Recipient
RESPEC
2013 Fiscal Year Funding Amount
$49,986
Fund Source

The goal of this project is to continue and finalize Hydrologic Simulation Program FORTRAN (HSPF) watershed model construction and complete the calibration/validation process. The project will add representation of point source discharges to the model, compile flow and water quality data for the purposes of calibration and validation. The end result will be an HSPF watershed model that can readily be used to provide information to support conventional parameter TMDLs.

Mahnomen
Norman
Polk
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$70,000
Fund Source

This project will complete spatial and temporal revisions , recalibration and validation of 7 watershed HSPF models. These fully functioning calibrated validated executable models will simulate hydrology, sediment (sand, silt, and clay), temperature, phosphorus, nitrogen, dissolved oxygen, biochemical oxygen demand, and algae at the 12-digit HUC subbasin scale (or finer).

Blue Earth
Brown
Carver
Cottonwood
Dakota
Faribault
Freeborn
Jackson
Le Sueur
Lincoln
Lyon
Martin
McLeod
Murray
Nicollet
Pipestone
Ramsey
Redwood
Renville
Rice
Scott
Sibley
Steele
Waseca
Watonwan
Yellow Medicine
Recipient
LimnoTech
2013 Fiscal Year Funding Amount
$121,916
Fund Source

This project will construct, calibrate, and validate an HSPF watershed model for the Zumbro River watershed. The consultant will produce HSPF watershed models that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDLs). The consultant will clearly demonstrate that the models generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen that are consistent with available sets of observed data.

Dodge
Goodhue
Mower
Olmsted
Rice
Steele
Wabasha
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$99,986
Fund Source

This project will finalize HSPF watershed model construction and complete the calibration/validation process. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval.

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
Aqua Terra Consultants
2013 Fiscal Year Funding Amount
$36,848
Fund Source

This project will maximize the utility and usefulness of three HSPF models that have been constructed and calibrated for hydrology. The contractor will identify and reduce parameterization errors in the following three HSPF models: 1) Buffalo River Watershed, 2 ) Thief River Watershed, 3) Bois de Sioux-Mustinka Watersheds. This will result, not only in a better hydrology calibration, but will also improve each of the models’ ability to more accurately estimate sediment and pollutant loads and concentrations.

Becker
Beltrami
Big Stone
Clay
Grant
Marshall
Otter Tail
Pennington
Roseau
Stevens
Traverse
Wilkin
Recipient
LimnoTech
2013 Fiscal Year Funding Amount
$59,116
Fund Source

The MPCA has selected the Soil and Water Assessment Tool (SWAT) watershed model to simulate watershed hydrology and water quality to assess various restoration scenarios in the Little Cannon River watershed. The SWAT model is an important tool in developing an understanding of existing conditions and simulating conditions under various management scenarios to inform the development of implementation strategies and plans to restore and protect streams and lakes.

Blue Earth
Dakota
Dodge
Freeborn
Goodhue
Le Sueur
Rice
Scott
Steele
Waseca
Recipient
Emmons & Olivier Resources
2013 Fiscal Year Funding Amount
$69,994
Fund Source

This project will finalize the Hydrologic Simulation Program FORTRAN (HSPF) watershed model construction and complete the calibration/validation process. The consultant will produce an HSPF watershed model that can readily be used to provide information to support conventional parameter TMDLs. The consultant will clearly demonstrate that this model generates predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.

Big Stone
Grant
Otter Tail
Stevens
Traverse
Wilkin
Recipient
Emmons & Olivier Resources, Inc.
2013 Fiscal Year Funding Amount
$2,034
Fund Source

The goal of this project is to respond to public comments on the Pope County Eight Lakes TMDL and make appropriate changes where necessary.

Chippewa
Douglas
Grant
Kandiyohi
Otter Tail
Pope
Stearns
Stevens
Swift
Recipient
Multiple public water systems
2013 Fiscal Year Funding Amount
$250,000
2015 Fiscal Year Funding Amount
$250,000
2016 Fiscal Year Funding Amount
$113,000
2018 Fiscal Year Funding Amount
$250,000
Fund Source

Approximately 70 percent of all Minnesotans rely on groundwater as their primary source of drinking water. Wells used for drinking water must be properly sealed when removed from service to protect both public health and Minnesota’s invaluable groundwater resources. The Minnesota Department of Health protects both public health and groundwater by assuring the proper sealing of unused wells.
Clean Water funds are being provided to well owners as a 50% cost-share assistance for sealing unused public water-supply wells.

Anoka
Beltrami
Benton
Big Stone
Blue Earth
Cook
Crow Wing
Dakota
Dodge
Faribault
Fillmore
Hennepin
Lyon
McLeod
Morrison
Mower
Olmsted
Rice
Sherburne
Sibley
St. Louis
Stearns
Steele
Swift
Todd
Waseca
Washington
Watonwan
Winona
Wright