Minnesota's Legacy

All Projects

Showing 1 - 40 of 71 | Export projects
Recipient
Aitkin County SWCD
2013 Fiscal Year Funding Amount
$5,973
Fund Source

The goal of the project is to complete the dataset for the assessment of Aquatic Recreation Use in Cedar Lake by monitoring total phosphorus, chlorophyll-a, and secchi depth.

Aitkin
Recipient
Chisago SWCD
2015 Fiscal Year Funding Amount
$30,000
Fund Source

The Chisago Soil and Water Conservation District has been successful in implementing Best Management Practices in certain targeted locations within the county, including the prioritized and assessed areas of Chisago City, Lindstrom, and Center City. However, there are many areas that want to implement conservation projects but aren't within targeted areas. This award will empower community partners, especially lake associations, to award grants for rain gardens, shoreline buffers, and other worthwhile projects to improve water quality.

Chisago
Recipient
Benton SWCD
2017 Fiscal Year Funding Amount
$6,600
Fund Source

The Benton County Water Plan advisory committee has the goal of protecting groundwater resources in Benton County. One of the methods identified is to seal unused wells. In 2013, Benton Soil and Water Conservation District completed an aggressive campaign to identify unused wells. We used several sources to locate potential wells, completed site visits for many wells and collected site information to assisting in prioritizing limited cost share resources.

Benton
Recipient
Kanabec SWCD
2014 Fiscal Year Funding Amount
$165,590
Fund Source

The Ann River Watershed is a sub-watershed of the Snake River Watershed located within the St. Croix River Basin. The Ann River watershed includes Ann Lake, Fish Lake, Ann River and its tributaries. This project will focus on watershed load reductions. Based on the strategies found in the Implementation Plan, the first priority will be to target the animal and cropland - agricultural areas on the Ann River and its tributaries. The second priority will be to target the lake shore and streambank areas in the non-agricultural areas.

Kanabec
Recipient
City of Elk River
2011 Fiscal Year Funding Amount
$285,087
Fund Source

Great River Energy (GRE) operates a power plant in the City of Elk River which generates electricity by incinerating municipal solid wastes. The plant is located proximate to the City of Elk River wastewater treatment plant (WWTP). This project will result in a corresponding reduction of groundwater use by GRE.

Sherburne
Recipient
Isanti SWCD
2018 Fiscal Year Funding Amount
$251,545
Fund Source
Isanti
Recipient
Crow Wing SWCD
2014 Fiscal Year Funding Amount
$150,000
Fund Source

The Crow Wing Soil and Water Conservation District (SWCD) will engage citizen and nonprofit groups to enhance, improve, and protect Crow Wing County (CWC) lakes and rivers. To do this, the SWCD will partner with the University of Minnesota Extension, MN DNR, CWC, nonprofits, and lake associations to implement a mini grant program and provide grant funds to 20 community groups.

Crow Wing
Recipient
Crow Wing SWCD
2015 Fiscal Year Funding Amount
$150,000
Fund Source

The Crow Wing Soil and Water Conservation District (SWCD) will partner with citizen groups and nonprofit groups to complete projects to reduce stormwater runoff and retain water on the land in Crow Wing County's (CWC) 125 minor watersheds. The SWCD will implement a mini grant program and provide competitive grant funds to an anticipated 12 groups. This project will also address CWC Water Plan priorities one, two, and six, which involve stormwater management and sediment control, shoreline buffers, and agriculture best management practices.

Crow Wing
Recipient
Crow Wing SWCD
2017 Fiscal Year Funding Amount
$150,000
Fund Source

The Crow Wing Soil and Water Conservation District (SWCD) proposes to partner with citizen groups and nonprofit groups to complete projects that will reduce polluted runoff and keep water on the land in Crow Wing County's (CWC) 125 minor watersheds. To do this, the SWCD will implement a mini grant program and provide competitive grant funds to an anticipated 12 groups. Citizens groups will use their innovation and creativity to apply for project funds through the SWCD.

