Minnesota's Legacy

All Projects

Showing 1 - 33 of 33 | Export projects
Recipient
University of Minnesota
2016 Fiscal Year Funding Amount
$500,000
Fund Source

These funds are being used to systematically collect data and produce statistically valid estimates of the rate of soil erosion and tracking the adoption of high residue cropping systems in in the 67 counties with greater than 30% land in agricultural row crop production. Designed to establish a long term program in Minnesota to collect data and produce county, watershed, and state wide estimates of soil erosion caused by water and wind along with tracking adoption of conservation measures to address erosion.

Becker
Benton
Big Stone
Blue Earth
Brown
Carver
Chippewa
Chisago
Clay
Cottonwood
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Houston
Isanti
Jackson
Kandiyohi
Kittson
Lac qui Parle
Le Sueur
Lincoln
Lyon
Mahnomen
Recipient
University of Minnesota
2016 Fiscal Year Funding Amount
$500,000
Fund Source

These funds are being used to systematically collect data and produce statistically valid estimates of the rate of soil erosion and tracking the adoption of high residue cropping systems in counties with greater than 30% land in agricultural row crop production. Designed to establish a long term program in Minnesota to collect data and produce county, watershed, and state wide estimates of soil erosion caused by water and wind along with tracking adoption of conservation measures to address erosion.

Becker
Benton
Big Stone
Blue Earth
Brown
Carver
Chippewa
Chisago
Clay
Cottonwood
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Houston
Isanti
Jackson
Kandiyohi
Kittson
Lac qui Parle
Le Sueur
Lincoln
Lyon
Mahnomen
Recipient
Area 1 - Red River Valley Conservation Service Area
2014 Fiscal Year Funding Amount
$250,000
Fund Source

The Accelerated Water Quality Project Implementation Program will increase the connection between landowners, local government units and the landscape to accelerate efforts addressing non-point source loading to surface waters throughout the Red River Valley Conservation Service Area.

Becker
Beltrami
Clay
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Traverse
Wilkin
Recipient
Becker SWCD
2014 Fiscal Year Funding Amount
$40,710
Fund Source

The Becker County Drainage Ditch Inventory and Inspection Project is a collaborative, multifaceted approach to develop a GIS-based drainage ditch inventory database system, inventory the current conditions of judicial ditches and adjacent land, and target and prioritize portions of each ditch system for restorative or protective measures.

Becker
Recipient
Becker SWCD
2016 Fiscal Year Funding Amount
$254,897
Fund Source

With over 500 public water lakes in Becker County, we are blessed with abundant and diverse lake resources that, like those of much of lake country, are at risk of degradation due to increasing development pressures, redevelopment of non-conforming lots, rising stormwater runoff and land use changes within their watersheds.

Becker
Recipient
Becker SWCD
2018 Fiscal Year Funding Amount
$376,250
Fund Source
Becker
Recipient
Buffalo - Red River Watershed District
2012 Fiscal Year Funding Amount
$57,818
Fund Source

Multiple water courses in the Buffalo River - Red River Watershed District are impaired for turbidity. These waterways include the Red River of the North, Wolverton Creek, Deerhorn Creek, Stoney Creek, South Branch Buffalo River, and the main stem of the Buffalo River. This project will provide a means of prioritizing areas of the watershed to implement conservation practices to reduce overland runoff contaminant loadings contributing to water quality impairments.

Becker
Clay
Otter Tail
Wilkin
Recipient
Becker SWCD
2018 Fiscal Year Funding Amount
$398,000
Fund Source
Becker
Recipient
Becker Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$42,160
Fund Source

Erosion is a serious water quality issue found throughout the Buffalo-Red River Watersheds rivers and tributaries. Excessive erosion occurs in the beach ridge area where the land naturally has excessive slopes. The beach ridge area consists of sand and gravel deposited by wave action along the shoreline of Lake Agassiz at various times as the lake level rose and fell. The sand and gravel soils, combined with the relatively steep slopes of the area can be susceptible to erosion.

