Minnesota's Legacy

All Projects

Showing 1 - 20 of 20 | Export projects
Recipient
RESPEC
2012 Fiscal Year Funding Amount
$67,972
Fund Source

This project will construct three watershed framework models built using the Hydrologic Simulation Program FORTRAN. These executable models will simulate hydrology at the 12-digit HUC subbasin scale. An HSPF model will be built for each of the following 8-HUC watersheds: Red Lake River (09020303) and the Clearwater River (09020305).

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
LimnoTech
2013 Fiscal Year Funding Amount
$121,916
Fund Source

This project will construct, calibrate, and validate an HSPF watershed model for the Zumbro River watershed. The consultant will produce HSPF watershed models that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDLs). The consultant will clearly demonstrate that the models generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen that are consistent with available sets of observed data.

Dodge
Goodhue
Mower
Olmsted
Rice
Steele
Wabasha
Recipient
University of Minnesota
2012 Fiscal Year Funding Amount
$175,000
2013 Fiscal Year Funding Amount
$175,000

PROJECT OVERVIEW

Aitkin
Becker
Beltrami
Benton
Carlton
Cass
Clearwater
Cook
Crow Wing
Hubbard
Itasca
Koochiching
Lake
Lake of the Woods
Mahnomen
Marshall
Morrison
Otter Tail
Pennington
Pine
Polk
Red Lake
Roseau
St. Louis
Todd
Wadena
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$99,986
Fund Source

This project will finalize HSPF watershed model construction and complete the calibration/validation process. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval.

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
Aqua Terra Consultants
2013 Fiscal Year Funding Amount
$36,848
Fund Source

This project will maximize the utility and usefulness of three HSPF models that have been constructed and calibrated for hydrology. The contractor will identify and reduce parameterization errors in the following three HSPF models: 1) Buffalo River Watershed, 2 ) Thief River Watershed, 3) Bois de Sioux-Mustinka Watersheds. This will result, not only in a better hydrology calibration, but will also improve each of the models’ ability to more accurately estimate sediment and pollutant loads and concentrations.

Becker
Beltrami
Big Stone
Clay
Grant
Marshall
Otter Tail
Pennington
Roseau
Stevens
Traverse
Wilkin
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$396,300
Fund Source

The goal of this project is to continue and finalize HSPF watershed model construction and complete the calibration/validation process.

Aitkin
Anoka
Becker
Beltrami
Benton
Carlton
Cass
Clearwater
Crow Wing
Hubbard
Isanti
Itasca
Kanabec
Meeker
Mille Lacs
Morrison
Sherburne
St. Louis
Stearns
Todd
Wright
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$95,000
Fund Source
The goal of this project is to continue and finalize HSPF watershed model construction and complete the calibration/validation process.
Beltrami
Clearwater
Marshall
Pennington
Polk
Red Lake
Recipient
Houston Engineering
2012 Fiscal Year Funding Amount
$67,996
Fund Source

This project will continue to develop, and calibrate/validate the hydrology of an HSPF watershed model for the Thief River watershed. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval. The consultant will produce an HSPF watershed model that can readily be used to provide information to support conventional parameter TMDLs.

Beltrami
Marshall
Pennington
Roseau
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$174,954
Fund Source

This project will construct, calibrate, and validate three HSPF watershed models. The consultant will produce HSPF models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will clearly demonstrate that these models generate predicted output time series for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.

Becker
Hubbard
Crow Wing
Aitkin
Clearwater
Cass
Itasca
Beltrami
Recipient
LimnoTech
2018 Fiscal Year Funding Amount
$75,630
Fund Source

The consultant LimnoTech will support response to Total Maximum Daily Load (TMDL) comments the peer review process, United States Environmental Protection Agency and public notice. They will then revise the TMDL document as needed and attend internal and external project meetings.

Anoka
Carver
Dakota
Dodge
Goodhue
Hennepin
Le Sueur
McLeod
Mower
Nicollet
Olmsted
Ramsey
Renville
Rice
Scott
Sherburne
Sibley
Steele
Wabasha
Washington
Wright
Recipient
LimnoTech
2016 Fiscal Year Funding Amount
$62,280
Fund Source

The goal of this project is to prepare a draft Lake Pepin Total Maximum Daily Load (TMDL) Report. Lake Pepin is impaired by high levels of nutrients that cause excessive growth of algae.

