lake to enhance due to its significant decline in water clarity and high ratio of impervious surface surrounding the lake. The 2015 CWC Assessors Property Tax Assessment reports that Big Trout has the second highest taxable land value in CWC at $4,200 per foot of shoreline.

Crow Wing
Recipient
Crow Wing SWCD
2014 Fiscal Year Funding Amount
$150,000
Fund Source

The Crow Wing Soil and Water Conservation District (SWCD) will engage citizen and nonprofit groups to enhance, improve, and protect Crow Wing County (CWC) lakes and rivers. To do this, the SWCD will partner with the University of Minnesota Extension, MN DNR, CWC, nonprofits, and lake associations to implement a mini grant program and provide grant funds to 20 community groups.

Crow Wing
Recipient
Crow Wing SWCD
2015 Fiscal Year Funding Amount
$150,000
Fund Source

The Crow Wing Soil and Water Conservation District (SWCD) will partner with citizen groups and nonprofit groups to complete projects to reduce stormwater runoff and retain water on the land in Crow Wing County's (CWC) 125 minor watersheds. The SWCD will implement a mini grant program and provide competitive grant funds to an anticipated 12 groups. This project will also address CWC Water Plan priorities one, two, and six, which involve stormwater management and sediment control, shoreline buffers, and agriculture best management practices.

Crow Wing
Recipient
Crow Wing SWCD
2017 Fiscal Year Funding Amount
$150,000
Fund Source

The Crow Wing Soil and Water Conservation District (SWCD) proposes to partner with citizen groups and nonprofit groups to complete projects that will reduce polluted runoff and keep water on the land in Crow Wing County's (CWC) 125 minor watersheds. To do this, the SWCD will implement a mini grant program and provide competitive grant funds to an anticipated 12 groups. Citizens groups will use their innovation and creativity to apply for project funds through the SWCD.

Crow Wing
Recipient
Cass County (Environmental Services Department)
2012 Fiscal Year Funding Amount
$82,696
Fund Source

This project will include lake and stream monitoring on 23 lakes and 4 streams found within the Leech Lake River and Pine River watersheds in Cass County. The project will be conducted in an effort to gain sufficient data on these data-deficient lake and stream sites within these watersheds. All of the proposed monitoring sites are target sites located in the targeted watersheds for 2012. Cass ESD is partnering with Hubbard SWCD, the Leech Lake Band of Objibwe, and RMB Environmental Laboratories to conduct the fieldwork for this project.

Aitkin
Beltrami
Cass
Crow Wing
Hubbard
Recipient
Cedar River WD
2016 Fiscal Year Funding Amount
$598,000
Fund Source

The Cedar River Watershed District was established in 2007 to identify and fix the water quality impairments in the Cedar River. After several years of monitoring and modeling, the district has developed the requisite background data to drill down on the 25 most crucial areas for targeted treatment. In 2015, a Capitol Improvement Plan was developed to prioritize and rank the most critical projects within the priority list. The District is requesting Clean Water Funding to implement the highest ranking projects, which are shovel ready for timely construction.

Mower
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$40,000
Fund Source
There are two main goals of this Cedar Basin HSPF project, A. Overall development of the HSPF model in the Cedar Basin of Minnesota; and B. Shell Rock River nutrient, DO , impairment modeling and TMDL completion.
Dodge
Freeborn
Mower
Steele
Recipient
Emmons & Olivier Resources Inc
2017 Fiscal Year Funding Amount
$34,959
Fund Source

This project will guide local implementation planning efforts by identifying water quality goals, strategies, and implementation milestones in the Cedar River Watershed. This watershed includes 435 square miles in major portions of Mower, Freeborn and Dodge Counties, and incudes the regional center of Austin. A Watershed Restoration and Protection Strategy (WRAPS) report will be completed by this effort.

Dodge
Freeborn
Mower
Recipient
Mower County Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$99,929
Fund Source

This project will place the Cedar River watershed on a sustainable and clearly understood implementation process for comprehensive water management. All people living in the watershed and all groups operating and managing land in the watershed, are responsible stakeholders in the effort. Objectives for this phase of the project include:
1. Develop a comprehensive watershed restoration and protection strategy.
2. Continue development of a more coordinated and comprehensive citizen participation process.