Becker
Recipient
Becker Soil & Water Conservation District
2013 Fiscal Year Funding Amount
$398,800
Fund Source

During the Minnesota Pollution Control Agency's 2011 lake assessment process nine shallow lakes located in the Buffalo-Red River Watershed in western Becker County were determined to be impaired for excessive nutrients primarily from agricultural runoff. Located in a heavy agricultural production area, this project will address agricultural stormwater runoff by installing 50 water and sediment control basins and 20 acres of vegetative buffer strips adjacent to the lakes. Fifteen landowners with a potential for 26 water and sediment control basin sites have already been identified.

Becker
Recipient
BWSR with Morrison County SWCD
2015 Fiscal Year Funding Amount
$1,200,000
Fund Source

This phase protected, under easement, 946 acres (130% of the goal of 720 acres)  of high quality habitat a for fish, game, and wildlife.

Aitkin
Becker
Beltrami
Carlton
Cass
Clearwater
Crow Wing
Hubbard
Itasca
Morrison
St. Louis
Wadena
Recipient
Becker SWCD
2011 Fiscal Year Funding Amount
$57,653
Fund Source

The Floyd chain of lakes is of economic significance to the Detroit Lakes region providing great game fishing, boating and other summer and winter recreational opportunities. Decades of nutrient loading into North Floyd from the surrounding Campbell Creek area has led to a decrease in water quality. The same is true for the Buffalo River portion of this project area.

Becker
Recipient
Buffalo-Red River Watershed District
2011 Fiscal Year Funding Amount
$105,408
Fund Source

A partnership of local, state and federal organizations has used multiple funding sources to target nonpoint pollution reduction efforts to the Hay Creek Watershed, a 24-square-mile area in Becker County that features several high- quality lakes. Clean Water Legacy grants were received in 2008 by the Buffalo-Red River Watershed District and in 2011 by the Becker SWCD. The grants leveraged both local and federal dollars, and it built on previous efforts to identify locations where conservation projects could provide the greatest benefits for water quality and wildlife habitat.

Becker
Recipient
Becker Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$61,648
Fund Source

Bejou, Shoe and Dahlberg lakes are located in the upper reaches of one of the most popular fisheries in the region, the Cormorant Lakes chain.
Water quality issues impacting Bejou Lake were identified through the use of aerial photography. Results determined that a significant amount of sediment was being deposited into Bejou Lake from the 84 acre adjacent watershed. Several areas where water, sediment and erosion control basins could greatly reduce the amounts of sediments being delivered to the lake were identified.

Becker
Recipient
Cormorant Lakes Watershed District
2013 Fiscal Year Funding Amount
$142,900
Fund Source

In an attempt to protect existing exceptional lake and wetland resources, the Cormorant Lakes Watershed District (CLWD) is proactively implementing erosion and sediment control practices. At the present time, since none of the lakes are impaired but development pressure is increasing, a non-degradation strategy is necessary to ensure the desired long-term water quality in the District's lakes.

Becker
Recipient
Becker Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$16,395
Fund Source

This project is concentrated in the Hay Creek Watershed, a 24-square-mile area in Becker County that features several high-quality lakes including Stinking Lake, valued for high-quality waterfowl habitat and flood water storage. Protecting the lake has been a local priority.

Becker
Recipient
Otter Tail, East SWCD
2017 Fiscal Year Funding Amount
$58,000
Fund Source

The purpose of this project is to identify effective irrigation and nutrient management best management practices and technologies and the barriers that prevent irrigators, producers, and other agricultural partners from adopting them in Otter Tail County. The primary goal is to reduce nitrate in areas where groundwater is susceptible to contamination as mapped by The Minnesota Department of Health by identifying effective BMPs and addressing the barriers to their adoption.

Becker
Douglas
Otter Tail
Todd
Wadena
Recipient
BWSR
2010 Fiscal Year Funding Amount
$1,000,000

Enrollment of private lands in conservation programs can provide important natural resource and other public benefits by taking the lands out of production so that they can provide various wildlife and ecological benefits. This appropriation is enabling Minnesota's Board of Soil and Water Resources to provide grants to local soil and water conservation districts for employment of technical staff to assist private landowners in implementing conservation programs.

