Minnesota's Legacy

All Projects

Showing 1 - 16 of 16 | Export projects
Recipient
University of Minnesota
2016 Fiscal Year Funding Amount
$500,000
Fund Source

These funds are being used to systematically collect data and produce statistically valid estimates of the rate of soil erosion and tracking the adoption of high residue cropping systems in in the 67 counties with greater than 30% land in agricultural row crop production. Designed to establish a long term program in Minnesota to collect data and produce county, watershed, and state wide estimates of soil erosion caused by water and wind along with tracking adoption of conservation measures to address erosion.

Becker
Benton
Big Stone
Blue Earth
Brown
Carver
Chippewa
Chisago
Clay
Cottonwood
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Houston
Isanti
Jackson
Kandiyohi
Kittson
Lac qui Parle
Le Sueur
Lincoln
Lyon
Mahnomen
Recipient
University of Minnesota
2016 Fiscal Year Funding Amount
$500,000
Fund Source

These funds are being used to systematically collect data and produce statistically valid estimates of the rate of soil erosion and tracking the adoption of high residue cropping systems in counties with greater than 30% land in agricultural row crop production. Designed to establish a long term program in Minnesota to collect data and produce county, watershed, and state wide estimates of soil erosion caused by water and wind along with tracking adoption of conservation measures to address erosion.

Becker
Benton
Big Stone
Blue Earth
Brown
Carver
Chippewa
Chisago
Clay
Cottonwood
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Houston
Isanti
Jackson
Kandiyohi
Kittson
Lac qui Parle
Le Sueur
Lincoln
Lyon
Mahnomen
Recipient
Comfort Lake-Forest Lake WD
2017 Fiscal Year Funding Amount
$88,000
Fund Source

Bone Lake and upstream Moody Lake are the headwaters of the Comfort Lake-Forest Lake Watershed District northern flow network, and as such, their water quality sets the stage for downstream waters, particularly Comfort Lake, the Sunrise River, and ultimately Lake St. Croix. This project proposes the implementation of six wetland restorations located along the tributary identified as the single highest source of phosphorus loading to Bone Lake. These wetland restorations are estimated to reduce watershed phosphorus loads to Bone Lake by 50 pounds per year.

Chisago
Washington
Recipient
Browns Creek WD
2017 Fiscal Year Funding Amount
$51,525
Fund Source

The purpose of the project is to target the type and location of riparian vegetation restoration needed to shade three miles of unforested buffer on Brown's Creek, a metro area trout stream impaired for thermal and sediment loading. The project will conduct a riparian shading analysis, cost-benefit analysis, and modeling of restoration scenarios based on field measurements of shade in the unforested buffer of Brown's Creek.

Washington
Recipient
Multiple Local Government Units
2013 Fiscal Year Funding Amount
$1,631,794
Fund Source

Funds are to be used to protect, enhance and restore water quality in lakes, rivers and streams and to protect groundwater and drinking water. Activities include structural and vegetative practices to reduce runoff and retain water on the land, feedlot water quality projects, SSTS abatement grants for low income individuals, and stream bank, stream channel and shoreline protection projects. For the fiscal year 2012, BWSR awarded 12 local governments with funds.

Chisago
Lac qui Parle
Lake of the Woods
McLeod
Mille Lacs
Pennington
Pope
St. Louis
Stearns
Todd
Washington
Winona
Recipient
Washington Conservation District
2017 Fiscal Year Funding Amount
$81,000
Fund Source

The goal of this project is to adapt and expand the existing successful Master Water Stewards program to engage citizens and catalyze clean water projects in suburban, exurban and rural communities of Washington and southern Chisago Counties. As part of this project, 20 citizens' stewards will be recruited and trained to work in partnership with the Washington Conservation District and area watershed management organizations to implement clean water projects in identified priority areas.