Dodge
Freeborn
Mower
Steele
Recipient
Barr Engineering Co
2017 Fiscal Year Funding Amount
$48,510
Fund Source

This project is for the Cedar River Watershed, which includes major portions of Mower, Freeborn and Dodge Counties in southern Minnesota. The scope of this project is to complete the Total Maximum Daily Load (TMDL) studies for 11 stream reaches with sediment impairments, and 14 stream reaches for bacteria impairments. The major product of this effort will be the final Cedar River TMDL report, which will be submitted to the United States Environmental Protection Agency, and public-noticed by the Minnesota Pollution Control Agency.

Dodge
Freeborn
Mower
Recipient
Crow Wing County
2016 Fiscal Year Funding Amount
$31,000
Fund Source

Crow Wing County, in cooperation with the municipalities within the County, plans to continue its successful well sealing program that pays 50% of the cost to seal unused/abandoned wells up to a maximum of $1000 per well. The amount of funding requested is $31,000 which is estimated to allow for the sealing of 80-100 wells. From 2012 to 2015, Crow Wing County sealed 65 wells as part of an earlier MDH well sealing grant from the Clean Water Fund. Priority will be given to wells located in or near existing wellhead protection areas.

Crow Wing
Recipient
Tetra Tech
2017 Fiscal Year Funding Amount
$80,038
Fund Source

This project will conduct a 2017 revision of the South Fork Crow River, North Fork Crow River and Sauk River Watershed Hydrological Simulation Program FORTRAN (HSPF) models and review of the Pine River Watershed HSPF model.

Aitkin
Carver
Cass
Crow Wing
Douglas
Hennepin
Hubbard
Kandiyohi
McLeod
Meeker
Pope
Renville
Sibley
Stearns
Todd
Wright
Recipient
Crow Wing Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$50,315
Fund Source

This project will include lake and stream monitoring on 7 lakes and 3 streams found within the Pine River watershed. The project will be conducted in an effort to gain sufficient data on these data-deficient lake and stream sites within these watersheds. All of the proposed monitoring sites are target sites for 2012. One of the goals in the Crow Wing County (CWC) Local Comprehensive Water Plan (CWP) is to establish a countywide Comprehensive Monitoring Plan (CMP).

Aitkin
Cass
Crow Wing
Hubbard
Recipient
Crow Wing Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$45,964
Fund Source

This project will collect a complete Trophic Site Index (TSI) data set for Crow Wing County lakes and a complete data set for streams and rivers for the Intensive Monitoring Program (IMP). Crow Wing County, Cass County, Wadena County, Morrison County and Hubbard County are partnering to ensure that all target lakes and rivers within the Crow Wing River watershed are monitored efficiently.

Aitkin
Becker
Cass
Clearwater
Crow Wing
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
Turtle Creek WD
2014 Fiscal Year Funding Amount
$35,625
Fund Source

In the battle to make real progress in sediment reduction to Turtle Creek, buffer strips are on the defensive front lines, holding the land at its most critical point. Grass strips along waterways have long provided a catchment area for agricultural field runoff. The Conservation Reserve Program (CRP) has developed guidance and performance standards that utilize the maximum amount of benefit when installed through that program. In recent years, the Turtle Creek Watershed residents have faced a difficult decision over whether or not to incorporate grass buffers on their farms.

Freeborn
Recipient
Mower County Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$182,020
Fund Source

This project will build upon existing planning and implementation efforts already taken on in the project area. The collection of existing information will be used to complement water information in support of a more successful and sustainable water quality improvement and protection implementation program. This will be achieved by active civic engagement activities throughout Phase I of this project.

Dodge
Freeborn
Mower
Steele
Recipient
Cass County Environmental Services Department
2013 Fiscal Year Funding Amount
$30,000
Fund Source

This project will provide an important framework for civic and citizen engagement and communication, which will contribute to long-term public participation in surface water protection and restoration activities throughout the Pine River watershed. The civic engagement plans will be incorporated into the long term plans for the major watershed project.