Crow Wing
Recipient
Polk, West SWCD
2015 Fiscal Year Funding Amount
$45,000
Fund Source

Phase II of the Burnham Creek Watershed Restoration Project will conduct inventory on 2,050 acres, 85.4 miles of ditch channel within the Burnham Creek Watershed of West Polk County. This inventory includes surveying, assembling all available GIS data, ArcMap, LiDAR, review aerial photography, location of tile intakes, determine size of the erosion sites, and prioritization of severity. The district will partner with the Area DNR Hydrologist and the Polk County Highway Department-Drainage & Ag Inspector to verify data and identify any additional ditch segments.

Polk
Recipient
Area 4 - Metropolitan SWCDs Technical Service Area
2016 Fiscal Year Funding Amount
$200,000
Fund Source

Once thought to have an essentially inexhaustible groundwater supply, Minnesotans are now realizing our rates of use are regionally unsustainable. Recent advanced modeling by the MN DNR and Metropolitan Council of aquifer supplies, in conjunction with predicted demand, indicate the major metropolitan area aquifers are currently subject to extraction rates that exceed recharge. Simply stated, we are mining our groundwater.

Scott
Recipient
Crow Wing County
2016 Fiscal Year Funding Amount
$31,000
Fund Source

Crow Wing County, in cooperation with the municipalities within the County, plans to continue its successful well sealing program that pays 50% of the cost to seal unused/abandoned wells up to a maximum of $1000 per well. The amount of funding requested is $31,000 which is estimated to allow for the sealing of 80-100 wells. From 2012 to 2015, Crow Wing County sealed 65 wells as part of an earlier MDH well sealing grant from the Clean Water Fund. Priority will be given to wells located in or near existing wellhead protection areas.

Crow Wing
Recipient
Crow Wing Soil and Water Conservation District (SWCD)
2013 Fiscal Year Funding Amount
$14,987
Fund Source

The project will include lake monitoring on three (3) lakes found in the Rum River watershed in southeastern Crow Wing County (CWC). The project will be conducted in an effort to gain sufficient data on these data-deficient lake sites. All of the proposed monitoring sites are target sites for 2013-2014. One of the goals of the CWC Local Comprehensive Water Plan (CWP) is to establish a countywide Comprehensive Monitoring Plan (CMP).

Aitkin
Anoka
Benton
Chisago
Crow Wing
Isanti
Kanabec
Mille Lacs
Morrison
Sherburne
Recipient
Sand Hill River Watershed District
2011 Fiscal Year Funding Amount
$178,139
Fund Source

This first phase of project will define the existing watershed conditions; identify gaps in existing data; design and implement a plan to address data gaps; incorporate gap data into watershed description; guide development of the HSPF model; establish citizen advisory, technical advisory and locally-based focus groups; research and design an education and outreach strategy; and design and deploy the tools and methods to employ the strategy.

Mahnomen
Norman
Polk
Recipient
Mille Lacs SWCD
2015 Fiscal Year Funding Amount
$7,500
Fund Source

This project will identify and prioritize opportunities to implement a multipurpose drainage management plan that will provide adequate drainage capacity, reduce peak flows and flooding and reduce erosion and sediment loading, improving water quality to the West Branch Rum River.

Mille Lacs
Recipient
Minnesota Department of Health
2019 Fiscal Year Funding Amount
$1,100,000
2018 Fiscal Year Funding Amount
$1,100,000
2017 Fiscal Year Funding Amount
$1,100,000
2016 Fiscal Year Funding Amount
$1,100,000
2015 Fiscal Year Funding Amount
$1,150,000
2014 Fiscal Year Funding Amount
$1,150,000
2013 Fiscal Year Funding Amount
$1,020,000
2012 Fiscal Year Funding Amount
$1,020,000
2011 Fiscal Year Funding Amount
$744,717
2010 Fiscal Year Funding Amount
$250,291
Fund Source

The Drinking Water Contaminants of Emerging Concern (CEC) program identifies environmental contaminants for which current health-based standards currently do not exist or need to be updated, investigate the potential for human exposure to these chemicals, and develop guidance values for drinking water. Contaminants evaluated by CEC staff include contaminants that have been released or detected in Minnesota waters (surface water and groundwater) or that have the potential to migrate to or be detected in Minnesota waters.