Becker
Big Stone
Chippewa
Chisago
Clay
Cottonwood
Recipient
Otter Tail, East SWCD
2017 Fiscal Year Funding Amount
$471,000
Fund Source

The purpose of this project is to develop a detailed tool that can be used in all watersheds within the Otter Tail and Becker counties to prioritize, target, and measure implementation practices at the field scale. The PTM App will significantly increase the targeting capabilities in Otter Tail and Becker Counties. The Watershed Restoration and Protection Strategy has not been completed for Otter Tail County, yet, and the PTM App will be able to assist targeting and prioritizing when those documents are created.

Becker
Otter Tail
Recipient
Red River Watershed Mgmt Board
2014 Fiscal Year Funding Amount
$235,250
Fund Source

The Prioritization, Targeting, and Measuring Water Quality Improvement Application (PTMA) connects the general qualitative strategies in a Total Maximum Daily Load (TMDL) and Watershed Restoration and Protection (WRAP) and the identification of implementable on-the-ground Best Management Practices (BMPs). Leveraging geospatial data from the International Water Institute this application will be developed for two pilot areas within the Red River Basin.

Becker
Cass
Clay
Grant
Mahnomen
Norman
Otter Tail
Traverse
Recipient
Buffalo-Red River WD
2017 Fiscal Year Funding Amount
$168,000
Fund Source

This project will result in the development of three critical pieces of information. They include: 1. Development of restoration and protection strategies for all waterbodies in the district relative to the State's Non-point Source Funding plan 2. Use of PTMApp to tie the WRAPs implementation tables from the Buffalo and Red River Watersheds to targeted on-the-ground projects and practices that will provide measurable water quality improvements, and 3.

Becker
Clay
Otter Tail
Wilkin
Recipient
Otter Tail, West SWCD
2017 Fiscal Year Funding Amount
$54,800
Fund Source

Realizing the need for increased technical capacity in the field offices, the Becker, East Otter Tail and West Otter Tail Soil and Water Conservation Districts have developed an agreement that will increase technical capacity while minimizing costs to each district. The first step was taken in this agreement through the recent hire of a shared engineer. Currently, minimal survey grade equipment is owned by the districts. This grant will be used to purchase an integrated survey system.

Becker
Otter Tail
Recipient
Red River Watershed Management Board
2012 Fiscal Year Funding Amount
$194,490
Fund Source

This project will provide land and water managers in the Red River Basin with data and online tools to prioritize actions on the landscape that achieve water quality objectives identified in local and state plans. This will help identify strategically important locations for implementing erosion control and water management practices. Standardized watershed-based data products will be integrated into a web-based planning tool which will be added to the Red River Basin Decision Information Network (RRBDIN) being developed as part of the Red River Watershed Feasibility Study.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Itasca
Kittson
Koochiching
Lake of the Woods
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Red River Watershed Mgmt Board
2014 Fiscal Year Funding Amount
$30,636
Fund Source

As part of the FY 2012 funding cycle, the Board of Water and Soil Resources granted funds for development of the Water Quality Decision Support Application (WQDSA). The WQDSA will provide land and water managers with geospatial data and online tools to prioritize, market, and implement actions on the landscape to achieve water quality objectives identified in local and state water plans and to ensure that public funding decisions are strategic and defensible.

Becker
Clay
Mahnomen
Norman
Polk
Recipient
Pelican River Watershed District
2010 Fiscal Year Funding Amount
$250,000
Fund Source

The Rice Lake Wetland Nutrient Reduction Project will provide nutrient reductions to downstream recreational water bodies by restoring the Rice Lake Wetland from its current area of 434 acres to pre-ditched water levels of approximately 896 acres.

