Minnesota's Legacy

All Projects

Showing 1 - 40 of 73 | Export projects
Recipient
International Water Institute
2013 Fiscal Year Funding Amount
$56,031
Fund Source

The goal of this project is to collect data, water chemistry and field parameters, which will be paired with biological data collected by the MPCA to assess water quality conditions at seven sites along targeted reaches within the Snake River Watershed and five sites in the Two River Watershed.

Kittson
Marshall
Pennington
Polk
Roseau
Recipient
Aitkin County SWCD
2013 Fiscal Year Funding Amount
$5,973
Fund Source

The goal of the project is to complete the dataset for the assessment of Aquatic Recreation Use in Cedar Lake by monitoring total phosphorus, chlorophyll-a, and secchi depth.

Aitkin
Recipient
Braun Intertec
2017 Fiscal Year Funding Amount
$80,687
2018 Fiscal Year Funding Amount
$17,828
Fund Source

This project will complete the installation of four nested wells to the Ambient Groundwater Monitoring Network and relocated one well in the City of Saint Paul. Braun Intertec will coordinate site access and oversee the well installation by a state drilling contractor.

Anoka
Hennepin
Ramsey
Recipient
Minnesota Humanities Center
2018 Fiscal Year Funding Amount
$150,000
Fund Source

The goal of this project is to use the We Are Water MN exhibit and their technical knowledge in relationship-building and storytelling to increase community capacity for sustainable watershed management in the Cannon River, Cedar River, Mississippi-Headwaters, Mississippi-Grand Rapids, Mississippi-Twin Cities, Red Lake River, Rum River and St. Louis River watersheds.

Benton
Carlton
Dakota
Hennepin
Itasca
Mille Lacs
Mower
Polk
Recipient
City of Elk River
2011 Fiscal Year Funding Amount
$285,087
Fund Source

Great River Energy (GRE) operates a power plant in the City of Elk River which generates electricity by incinerating municipal solid wastes. The plant is located proximate to the City of Elk River wastewater treatment plant (WWTP). This project will result in a corresponding reduction of groundwater use by GRE.

Sherburne
Recipient
Red Lake Watershed District
2019 Fiscal Year Funding Amount
$7,500
Fund Source

This project will produce a final Total Maximum Daily Load (TMDL) study and Watershed Restoration and Protection Strategy (WRAPS) report that will be utilized by local government units for water planning purposes during the Board of Water and Soil Resources One Water One Plan process for the Clearwater River Watershed.

Beltrami
Clearwater
Pennington
Recipient
Red Lake Watershed District
2014 Fiscal Year Funding Amount
$185,473
2016 Fiscal Year Funding Amount
$100,000
Fund Source

The overall goal is to develop a Watershed Restoration and Protection Strategy (WRAPS) Report and Total Maximum Daily Load (TMDL) Study that will address water quality impairments and maintain or improve water quality throughout the Clearwater River watershed. The study will identify sources of pollutants to the streams and lakes, allocate pollution reduction goals, and prioritize and identify implementation strategies to maintain or improve water quality in key lakes and streams in the watershed.

Beltrami
Clearwater
Mahnomen
Pennington
Polk
Red Lake
Recipient
Clearwater Soil and Water Conservation District
2014 Fiscal Year Funding Amount
$19,982
Fund Source

This project will provide the assessment of the chemical, physical, biological, and bacteriological integrity of surface waters.

Clearwater
Recipient
Clearwater Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$6,290
Fund Source

This project will complete a lake data set for 303(d) and Aquatic Recreation use assessments in Clearwater County by monitoring total phosphorus, chlorophyll-a and Secchi depth; by utilizing lakeshore owners.

Clearwater
Recipient
Crow Wing Soil and Water Conservation District (SWCD)
2013 Fiscal Year Funding Amount
$14,987
Fund Source

The project will include lake monitoring on three (3) lakes found in the Rum River watershed in southeastern Crow Wing County (CWC). The project will be conducted in an effort to gain sufficient data on these data-deficient lake sites. All of the proposed monitoring sites are target sites for 2013-2014. One of the goals of the CWC Local Comprehensive Water Plan (CWP) is to establish a countywide Comprehensive Monitoring Plan (CMP).

