Showing 1 - 7 of 7 | Export projects
Recipient
RESPEC
2012 Fiscal Year Funding Amount
$67,972
Fund Source

This project will construct three watershed framework models built using the Hydrologic Simulation Program FORTRAN. These executable models will simulate hydrology at the 12-digit HUC subbasin scale. An HSPF model will be built for each of the following 8-HUC watersheds: Red Lake River (09020303) and the Clearwater River (09020305).

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
University of Minnesota
2012 Fiscal Year Funding Amount
$175,000
2013 Fiscal Year Funding Amount
$175,000

PROJECT OVERVIEW

Aitkin
Becker
Beltrami
Benton
Carlton
Cass
Clearwater
Cook
Crow Wing
Hubbard
Itasca
Koochiching
Lake
Lake of the Woods
Mahnomen
Marshall
Morrison
Otter Tail
Pennington
Pine
Polk
Red Lake
Roseau
St. Louis
Todd
Wadena
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$99,986
Fund Source

This project will finalize HSPF watershed model construction and complete the calibration/validation process. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval.

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$95,000
Fund Source
The goal of this project is to continue and finalize HSPF watershed model construction and complete the calibration/validation process.
Beltrami
Clearwater
Marshall
Pennington
Polk
Red Lake
Recipient
United States Geological Survey (USGS)
2015 Fiscal Year Funding Amount
$18,375
Fund Source

The study will assess existing phosphorus data records and create a model to explain phosphorus loading into the Red River of the North. Studies have found that the majority of nutrient loading in the stream located in agricultural areas occurs with sediment loading since nutrients are typically bound to sediment particles.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
RESPEC
2017 Fiscal Year Funding Amount
$49,999
Fund Source

The goal of this project is to extend, calibrate, and validate the existing Hydrological Simulation Program – FORTRAN (HSPF) watershed models in the Red Lake River, Thief River, Clearwater River and Red Lake watersheds.

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
RESPEC
2015 Fiscal Year Funding Amount
$100,000
Fund Source
Continue and finalize watershed models using Hydrologic Simulation Program FORTRAN (HSPF) for the Grand Marais Creek and Snake River Watersheds and complete the calibration/validation process.
Marshall
Pennington
Polk
Red Lake