Minnesota's Legacy

All Projects

Showing 1 - 39 of 39 | Export projects
Recipient
Peer Engineering
2014 Fiscal Year Funding Amount
$115,910
Fund Source

Peer Engineering, Inc. (Peer) will evaluate and recommend to MPCA groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration. Superfund staff will assist in the project by providing oversight of contractual requirements and provide technical assistance as needed.

Dakota
Hennepin
Mower
Rice
Washington
Recipient
Braun Intertec
2017 Fiscal Year Funding Amount
$80,687
2018 Fiscal Year Funding Amount
$17,828
Fund Source

This project will complete the installation of four nested wells to the Ambient Groundwater Monitoring Network and relocated one well in the City of Saint Paul. Braun Intertec will coordinate site access and oversee the well installation by a state drilling contractor.

Anoka
Hennepin
Ramsey
Recipient
Metropolitan Council-Environmental Services
2013 Fiscal Year Funding Amount
$405,500
Fund Source

This project will provide condition monitoring and problem investigation monitoring at the following sites.
Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek.
Minnesota River: Tributaries include Eagle Creek,Riley Creek, and Valley Creek tributary to the St. Croix River

Anoka
Benton
Carver
Chisago
Dakota
Hennepin
Isanti
Le Sueur
McLeod
Meeker
Mille Lacs
Morrison
Nicollet
Pine
Ramsey
Renville
Rice
Scott
Sherburne
Sibley
Stearns
Washington
Wright
Recipient
Mower County Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$99,929
Fund Source

This project will place the Cedar River watershed on a sustainable and clearly understood implementation process for comprehensive water management. All people living in the watershed and all groups operating and managing land in the watershed, are responsible stakeholders in the effort. Objectives for this phase of the project include:
1. Develop a comprehensive watershed restoration and protection strategy.
2. Continue development of a more coordinated and comprehensive citizen participation process.

Dodge
Freeborn
Mower
Steele
Recipient
Clearwater Soil and Water Conservation District
2014 Fiscal Year Funding Amount
$19,982
Fund Source

This project will provide the assessment of the chemical, physical, biological, and bacteriological integrity of surface waters.

Clearwater
Recipient
Mower County Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$182,020
Fund Source

This project will build upon existing planning and implementation efforts already taken on in the project area. The collection of existing information will be used to complement water information in support of a more successful and sustainable water quality improvement and protection implementation program. This will be achieved by active civic engagement activities throughout Phase I of this project.

Dodge
Freeborn
Mower
Steele
Recipient
South St. Louis County Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$283,224
Fund Source

This project will provide fiscal resources for South St. Louis County Soil and Water Conservation District (SSLCSWCD) to participate and lead efforts to attain geomorphic data sets, dissolved oxygen assessments, culvert inventory, and civic engagement activities in three major watersheds, Nemadji River, South Lake Superior and St. Louis River. This work is currently being worked on as a part of the MPCA’s Watershed Restoration and Protection Planning efforts.

Carlton
Lake
St. Louis
Recipient
Coon Creek Watershed District
2013 Fiscal Year Funding Amount
$252,200
Fund Source

This project will provide the MPCA, CCWD, and all other stakeholders the information and tools necessary to improve the water quality within Coon Creek Watershed District. The improvements will take place using targeted activities throughout the watershed to reduce the primary biological and chemical stressors. In turn, the reduction of these stressors will help to reduce overall loadings of sediment, turbidity, total phosphorus, and E. coli bacteria.

Anoka
Carver
Dakota
Hennepin
Ramsey
Sherburne
Washington
Wright
Recipient
Vadnais Lake Area Watershed Management Organization (VLAWMO)
2010 Fiscal Year Funding Amount
$40,000
Fund Source

The VLAWMO watershed covers approximately 25 square miles in the northeast metropolitan area in northern Ramsey County and a small portion of Anoka County, Minnesota. It encompasses the City of North Oaks and portions of the Cities of White Bear Lake, Gem Lake, Vadnais Heights, Lino Lakes, and White Bear Township. This project will gather and organize existing data, support the continuation of modeling and TMDL allocations along with an additional stakeholder meeting. It will also provide the completion of a draft and final TMDL report.

Anoka
Ramsey
Recipient
University of Minnesota
2019 Fiscal Year Funding Amount
$116,081
Fund Source

This project continues the total maximum daily load (TMDL) and watershed restoration and protection strategies (WRAPS) process for the Duluth Metropolitan Area (DMA).  The DMA is defined by water, sitting at the juncture of Lake Superior and the St. Louis River Estuary, and surrounded by semi-mountainous terrain. The project serves as a bridge into the next phase of restoration and protection identified by the Duluth Urban Stream TMDLs and WRAPS. In the first phase of community engagement, a collaborating organization was formed to define a framework for the DMA communities.