Aitkin
Anoka
Benton
Chisago
Crow Wing
Isanti
Kanabec
Mille Lacs
Morrison
Sherburne
Recipient
RESPEC
2012 Fiscal Year Funding Amount
$67,972
Fund Source

This project will construct three watershed framework models built using the Hydrologic Simulation Program FORTRAN. These executable models will simulate hydrology at the 12-digit HUC subbasin scale. An HSPF model will be built for each of the following 8-HUC watersheds: Red Lake River (09020303) and the Clearwater River (09020305).

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
Minnesota Department of Health
2019 Fiscal Year Funding Amount
$1,100,000
2018 Fiscal Year Funding Amount
$1,100,000
2017 Fiscal Year Funding Amount
$1,100,000
2016 Fiscal Year Funding Amount
$1,100,000
2015 Fiscal Year Funding Amount
$1,150,000
2014 Fiscal Year Funding Amount
$1,150,000
2013 Fiscal Year Funding Amount
$1,020,000
2012 Fiscal Year Funding Amount
$1,020,000
2011 Fiscal Year Funding Amount
$744,717
2010 Fiscal Year Funding Amount
$250,291
Fund Source

The Drinking Water Contaminants of Emerging Concern (CEC) program identifies environmental contaminants for which current health-based standards currently do not exist or need to be updated, investigate the potential for human exposure to these chemicals, and develop guidance values for drinking water. Contaminants evaluated by CEC staff include contaminants that have been released or detected in Minnesota waters (surface water and groundwater) or that have the potential to migrate to or be detected in Minnesota waters.

Statewide
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$99,986
Fund Source

This project will finalize HSPF watershed model construction and complete the calibration/validation process. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval.

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$253,710
Fund Source

The goal of this project is to construct, calibrate, and validate five Hydrologic Simulation Program FORTRAN (HSPF) watershed models. The outcome will be HSPF models that can readily be used to provide information to support conventional parameter TMDLs. These models will generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.

Wright
Todd
Stearns
St. Louis
Sherburne
Morrison
Mille Lacs
Meeker
Kanabec
Itasca
Isanti
Chisago
Cass
Carlton
Benton
Anoka
Aitkin
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$89,968
Fund Source

The goal of this project is to construct, calibrate, and validate a watershed model using Hydrologic Simulation Program FORTRAN (HSPF). The project will result in a HSPF model that can readily be used to provide information to support conventional parameter TMDLs.

Kittson
Marshall
Roseau
Recipient
Lake of the Woods Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$108,044
Fund Source

This project involves the water quality monitoring of, and data analysis for four major watersheds (8-digit Hydrologic Unit Codes) in the Rainy River Basin. This monitoring will assist in providing the water chemistry data needed to calculate annual pollutant loads for the Major Watershed Pollutant Load Monitoring Network (MWPLMN) and provide short term data sets of select parameters to other Agency programs.

Beltrami
Itasca
Koochiching
Lake of the Woods
St. Louis
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$396,300
Fund Source

The goal of this project is to continue and finalize HSPF watershed model construction and complete the calibration/validation process.

Aitkin
Anoka
Becker
Beltrami
Benton
Carlton
Cass
Clearwater
Crow Wing
Hubbard
Isanti
Itasca
Kanabec
Meeker
Mille Lacs
Morrison
Sherburne
St. Louis
Stearns
Todd
Wright
Recipient
RESPEC
2011 Fiscal Year Funding Amount
$174,579
Fund Source

This project will construct, calibrate, and validate two Hydrologic Simulation Program FORTRAN (HSPF) watershed models. The consultant will produce HSPF models that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDLs) at the Big Fork River and Little Fork River watersheds.

Itasca
Koochiching
St. Louis
Recipient
RESPEC
2016 Fiscal Year Funding Amount
$39,967
Fund Source

The goal of this project is to refine the segmentation, extend the simulation period, and recalibrate an existing Hydrologic Simulation Program FORTRAN (HSPF) watershed model for the Rum River Watershed.

Aitkin
Anoka
Benton
Chisago
Crow Wing
Isanti
Kanabec
Mille Lacs
Morrison
Sherburne
Recipient
Isanti County
2014 Fiscal Year Funding Amount
$37,900
Fund Source

Provide funding to counties to assist low-income homeowners with needed Subsurface Sewage Treatment Systems (SSTS) upgrades to protect public health and the environment.