Dakota
Goodhue
Scott
Wabasha
Recipient
Tetra Tech Inc
2019 Fiscal Year Funding Amount
$149,903
Fund Source

The goal of this project is to simulate up to ten scenarios using the recently completed Hydrologic Simulation Program FORTRAN (HSPF) model for the Mississippi River–Lake Pepin (MRLP) watershed. The mode will be used to investigate a variety of management scenarios to support further planning work and implementation in the watershed. Model scenarios are being developed to inform 1W1P planning activities and future implementation.

Olmsted
Wabasha
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$90,980
Fund Source

The goal of this project is to complete the construction, calibration, and validation of a Hydrological Simulation Program – FORTRAN (HSPF) watershed model for a portion of the Mississippi River-Lake Pepin watershed.

Goodhue
Wabasha
Recipient
United States Geological Survey (USGS)
2015 Fiscal Year Funding Amount
$18,375
Fund Source

The study will assess existing phosphorus data records and create a model to explain phosphorus loading into the Red River of the North. Studies have found that the majority of nutrient loading in the stream located in agricultural areas occurs with sediment loading since nutrients are typically bound to sediment particles.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
RESPEC
2017 Fiscal Year Funding Amount
$49,999
Fund Source

The goal of this project is to extend, calibrate, and validate the existing Hydrological Simulation Program – FORTRAN (HSPF) watershed models in the Red Lake River, Thief River, Clearwater River and Red Lake watersheds.

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
RESPEC
2016 Fiscal Year Funding Amount
$99,991
Fund Source

The goal of this project is to construct, calibrate, and validate a watershed model using the Hydrological Simulation Program FORTRAN (HSPF) model for the Upper/Lower Red Lake Watershed. The contractor will produce an HSPF model that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) Studies. The model will generate predicted output for hydrology, sediment, nutrients, and dissolved oxygen that is consistent with observed data.

Beltrami
Clearwater
Itasca
Koochiching
Recipient
RESPEC
2015 Fiscal Year Funding Amount
$99,999
Fund Source

The goal of this project is to construct, calibrate and validate a watershed model using Hydologic Simulation Program FORTRAN (HSPF) for the Roseau River Watershed.

Beltrami
Kittson
Lake of the Woods
Marshall
Roseau
Recipient
Houston Engineering
2013 Fiscal Year Funding Amount
$33,096
Fund Source

This project will finalize the Hydrologic Simulation Program FORTRAN (HSPF) watershed model construction and complete the calibration/validation process. The consultant will produce an HSPF watershed model that can readily be used to provide information to support conventional parameter TMDLs.

Beltrami
Marshall
Pennington
Roseau
Recipient
RESPEC
2016 Fiscal Year Funding Amount
$71,525
Fund Source

This project will extend, calibrate, and validate watershed models using the Hydrological Simulation Program - FORTRAN (HSPF) watershed model for the Mississippi Headwaters, Leech Lake, Pine, and South Fork Crow Watersheds.

Aitkin
Becker
Beltrami
Carver
Cass
Clearwater
Crow Wing
Hennepin
Hubbard
Itasca
Kandiyohi
McLeod
Meeker
Renville
Sibley
Wright
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$134,960
Fund Source

The primary goal of this project is to examine the calibration and validation of recently extended Hydrological Simulation Program – FORTRAN (HSPF) watershed models for the Mississippi River-Headwaters, Mississippi River-Grand Rapids, Mississippi River-Brainerd, Mississippi River-Sartell, Mississippi River-St. Cloud, Leech Lake, Pine River, Crow Wing River, Long Prairie River, and Redeye River watersheds and revise the calibration.

Aitkin
Becker
Beltrami
Benton
Carlton
Cass
Clearwater
Crow Wing
Douglas
Hubbard
Itasca
Mille Lacs
Morrison
Otter Tail
Pine
Sherburne
St. Louis
Stearns
Todd
Wadena