St. Louis
Recipient
Regents of the University of Minnesota
2016 Fiscal Year Funding Amount
$135,061
2018 Fiscal Year Funding Amount
$49,040
2019 Fiscal Year Funding Amount
$34,240
Fund Source

Minnesota Pollution Control Agency (MPCA) Watershed Pollutant Load Monitoring Network (WPLMN) requests assistance from local partners to collect samples and field data at designated stream monitoring sites for the purpose of assessing water quality and calculating annual pollutant loads.

Lake
St. Louis
Recipient
Lake County Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$225,000
Fund Source

This project will gather watershed data necessary for the development of a comprehensive watershed management plan with parameter-specific thresholds that will maintain or improve water quality for the Kawishiwi Watershed.

Cook
Lake
St. Louis
Recipient
Capitol Region Watershed District
2012 Fiscal Year Funding Amount
$275,000
Fund Source

This project will compile and review previously conducted studies and will prioritize best management practices (BMPs) based on a cost-benefit analysis of their pollutant load reductions and life cycle costs. It will also support the design and construction of BMPs, such as rain gardens and infiltration practices, within the Villa Park subwatershed of the Lake McCarrons watershed.

Ramsey
Recipient
South St Louis Soil & Water Conservation District
2019 Fiscal Year Funding Amount
$146,000
Fund Source

The purpose of this contract is to augment data collection efforts for the St. Louis River (SLR) Watershed Restoration and Protection Strategy (WRAPS) and for four impaired Duluth beaches. For the SLR WRAPS, activities include: attaining datasets for watershed stressors and geomorphic conditions, water quality gap monitoring, and a civic engagement component. Impaired beaches activities include: collection of field observational data, field water chemistry, and water quality samples for analytical analysis.

St. Louis
Recipient
U.S. Army Corps of Engineers (USACE)
2012 Fiscal Year Funding Amount
$163,100
Fund Source

This project will provide a protocol for prioritizing sites in the St. Louis Area of Concern (AOC ) for restoration based on site-specific bioavailability considerations. Despite large data collection efforts focused on sediment chemistry, the extent to which sediment with moderate levels of contamination is available for uptake into biota and therefore contributing to Beneficial Use Impairments (BUI)s is still largely unknown.

St. Louis
Lake
Carlton
Recipient
U.S. Environmental Protection Agency, Great Lakes Restoration Initiative (USEPA-GLRI)
2013 Fiscal Year Funding Amount
$219,668
Fund Source

The St. Louis River Area of Concern (SLRAOC) conservation partners are focused on removing Beneficial Use Impairments (BUI) in the estuary and eventually delisting the SLRAOC. Cooperative efforts between multiple resource agencies and regional stakeholders have identified a host of restoration objectives, developed project support activities, and partially secured funding that includes a state commitment through the Minnesota Clean Water Fund.

Carlton
Lake
St. Louis
Recipient
U.S. Environmental Protection Agency, Great Lakes Restoration Initiative (USEPA-GLRI)
2013 Fiscal Year Funding Amount
$1,112,252
Fund Source

The St. Louis River Area of Concern (SLRAOC) conservation partners are focused on removing Beneficial Use Impairments (BUI) in the estuary and eventually delisting the SLRAOC. Cooperative efforts between multiple resource agencies and regional stakeholders have identified a host of restoration objectives, developed project support activities, and partially secured funding that includes a state commitment through the Minnesota Clean Water Fund.

Carlton
Lake
St. Louis
Recipient
Metropolitan Council
2010 Fiscal Year Funding Amount
$326,500
Fund Source

This project will provide condition monitoring and problem investigation monitoring at the following sites. Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek. Minnesota River: Tributaries include Eagle Creek, Riley Creek, and Willow Creek. St. Croix River: Tributary includes Valley Creek.

Wright
Washington
Stearns
Sibley
Sherburne
Scott
Rice
Renville
Pine
Nicollet
Morrison
Mille Lacs
Meeker
McLeod
Le Sueur
Isanti
Hennepin
Dakota
Chisago
Carver
Benton
Anoka
Recipient
Metropolitan Council Environmental Services
2018 Fiscal Year Funding Amount
$176,657
2019 Fiscal Year Funding Amount
$123,343
Fund Source

The Minnesota Pollution Control Agency’s (MPCA) Watershed Pollutant Load Monitoring Network (WPLMN) forms the core of a long-term program designed to measure and compare regional differences and trends in pollutant loadings from Minnesota’s mainstem rivers and the outlets of major watersheds and subwatersheds draining to these rivers.