Chisago
Washington
Recipient
Comfort Lake-Forest Lake WD
2017 Fiscal Year Funding Amount
$36,000
Fund Source

This project will develop an enhanced street sweeping plan for the City of Forest Lake that optimizes phosphorus removal from increasing sweeping frequency with the cost of additional sweeps. In addition, this project will identify road-specific street sweeping timing and frequency, quantify expected phosphorus load reductions, itemize costs of enhanced street sweeping, and recommend funding options to the City of Forest Lake.

Chisago
Washington
Recipient
Forest Lake, City of
2017 Fiscal Year Funding Amount
$505,000
Fund Source

Forest Lake Area Schools, the Rice Creek Watershed District and the City of Forest Lake have partnered to develop the first phase of a long-term stormwater reuse and education program starting. This project will result in stormwater pond retrofits and construction of new irrigation infrastructure to reduce potable groundwater usage by over 4 million gallons per year. Further, educational curriculum will be developed to integrate the reuse technology and water conservation concepts. Clear Lake is an important regional resource and boasts a very active lake association.

Washington
Recipient
Forest Lake, City of
2018 Fiscal Year Funding Amount
$220,000
Fund Source
Washington
Recipient
Middle St. Croix River WMO
2018 Fiscal Year Funding Amount
$33,440
Fund Source
Washington
Recipient
Middle St. Croix River WMO
2017 Fiscal Year Funding Amount
$58,000
Fund Source

After nearly a decade of intensive targeting, design and installation of water quality improvement practices, Lily Lake has an improving trend in long-term summer total phosphorous concentrations for the first time since monitoring began in 1985. To date, 36 storm water quality improvement projects have reduced 100 pounds of annual phosphorous discharging to Lily Lake.

Washington
Recipient
Browns Creek WD
2017 Fiscal Year Funding Amount
$274,250
Fund Source

Brown's Creek Watershed District and Washington County will work together to retrofit McKusick Road during a 2017 road improvement project. The project will install seven catch basin retrofits with separation devices, and three 40 foot x 5 foot diameter underground water quality tanks to trap sediment and floatables from the roadway.

Washington
Recipient
Middle St. Croix River WMO
2017 Fiscal Year Funding Amount
$63,000
Fund Source

Perro Creek drains directly into the nutrient impaired St. Croix River. This project focuses on landowner outreach, design and installation of up to 10 bioinfiltration best management practices to reduce pollution from 85 acres of urban land draining directly into Perro Creek, then into Lake St. Croix with no water quality treatment. The installation of these practices will not only reduce stormwater volumes, but also the nutrients that are the root cause of the nutrient impairment in Lake St. Croix as well as the stormwater bacteria contributions to Perro Creek.

Washington
Recipient
Comfort Lake-Forest Lake WD
2017 Fiscal Year Funding Amount
$824,000
Fund Source

Forest Lake is one of the top recreational lakes in the metro area and protecting its water quality is a top priority for the Comfort Lake Forest Lake Watershed District. While not currently on the impaired waters list, the water quality of Forest Lake is very near the water quality standard. Shields Lake has been identified as the single largest pollutant contributor to Forest Lake. This project proposes to impound water from a tributary to Shields Lake for golf course irrigation reuse, reducing watershed phosphorus loads to Shields Lake.

Washington
Recipient
Washington County
2017 Fiscal Year Funding Amount
$100,000
Fund Source

The Washington County Department of Public Health and Environment is seeking funds to conduct countywide records catalog and subsequent risk analysis of subsurface sewage treatment systems, or septic systems, in the county. The records catalog will involve the collection, digitization and review of historical permit records from 1972-2004. The risk analysis will utilize information from the historical review, in addition to other pertinent available data.

Washington
Recipient
Yellow Medicine County
2017 Fiscal Year Funding Amount
$20,000
Fund Source

The Yellow Medicine One Watershed One Plan has identified Protecting and Preserving Groundwater Quality and Quantity as one of the three priorities addressed in the Plan. Seven priority sub-watersheds have been identified as priority areas, as well as two townships that have been identified by the Department of Agriculture to have vulnerable groundwater areas. Our goal is to provide 50% cost share to seal 34 abandoned wells that are located in these priority areas.

Lac qui Parle
Lincoln
Lyon
Yellow Medicine