Aitkin
Cass
Crow Wing
Hubbard
Recipient
Cedar River Watershed District
2011 Fiscal Year Funding Amount
$163,596
Fund Source

In the summer of 2011, conservation practices were installed in the upper reaches of Dobbins Creek to stabilize eroding stream banks. We contracted with the non-profit Minnesota Conservation Corps to assist with the labor. The crew worked efficiently, the weather cooperated perfectly, and the project came together exactly as planned. The banks of Dobbins Creek were armored with native cedar trees and anchored to the banks. Once the project was complete, we cut the side slopes back to reduce future erosion in the newly protected banks.

Recipient
Dodge SWCD
2016 Fiscal Year Funding Amount
$50,625
Fund Source

Nitrogen is a serious problem in Minnesota's Mississippi River Basin and the Dodge Soil and Water Conservation District (SWCD) will address this problem through saturated buffers. Nitrates have been linked to adverse health effects, and nitrogen is the leading cause of the dead zone in the Gulf of Mexico. Agriculture drainage through the use of tile drainage systems have been identified as the number one leading source of nitrogen in the Mississippi River Basin.

Dodge
Recipient
Minnesota Department of Health
2019 Fiscal Year Funding Amount
$1,100,000
2018 Fiscal Year Funding Amount
$1,100,000
2017 Fiscal Year Funding Amount
$1,100,000
2016 Fiscal Year Funding Amount
$1,100,000
2015 Fiscal Year Funding Amount
$1,150,000
2014 Fiscal Year Funding Amount
$1,150,000
2013 Fiscal Year Funding Amount
$1,020,000
2012 Fiscal Year Funding Amount
$1,020,000
2011 Fiscal Year Funding Amount
$744,717
2010 Fiscal Year Funding Amount
$250,291
Fund Source

The Drinking Water Contaminants of Emerging Concern (CEC) program identifies environmental contaminants for which current health-based standards currently do not exist or need to be updated, investigate the potential for human exposure to these chemicals, and develop guidance values for drinking water. Contaminants evaluated by CEC staff include contaminants that have been released or detected in Minnesota waters (surface water and groundwater) or that have the potential to migrate to or be detected in Minnesota waters.

Statewide
Recipient
Crow Wing Soil and Water Conservation District
2014 Fiscal Year Funding Amount
$20,442
Fund Source

This leadership workshop series will provide the participants (citizen leaders) with knowledge, skills, processes and tools that can help to strengthen their current efforts and nurture new ones.

Aitkin
Becker
Beltrami
Cass
Clearwater
Crow Wing
Douglas
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$396,300
Fund Source

The goal of this project is to continue and finalize HSPF watershed model construction and complete the calibration/validation process.

Aitkin
Anoka
Becker
Beltrami
Benton
Carlton
Cass
Clearwater
Crow Wing
Hubbard
Isanti
Itasca
Kanabec
Meeker
Mille Lacs
Morrison
Sherburne
St. Louis
Stearns
Todd
Wright
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$174,954
Fund Source

This project will construct, calibrate, and validate three HSPF watershed models. The consultant will produce HSPF models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will clearly demonstrate that these models generate predicted output time series for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.

Becker
Hubbard
Crow Wing
Aitkin
Clearwater
Cass
Itasca
Beltrami
Recipient
Cass SWCD
2014 Fiscal Year Funding Amount
$60,000
Fund Source

The north-central Minnesota counties of Cass and Hubbard share large portions of the Crow Wing River, Leech and Upper Mississippi Watersheds, all of which play an important role in providing clean drinking water to over one million Minnesota residents. Each county assumes the responsibility of inspecting and evaluating the judicial and county ditch systems that drain directly into these watersheds. The two counties together share two judicial ditch systems and combined have an additional 42 ditches within their borders.

Cass
Hubbard
Recipient
Douglas SWCD
2014 Fiscal Year Funding Amount
$36,000
Fund Source

As lake-focused development continues these high quality waters will see increasing amounts of land use change. The State Demographer projects that the targeted lake catchments will see population increases of 25-62% within 20 years. Isolating these contributing areas permits the Lake Protection Analysis project to perform multiple GIS analyses to accurately inform water quality discussions. The final framework will allow local water managers to prioritize across their water bodies, target activities to specific subsheds, and develop measurable goals.