Hennepin
Recipient
Mower Soil and Water Conservation District
2019 Fiscal Year Funding Amount
$37,591
Fund Source

This purpose of this project is to evaluate the conditions of eight streams in the Cedar River Watershed and one site on the Wapsipinicon River. Monitoring will take place for two years. Mower Soil and Water Conservation District staff will collect samples following Minnesota Pollution Control Agency (MPCA) Intensive Watershed Monitoring (IWM) sample collection protocols and will organize and review all field and laboratory data, along with field notes and photos.

Dodge
Mower
Recipient
Minnesota Pollution Control Agency
2010 Fiscal Year Funding Amount
$4,432,804
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities.

Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support.

Anoka
Becker
Beltrami
Big Stone
Carver
Cass
Chippewa
Clearwater
Crow Wing
Dakota
Grant
Hennepin
Hubbard
Itasca
Kandiyohi
Koochiching
Lac qui Parle
Lincoln
Lyon
Morrison
Olmsted
Otter Tail
Ramsey
Redwood
Renville
Sherburne
Stevens
Todd
Traverse
Wabasha
Wadena
Washington
Wilkin
Wright
Yellow Medicine
Recipient
Minnesota Pollution Control Agency
2014 Fiscal Year Funding Amount
$297,169
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Pollution Control Agency
2015 Fiscal Year Funding Amount
$287,628
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
North St. Louis River Soil and Water Conservation District
2019 Fiscal Year Funding Amount
$83,141
Fund Source

This St. Louis River Watershed assessment will include the waters of Dempsey Creek, West Two River, St. Louis River, Mud Hen Creek, Embarrass River, West Swan River, Partridge River, Barber Creek, East Swan River, Helen Lake, Pine Lake, Cadotte Lake, Colby Lake, Loon Lake, St. James Pit, Strand Lake, Nichols Lake, Ely Lake, Silver Lake, Elbow Lake, Mashkenode Lake, Carey Lake and Island Lake. These lakes and streams are found throughout the St. Louis River Watershed, which spans parts of St. Louis and Itasca Counties.

Itasca
St. Louis
Recipient
University of Minnesota Natural Resources Research Institute
2014 Fiscal Year Funding Amount
$298,787
Fund Source

Minnesota Clean Water Funds will be used to complete a paleolimological study of the St. Louis River Estuary for the purpose of providing information critical to removing Beneficial Use Impairments in the St. Louis River Area of Concern.  This project will reconstruct the biological (algal load and composition), geochemical (organic and inorganic), sediment, and mercury chronology to identify historical temporal and spatial variations in the St. Louis River Estuary in order to better understand the natural and anthropogenic drivers related to beneficial use impairments for the St.

St. Louis
Recipient
Red River Watershed Management Board
2014 Fiscal Year Funding Amount
$100,000
Fund Source

The goal of this project is to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data for the benefit of water quality in the Red River Basin.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Red River Watershed Management Board
2015 Fiscal Year Funding Amount
$100,000
Fund Source

The goal of this project is to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data for the benefit of water quality in the Red River Basin.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Buffalo-Red River Watershed District
2016 Fiscal Year Funding Amount
$19,860
Fund Source

The purpose of this project is to improve understanding of primary productivity in the Red River and the diversity and population structure of the algal communities occurring along the river system. This will be accomplished through taxonomic identification of periphyton and phytoplankton assemblages necessary for characterizing responses to nutrient gradients along the Red River of the North.

Becker
Beltrami
Clay
Clearwater
Douglas
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Pope
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Red River Watershed Management Board
2012 Fiscal Year Funding Amount
$200,000
Fund Source

MN Legislative Clean Water Fund funding to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data all for the benefit of water quality in the Red River Basin.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Kittson
Lake of the Woods
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Minnesota Department of Natural Resources
2013 Fiscal Year Funding Amount
$170,601
Fund Source

The objective of this sampling plan is to quantify the inputs and outputs of methyl-mercury in the St. Louis River. Mercury can be bound to organic carbon or suspended solids; therefore, it is necessary to determine loadings of them as well. To get loadings, this sampling plan includes event and base flow monitoring at key tributaries to the St. Louis River and at stations within the St. Louis River.

Aitkin
Carlton
Lake
St. Louis
Recipient
Minnesota Department of Natural Resources
2013 Fiscal Year Funding Amount
$3,903
2014 Fiscal Year Funding Amount
$4,846
Fund Source

The goal of this project is to provide drilling services for the Sentinel Lakes Groundwater/Surface Water Interaction Network. The three new wells will be used for monitoring the interaction between groundwater and surface water in Lakes Shaokatan and Bear Head. Groundwater/lake water interactions are not well understood, and in order to produce accurate and useful Total Maximum Daily Load watershed investigations and impairment remediations, the MPCA must understand how groundwater affects lake water quality.