Becker
Recipient
Becker County
2016 Fiscal Year Funding Amount
$75,000
Fund Source

An effective regulatory program is key to the successful implementation of local land use and water management plans. Yet, county, watershed, and other state, tribal, and local agencies charged with enforcement and permit review often work in silos and infrequently coordinate with each other or share information. This leads to higher enforcement costs, conflicts between agencies, redundancy of inspections, property owner frustration, and reinforces negative stereotypes of regulatory agencies.

Becker
Recipient
Becker SWCD
2015 Fiscal Year Funding Amount
$257,000
Fund Source

The South Branch Wild Rice Sediment Reduction Project will implement 45 erosion control structures and 40 acres of filter strips to reduce sediment loading to the South Branch of the Wild Rice River in Becker County. Sediment leaving the project area contributes to water quality impairments downstream where Total Suspended Solids (TSS) are affecting aquatic life and aquatic recreation. This project is projected to reduce sediment loads leaving the project area by 26% and reduce TSS in the Lower Wild Rice River by 7%.

Becker
Recipient
Becker County
2010 Fiscal Year Funding Amount
$167,000
Fund Source

Successful long-term treatment of sewage depends on a system capable of providing adequate treatment and effective on-going operation and maintenance. Clean Water Fund Subsurface Sewage Treatment System (SSTS) Program Enhancement and Inventory funds are to be used by counties to augment available funding dedicated to SSTS ordinance

Becker
Recipient
Becker SWCD
2019 Fiscal Year Funding Amount
$796,061
Fund Source

This project strives to continue progress towards the sediment and nutrient reduction goals for the Buffalo River. Specific targeted practices and quantities include Water and Sediment Control Basins (110), Grade Stabilizations (7), Grassed Waterways (10), Critical Area Plantings (12), Filter Strips (45 ac.), Cover Crops (2,500 ac/year), Rotational Grazing/Use Exclusion (320 ac), Wetland Restoration (86 ac).

Becker
Recipient
Buffalo-Red River Watershed District
2013 Fiscal Year Funding Amount
$336,860
Fund Source

Phase II of the Upper South Branch Project will continue a FY2011 CWF project with the strategic implementation of conservation practices within the Upper South Branch of the Buffalo River watershed. This second phase will result in approximately 305 acres of new filter strips, 50 side inlet sediment control structures, and 8 sediment control basins which will reduce sediment loading to the stream by 4,700 tons/year and phosphorus by 9,700 pounds/year.

Becker
Clay
Otter Tail
Wilkin
Recipient
Becker SWCD
2017 Fiscal Year Funding Amount
$328,159
Fund Source

The Upper Buffalo River Sediment Reduction Project area lies in the first major land use transition within the buffalo's flowage, where intact forests and modestly developed lakes give way to altered hydrology and tilled fields of highly productive soils near the top of the Red River Basin. This abrupt change in land use within the watershed is directly linked to stream impairments within the project area.

Becker
Recipient
Becker SWCD
2015 Fiscal Year Funding Amount
$398,000
Fund Source

A joint effort of Becker and Clay Soil and Water Conservation District, the Buffalo Red Shallow Lakes and Mainstem Improvement Strategy will reduce nutrient and sediment delivery to 12 impaired lakes and impaired reaches of the Buffalo River through a targeted and prioritized approach to the implementation of Best Management Practices (BMPs). Numerous models have been combined with local knowledge to identify chief sources of constituents in the watershed and to isolate and prioritize implementation sites demonstrating the most significant gains in water quality.

Becker
Clay
2013 Fiscal Year Funding Amount
$333,590
Fund Source

The Red River is impaired for turbidity. The level of turbidity is a significant factor in the cost of treatment of drinking water by the City of Moorhead. This water quality improvement project involves the retrofit of Clay County Ditches 9, 32, and 33 just south of the city. The project involves the installation of an estimated 87 side inlet sediment controls and 35 acres of buffer strips. All three of these ditch systems with over 16 miles of County Ditch will be treated for sediment and erosion control with the installation of conservation practices.

Becker
Clay
Otter Tail
Wilkin