Statewide
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$49,986
Fund Source

The goal of this project is to continue and finalize Hydrologic Simulation Program FORTRAN (HSPF) watershed model construction and complete the calibration/validation process. The project will add representation of point source discharges to the model, compile flow and water quality data for the purposes of calibration and validation. The end result will be an HSPF watershed model that can readily be used to provide information to support conventional parameter TMDLs.

Mahnomen
Norman
Polk
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$253,710
Fund Source

The goal of this project is to construct, calibrate, and validate five Hydrologic Simulation Program FORTRAN (HSPF) watershed models. The outcome will be HSPF models that can readily be used to provide information to support conventional parameter TMDLs. These models will generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.

Wright
Todd
Stearns
St. Louis
Sherburne
Morrison
Mille Lacs
Meeker
Kanabec
Itasca
Isanti
Chisago
Cass
Carlton
Benton
Anoka
Aitkin
Recipient
Isanti SWCD
2015 Fiscal Year Funding Amount
$99,736
Fund Source

This project will install nearly 800 linear feet of restored lakeshore with an emphasis on bioengineering techniques, native plants and locating buffers/swales at points of concentrated overland flow into Green Lake. By targeting properties that are eroding and/or with concentrated overland flow to the lake we will reduce suspended solids discharge by 16,697 lbs/yr and phosphorus by 1.3 lbs/yr.

Isanti
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$396,300
Fund Source

The goal of this project is to continue and finalize HSPF watershed model construction and complete the calibration/validation process.

Aitkin
Anoka
Becker
Beltrami
Benton
Carlton
Cass
Clearwater
Crow Wing
Hubbard
Isanti
Itasca
Kanabec
Meeker
Mille Lacs
Morrison
Sherburne
St. Louis
Stearns
Todd
Wright
Recipient
RESPEC
2016 Fiscal Year Funding Amount
$39,967
Fund Source

The goal of this project is to refine the segmentation, extend the simulation period, and recalibrate an existing Hydrologic Simulation Program FORTRAN (HSPF) watershed model for the Rum River Watershed.

Aitkin
Anoka
Benton
Chisago
Crow Wing
Isanti
Kanabec
Mille Lacs
Morrison
Sherburne
Recipient
RESPEC
2011 Fiscal Year Funding Amount
$214,963
Fund Source

This project will complete spatial and temporal revisions of 6 Hydrologic Simulation Program FORTRAN (HSPF) models, the recalibration and validation of 7 watershed HSPF models, and the revision of the drainage network and point source representation of the Pomme de Terre HSPF model.

Big Stone
Blue Earth
Brown
Carver
Cottonwood
Dakota
Douglas
Faribault
Freeborn
Grant
Hennepin
Jackson
Le Sueur
Lincoln
Lyon
Mahnomen
Martin
McLeod
Murray
Nicollet
Norman
Otter Tail
Pipestone
Polk
Ramsey
Redwood
Renville
Rice
Scott
Sibley
Steele
Stevens
Swift
Waseca
Watonwan
Yellow Medicine
Recipient
Isanti County
2014 Fiscal Year Funding Amount
$37,900
Fund Source

Provide funding to counties to assist low-income homeowners with needed Subsurface Sewage Treatment Systems (SSTS) upgrades to protect public health and the environment.