Isanti
Recipient
Itasca SWCD
2019 Fiscal Year Funding Amount
$18,016
Fund Source

This contract is for Itasca County Soil and Water Conservation District (SWCD) to assist in the public participation activities in Rainy Basin Watersheds of Little Fork and Big Fork.

Itasca
Recipient
Itasca County Soil and Water Conservation District
2014 Fiscal Year Funding Amount
$69,980
Fund Source

This project will develop, implement, and evaluate the impacts of co-developed civic engagement outcomes for the St. Louis River, Big Fork River, and Littlefork River watersheds.

Itasca
Recipient
Koochiching County Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$73,777
2014 Fiscal Year Funding Amount
$181,976
Fund Source

The Koochiching County SWCD staff will collect water chemistry and field parameters at specific times to determine amount of contaminant load into each stream. These sites will coincide with locations where stream flow data is also being collected. This project will focus on watershed load monitoring in both the Big Fork and Little Fork River watersheds.

Itasca
Koochiching
St. Louis
Recipient
Koochiching County SWCD
2019 Fiscal Year Funding Amount
$35,388
Fund Source

Four stream segments, totaling over 100 miles, are impaired in the Little Fork River for Total Suspended Solids (TSS). This study will provide local partners with project options for reducing sediment in the Little Fork Watershed. Through the use of sediment fingerprinting determinations can be made if the sediment is from in (or near) channel, or the watershed and identify what sub-watershed the sediment is coming originating.

Itasca
Koochiching
Recipient
Koochiching SWCD
2018 Fiscal Year Funding Amount
$81,391
Fund Source

The Little Fork River Watershed Assessment will include the waters of the Rice River, Little Fork River, Flint Creek, Nett Lake River, Beaver Brook, Valley River, Willow River, Sturgeon River, Bear River, Dark River, and the Lost River. This Assessment will also include Little Bear Lake, Bear Lake, Thistledew Lake, Little Moose Lake, Raddison Lake, Napoleon Lake, Owen Lake, Dark Lake, Clear Lake, Long (Main) Lake, Dewey Lake, and Long (North) Lake. These lakes and streams are found throughout the Little Fork River Watershed, which spans parts of Koochiching, St. Louis and Itasca Counties.

Itasca
Koochiching
St. Louis
Recipient
United States Geological Survey (USGS)
2013 Fiscal Year Funding Amount
$140,000
Fund Source

The Little Fork River and Big Fork River - USGS FLOWSED project was established to collect site specific data for streamflow, SSC, and bedload at the Littlefork and Big Fork Rivers in Northern Minnesota; use the data to evaluate the use of dimensionless sediment rating curves for the rivers; and document the results of the study in conjunction with the results from other rivers in the state for the application of regional sediment rating curves to rivers in Minnesota.

Itasca
Koochiching
Recipient
Emmons & Oliver Resources (EOR)
2014 Fiscal Year Funding Amount
$100,006
Fund Source
This project will develop and finalize the WRAPS for the Little Fork River Watershed.
Itasca
Koochiching
Recipient
Emmons & Olivier Resources Inc
2017 Fiscal Year Funding Amount
$3,730
Fund Source

The purpose of this project is to re-calculate the Littlefork river sediment Total Maximum Daily Load (TMDL) utilizing the 15 mg/L Total Suspended Solids (TSS) standard and update the associated Littlefork Watershed Restoration and Protection Strategies (WRAPS) document.

Itasca
Koochiching
Recipient
International Water Institute
2012 Fiscal Year Funding Amount
$134,867
Fund Source

This project will support water quality monitoring and data analysis in the Red River Basin. The monitoring will assist in providing water chemistry data needed to calculate annual pollutant loads for the Major Watershed Load Monitoring Program (MWLMP) and provide short term data sets of select parameters to other MPCA programs.

Beltrami
Clearwater
Kittson
Mahnomen
Marshall
Norman
Pennington
Polk
Red Lake
Roseau
Recipient
Metropolitan Council Environmental Services
2018 Fiscal Year Funding Amount
$176,657
2019 Fiscal Year Funding Amount
$123,343
Fund Source

The Minnesota Pollution Control Agency’s (MPCA) Watershed Pollutant Load Monitoring Network (WPLMN) forms the core of a long-term program designed to measure and compare regional differences and trends in pollutant loadings from Minnesota’s mainstem rivers and the outlets of major watersheds and subwatersheds draining to these rivers.