Crow Wing
Douglas
Recipient
Crow Wing County
2015 Fiscal Year Funding Amount
$67,300
Fund Source

This project is a cooperative effort between Crow Wing and Itasca County to contract with RMB Laboratories to generate 65 lake assessment/trend analysis reports. The watershed protection model is an innovative and proactive approach to water resource management which is geared towards prioritizing areas of concern, targeting implementation strategies, and measuring their effectiveness. These assessments are also useful and understandable tools for lake associations and the public.

Crow Wing
Itasca
Recipient
Ag Resource Strategies, LLC
2010 Fiscal Year Funding Amount
$300,000
Fund Source

LEQA is a Minnesota Department of Agriculture (MDA) program to help livestock producers address, using a non-regulatory approach, the unique water quality issues on their farms. The MDA has contracted with Ag Resource Strategies, LLC, to recruit farmers to enroll in the LEQA program. The company trains technicians to assess different areas of each farms, such as the farmstead, livestock facilities, fields and wooded areas. The technicians then develop an environmental assessment and identify financial assistance for these projects.

Recipient
Mower SWCD
2014 Fiscal Year Funding Amount
$30,000
Fund Source

Ninety percent of the land in Mower County is used for agriculture. The County ranks 10th and 13th in the State for corn and bean production, making much of the land vulnerable to erosion due to the planting of row crop. As a result, streams and ditches in the county see high sediment loads.

Mower
Recipient
Minnesota Pollution Control Agency
2014 Fiscal Year Funding Amount
$297,169
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Pollution Control Agency
2015 Fiscal Year Funding Amount
$287,628
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Pollution Control Agency
2012 Fiscal Year Funding Amount
$5,500,000
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities within the described priority watersheds.

Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support.

Aitkin
Beltrami
Carver
Cass
Clearwater
Crow Wing
Dodge
Goodhue
Hennepin
Hubbard
Kandiyohi
Lake of the Woods
Marshall
McLeod
Meeker
Mower
Olmsted
Pennington
Polk
Red Lake
Renville
Rice
Roseau
Sibley
Steele
Wabasha
Wright
Recipient
Greater Blue Earth River Basin Alliance
2017 Fiscal Year Funding Amount
$301,200
Fund Source

The Greater Blue Earth River Basin Alliance (GBERBA) along with Soil and Water Conservation Districts, Counties, landowners, and drainage authorities in the ten member counties will install conservation drainage practices to improve water quality. 103E drainage systems with documented sediment or water quality issues are the focus with the goal of installing 52 practices such as improved side inlets (grade stabilization structures), alternative tile inlets, denitrifying bioreactors, saturated buffers, storage wetlands and others.

Blue Earth
Brown
Cottonwood
Faribault
Freeborn
Jackson
Le Sueur
Martin
Waseca
Watonwan
Recipient
Emmons & Olivier Resources Inc
2017 Fiscal Year Funding Amount
$3,459
Fund Source

This project is a continuation of a Total Maximum Daily Load (TMDL) study that addresses lake eutrophication (phosphorus) in two lakes that are on the 2014 United States Environmental Protection Agency 303(d) list of impaired waters, located in the Pine River Watershed. The contractor will be responding to public comment on the Pine River TMDL.

Aitkin
Cass
Crow Wing
Hubbard
Recipient
Emmons & Olivier Resources Inc
2017 Fiscal Year Funding Amount
$2,427
Fund Source

The purpose of this project is to address Environmental Protection Agency (EPA) comments on the pre-public notice draft Total Maximum Daily Load (TMDL) report that were received by Minnesota Pollution Control Agency (MPCA) in January 2016.

Cass
Crow Wing
Recipient
Crow Wing County Soil & Water Conservation District (SWCD)
2013 Fiscal Year Funding Amount
$69,999
Fund Source

Phase II of this project will focus on source assessment, running watershed scenarios, Kego Lake TMDL, lake protection planning, Stressor identification and the continuation of the Civic Engagement components of the project. Information gathered in Phase II will be utilized in developing the WRAP report which will be developed in the future Phase III of the project.

Aitkin
Cass
Crow Wing
Hubbard