Isanti
Recipient
Anoka CD
2016 Fiscal Year Funding Amount
$60,000
Fund Source

Lake George is the premier recreational lake in Anoka County with above average water quality, a vibrant fishery, and a large regional park and beach that is among the most utilized in the county. Located in northwestern Anoka County within the Upper Rum River Watershed Management Organization (URRWMO), the Lake George Improvement District (LGID) was formed to tend to the lake's diminishing water quality and problematic invasive species.

Anoka
Recipient
Crow Wing County
2015 Fiscal Year Funding Amount
$67,300
Fund Source

This project is a cooperative effort between Crow Wing and Itasca County to contract with RMB Laboratories to generate 65 lake assessment/trend analysis reports. The watershed protection model is an innovative and proactive approach to water resource management which is geared towards prioritizing areas of concern, targeting implementation strategies, and measuring their effectiveness. These assessments are also useful and understandable tools for lake associations and the public.

Crow Wing
Itasca
Recipient
Benton SWCD
2014 Fiscal Year Funding Amount
$79,400
Fund Source

Little Rock Creek, a cold-water trout stream in central Minnesota, is impaired due to the lack of trout and other cold water fish. The trout are absent because of high water temperatures, low dissolved oxygen and high nitrate levels, stressors caused from a lack of base flow and overuse of groundwater. This project continues a 2011 initiative to assist irrigators in the Little Rock Creek groundwater recharge area with managing the timing and amount of irrigation applied to their crops.

Benton
Morrison
Recipient
Isanti SWCD
2016 Fiscal Year Funding Amount
$25,000
Fund Source

This project will install practices to improve water quality in Long Lake, Isanti Co. We will install at least 350 linear feet of restored lakeshore and 3,000 sq ft of native plant stormwater treatment with an emphasis on bioengineering techniques, native plants and locating buffers/swales/rain gardens at points of concentrated overland flow into the lake. By targeting properties that are eroding and/or with concentrated overland flow to the lake we will reduce suspended solids discharge by 6,300 lbs/yr and phosphorus by 0.6 lbs/yr.

Isanti
Recipient
Isanti SWCD
2017 Fiscal Year Funding Amount
$30,405
Fund Source

This project will result in the installation of give water quality practices totaling 350 linear feet of restored lakeshore and 6,000 square feet of native plant stormwater management. By targeting properties that are eroding and/or with concentrated overland flow to the lake, pollutant discharge to the lake will be reduced.

Isanti
Recipient
International Water Institute
2012 Fiscal Year Funding Amount
$134,867
Fund Source

This project will support water quality monitoring and data analysis in the Red River Basin. The monitoring will assist in providing water chemistry data needed to calculate annual pollutant loads for the Major Watershed Load Monitoring Program (MWLMP) and provide short term data sets of select parameters to other MPCA programs.

Beltrami
Clearwater
Kittson
Mahnomen
Marshall
Norman
Pennington
Polk
Red Lake
Roseau
Recipient
Area 4 - Metropolitan SWCDs Technical Service Area
2014 Fiscal Year Funding Amount
$250,000
Fund Source

Ensuring natural resource practitioners are applying state-of-the-art approaches is the best way to achieve optimum Best Management Practice (BMP) selection, design, and placement in the landscape, thereby maximizing Clean Water Fund (CWF) benefits. To that end, it is critical to train new staff, create modeling protocols for new BMPs, refine and calibrate models, and test ever-advancing modeling applications.

Scott
Recipient
Mille Lacs SWCD
2017 Fiscal Year Funding Amount
$268,747
Fund Source

This grant will fund the creation of a new Coordinator position with a primary focus on the Mille Lacs Lake subwatershed. Although not currently impaired, the Lake faces increasing development and land use pressure. Implementation of protection strategies is essential to the Lake's long-term health but current staffing does not allow sufficient time to be spent on project development and outreach to identify interested landowners.