Lincoln
St. Louis
Recipient
South St Louis Soil & Water Conservation District
2017 Fiscal Year Funding Amount
$124,605
Fund Source

This project will augment data collection efforts for the Lake Superior South, Cloquet, St. Louis River, and Duluth Urban Watershed Restoration and Protection Strategy (WRAPS) projects. Activities include: attaining datasets for watershed stressors and geomorphic conditions, water quality gap monitoring, and civic engagement. The Minnesota Pollution Control Agency has been collaborating with the South St. Louis Soil and Water Conservation District (SWCD) to complete WRAPS related technical and civic engagement work in the Lake Superior basin for the past five years.

Lake
St. Louis
Recipient
South St. Louis River Soil and Water Conservation District
2019 Fiscal Year Funding Amount
$27,687
Fund Source

This project will collect water quality data in the St. Louis River watershed as part of the 10-year Watershed Restoration and Protection Strategy (WRAPS) cycle for Minnesota waters. South St. Louis Soil and Water Conservation District (SSLSWCD) staff will conduct all monitoring in accordance with Minnesota Pollution Control Agency (MPCA) Intensive Watershed Monitoring (IWM) standard operating procedures. The SSLSSWCD has extensive experience in stream sampling techniques, including dissolved oxygen, pH, specific conductance, temperature, total suspended solids, nutrients, E.

Carlton
St. Louis
Recipient
University of Minnesota
2011 Fiscal Year Funding Amount
$16,283
Fund Source

This project will provide complementary (same year) physical and chemical data sets for three MPCA prioritized lakes in NE Minnesota to incorporate into the overall State database for MPCA assessment purposes as well as research purposes.

Aitkin
Carlton
Itasca
Lake
St. Louis
Recipient
Itasca Community College
2010 Fiscal Year Funding Amount
$117,272
Fund Source

This assessment will be performed using scientific volunteers, will build capacity at a technical training program at Itasca Community College (ICC), and will provide MPCA with answers providing a reasonable expectation for water quality in this under-studied region of Minnesota.

Itasca
Koochiching
St. Louis
Recipient
Becker County Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$19,176
Fund Source

This project involves monitoring three data deficient lakes in the Crow Wing River Watershed and one stream site at the inlet to White Earth Lake. The data deficient lakes were on the MPCA Targeted watershed list. After getting the required assessment dataset for these lakes, all targeted lakes in Becker County will be completed for this assessment cycle. The stream site is a site that the White Earth Lake Association and the Becker Coalition of Lake Associations (COLA) will monitor. It is the inlet to White Earth Lake.

Becker
Cass
Clay
Clearwater
Crow Wing
Hubbard
Mahnomen
Morrison
Norman
Otter Tail
Polk
Todd
Wadena
Recipient
Norman County Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$50,364
Fund Source

This project will obtain lab and field data for waterbodies within the Wild Rice Watershed, to meet surface water assessment goals. Data will continue to be collected further upstream of some 2008 sites and enhance current assessment datasets. Some new tributaries, that lack assessment data, will also be monitored. The project goal is to complete the datasets necessary for the assessment of Aquatic Recreation Use for twelve streams in the Wild Rice Watershed.

Becker
Clay
Clearwater
Mahnomen
Norman
Polk
Recipient
Pioneer-Sarah Creek Watershed Management Commission
2010 Fiscal Year Funding Amount
$65,825
Fund Source

The Pioneer-Sarah Creek Watershed Assessment project will complete a condition assessment for all currently unassessed or partially assessed (i.e., incomplete datasets) lakes and streams throughout the Pioneer-Sarah Creek (PSC) watershed (South Fork of Crow River; Hennepin County).

Hennepin
Recipient
Emmons and Olivier Resources, Inc.
2011 Fiscal Year Funding Amount
$95,999
Fund Source

This project will support the monitoring of reaches where there are data gaps, incorporate new data and relevant data, continue identification of pollutant sources, complete load duration curves, coordinate and encourage participation in stakeholder meetings. The information gathered during Phase IIB will be utilized towards the development of a Draft Restoration (TMDL) and Protection Plan (Plan).

Aitkin
Anoka
Benton
Carver
Chisago
Crow Wing
Dakota
Douglas
Hennepin
Isanti
Kanabec
Kandiyohi
Le Sueur
McLeod
Meeker
Mille Lacs
Morrison
Nicollet
Pope
Ramsey
Renville
Scott
Sherburne
Sibley
Stearns
Todd
Wright