Hennepin
Recipient
Minnesota Pollution Control Agency
2013 Fiscal Year Funding Amount
$5,265,335
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities within the described priority watersheds.

Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support.

Aitkin
Anoka
Benton
Big Stone
Blue Earth
Brown
Chippewa
Chisago
Cook
Cottonwood
Crow Wing
Faribault
Freeborn
Isanti
Jackson
Kanabec
Kittson
Lac qui Parle
Lake
Le Sueur
Marshall
Martin
Mille Lacs
Morrison
Nicollet
Pennington
Pine
Polk
Redwood
Renville
Roseau
Sibley
Stevens
Swift
Traverse
Watonwan
Recipient
Minnesota Pollution Control Agency
2014 Fiscal Year Funding Amount
$297,169
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Pollution Control Agency
2015 Fiscal Year Funding Amount
$287,628
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Department of Natural Resources
2011 Fiscal Year Funding Amount
$140,000
Fund Source

The Minnesota Department of Natural Resources will coordinate the collection of high-resolution elevation data for northeastern portion of Minnesota using Light Detection and Ranging (LIDAR) systems. The geographic area of the work includes Minnesota counties of Carlton, Cook, Lake, and St. Louis Counties and that portion of Koochiching County that comprises Voyageurs National Park.

Carlton
Cook
Koochiching
Lake
St. Louis
Recipient
University of Minnesota Center for Changing Landscapes
2018 Fiscal Year Funding Amount
$15,490
Fund Source

This project seeks assistance from University of Minnesota in developing effective interview questions for community watershed assessments and will assist in understanding the data collected through community interviews.

Itasca
Koochiching
Lake of the Woods
Recipient
Koochiching County SWCD
2019 Fiscal Year Funding Amount
$323,695
Fund Source

Koochiching County has seven major watersheds in the county, this contract is for work in five of them: Big Fork, Little Fork, Rapid River, Lower Rainy River, and Rainy River Headwaters. The local Koochiching County Soil and Water Conservation District (SWCD) is positioned to assist in several elements of the Watershed Restoration and Protection Strategies (WRAPS) process. This includes gap monitoring for water chemistry, sediment work, Total Maximum Daily Load (TMDL) development, modeling scenarios, and WRAPS development.

Itasca
Koochiching
St. Louis
Recipient
Koochiching County SWCD
2017 Fiscal Year Funding Amount
$99,930
Fund Source

This project will provide an important framework for civic and citizen engagement and communication in the International Rainy River-Lake of the Woods Watershed, which will contribute to long-term public participation in surface water protection and restoration activities.

Cook
Itasca
Koochiching
Lake
Lake of the Woods
St. Louis
Recipient
Koochiching County SWCD
2019 Fiscal Year Funding Amount
$94,650
Fund Source

The purpose of this contract is to establish an international watershed coordinator for the Rainy River- Lake of the Woods (RR-LOW) watershed. The coordinator will assist the Minnesota Pollution Control Agency (MPCA) in facilitating and enhancing civic engagement and public participation activities through collaboration and integration of the efforts of groups working on watershed activities at local, state/provincial, tribal, and bi-national levels.

Koochiching
Recipient
University of Minnesota Center for Changing Landscapes
2018 Fiscal Year Funding Amount
$15,490
Fund Source

The University of Minnesota will develop effective interview questions for community watershed assessments in the Rainy River basin and provide assistance in understanding the data collected through community interviews.

Itasca
Koochiching
Lake of the Woods
Recipient
Koochiching Soil & Water Conservation District
2016 Fiscal Year Funding Amount
$75,000
2018 Fiscal Year Funding Amount
$51,212
2019 Fiscal Year Funding Amount
$35,756
Fund Source

The goal of this project is to conduct water chemistry monitoring at four subwatershed sites and two basin sites in 2016 and 2017; and six subwatershed sites and three basin sites in 2018-2019 based on flow conditions, targeting runoff events using protocols defined in the Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedures and Guidance. The data collected will be submitted to the Minnesota Pollution Control Agency (MPCA) and used in the FLUX32 model for calculating pollutant loads.

Koochiching
St. Louis