Aitkin
Crow Wing
Mille Lacs
Recipient
Minnesota Pollution Control Agency
2014 Fiscal Year Funding Amount
$297,169
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Pollution Control Agency
2015 Fiscal Year Funding Amount
$287,628
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Pollution Control Agency
2013 Fiscal Year Funding Amount
$5,265,335
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities within the described priority watersheds.

Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support.

Aitkin
Anoka
Benton
Big Stone
Blue Earth
Brown
Chippewa
Chisago
Cook
Cottonwood
Crow Wing
Faribault
Freeborn
Isanti
Jackson
Kanabec
Kittson
Lac qui Parle
Lake
Le Sueur
Marshall
Martin
Mille Lacs
Morrison
Nicollet
Pennington
Pine
Polk
Redwood
Renville
Roseau
Sibley
Stevens
Swift
Traverse
Watonwan
Recipient
Minnesota Pollution Control Agency
2011 Fiscal Year Funding Amount
$3,521,699
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities.

Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support.

Becker
Beltrami
Blue Earth
Carlton
Dakota
Dodge
Douglas
Freeborn
Goodhue
Jackson
Lake
Le Sueur
Lincoln
Mahnomen
Marshall
Morrison
Murray
Nobles
Norman
Otter Tail
Pennington
Pine
Pipestone
Polk
Rice
Rock
Roseau
Scott
St. Louis
Steele
Todd
Wadena
Waseca
Recipient
Sherburne SWCD
2014 Fiscal Year Funding Amount
$150,400
Fund Source

This project combines the use of automated soil moisture probes for irrigation scheduling with diverse cover crop planting to reduce or eliminate leaching of nitrogen and other nutrients on cropland with an early season harvested crop in the rotation. The more efficient use of irrigation waters provides a secondary benefit: less withdrawal from the aquifers that provide recharge for the Mt. Simon-Hinckley aquifer.

Sherburne
Recipient
Polk , East SWCD
2014 Fiscal Year Funding Amount
$364,880
Fund Source

Increases in crop prices have reduced the acreage of land in conservation set-aside programs such as the Conservation Reserve Program and other marginal land use. Significant conversion of grasslands to cultivated agricultural crops has increased the levels of runoff and sedimentation. Phase III of this project addresses the need to protect vulnerable sites by installing water and sediment basins. These basins are earthen embankments built to temporarily detain sediment-laden runoff, allowing sediment to settle out before runoff is discharged.

Polk
Recipient
Polk , East SWCD
2015 Fiscal Year Funding Amount
$253,800
Fund Source

This project is Phase IV of work to install water and sediment basins located within Sand Hill Watershed. A water and sediment basin is an earthen embankment built so that sediment-laden runoff is temporarily detained, allowing sediment to settle out before runoff is discharge. These are installed on agricultural cropland where erosion exceeds the allowable soil rate. Minimum detention time to store water is 36 hours for a 10 year, 24 hour runoff event. Starting in 2010, the District received dollars to assist landowners with flood-related projects.

Polk
Recipient
Sand Hill River WD
2017 Fiscal Year Funding Amount
$68,800
Fund Source

Consistent with the implementation recommendation of the Total Maximum Daily Load Study , the goal of this project is to install 30 grade stabilization structures along Polk County Ditch 80 to reduce sediment loading by 270 tons per year. Polk County Ditch 80 contributes a large amount of sediment to the Sand Hill River which currently does not meet state water quality standards for sediment.

Polk
Recipient
Red River Watershed Mgmt Board
2014 Fiscal Year Funding Amount
$235,250
Fund Source

The Prioritization, Targeting, and Measuring Water Quality Improvement Application (PTMA) connects the general qualitative strategies in a Total Maximum Daily Load (TMDL) and Watershed Restoration and Protection (WRAP) and the identification of implementable on-the-ground Best Management Practices (BMPs). Leveraging geospatial data from the International Water Institute this application will be developed for two pilot areas within the Red River Basin.

Becker
Cass
Clay
Grant
Mahnomen
Norman
Otter Tail
Traverse