Minnesota's Legacy

All Projects

Showing 1 - 37 of 37 | Export projects
Recipient
Peer Engineering
2014 Fiscal Year Funding Amount
$115,910
Fund Source

Peer Engineering, Inc. (Peer) will evaluate and recommend to MPCA groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration. Superfund staff will assist in the project by providing oversight of contractual requirements and provide technical assistance as needed.

Dakota
Hennepin
Mower
Rice
Washington
Recipient
Saint Cloud, City of
2014 Fiscal Year Funding Amount
$35,507
Fund Source

The St. Cloud Waste Water Treatment Facility (SCWWTF) is currently conducting long term planning for future biosolids management. The most likely path forward includes dewatering of the digested biosolids, which will produce a supernatant stream with significant phosphorus and ammonia loads that would be returned to the liquids treatment portion of the WWTF. Returning these nutrient loads to the liquids train would result in increases to effluent concentrations, increases in power consumption, or both.

Stearns
Recipient
Tetra Tech
2017 Fiscal Year Funding Amount
$80,038
Fund Source

This project will conduct a 2017 revision of the South Fork Crow River, North Fork Crow River and Sauk River Watershed Hydrological Simulation Program FORTRAN (HSPF) models and review of the Pine River Watershed HSPF model.

Aitkin
Carver
Cass
Crow Wing
Douglas
Hennepin
Hubbard
Kandiyohi
McLeod
Meeker
Pope
Renville
Sibley
Stearns
Todd
Wright
Recipient
University of Minnesota
2011 Fiscal Year Funding Amount
$33,414
Fund Source

This project will identify and compile existing nitrate data from groundwaters and surface waters in the Lower Mississippi Basin (LMB) generally and focus on the Root River Watershed. The purpose is to investigate the quantity and quality of existing nitrate data, and to organize it for use in comprehensive watershed strategy development (including assessment, TMDL computation and identification and study of nitrate sources and delivery mechanisms).

Dodge
Fillmore
Houston
Mower
Olmsted
Winona
Recipient
RESPEC
2012 Fiscal Year Funding Amount
$49,996
Fund Source

This project will finalize HSPF watershed model construction by incorporating internal phosphorus loading in modeled lakes, run a suite of implementation scenarios and generate a GenScn project containing model output. The consultant will produce HSPF watershed models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will deliver all modeling files for baseline and implementation scenarios and provide a GenScn project containing model output.

Becker
Carver
Cass
Clearwater
Crow Wing
Douglas
Hennepin
Hubbard
Kandiyohi
McLeod
Meeker
Morrison
Otter Tail
Pope
Renville
Sibley
Stearns
Todd
Wadena
Wright
Recipient
Whitewater Watershed Project Joint Powers Board
2012 Fiscal Year Funding Amount
$158,328
2013 Fiscal Year Funding Amount
$83,000
Fund Source

This project will provide Agency staff, local partners and the citizen volunteers with a framework for building local capacity to design civic engagement and communication / outreach efforts. This will contribute to meaningful and sustained public participation in surface water protection and restoration activities throughout the watershed. MPCA staff, local partners and citizen volunteers will also be able to integrate the results of the biophysical and community assessment into strategies for improving water bodies on the MN 303d List of Impaired Waters

Olmsted
Wabasha
Recipient
Southeast Minnesota Water Resources Board-Winona State University
2012 Fiscal Year Funding Amount
$80,737
Fund Source

This project will build network and the skill set of local resource professionals to do effective civic engagement work for water restoration and protection in Southeast Minnesota. The cohort will be administered through the Southeast Minnesota Water Resources Board (SE MN WRB) which is an area wide Joint Powers Board (JPB) established to help improve and protect the water resources of the area through coordinating local water planning efforts. This JPB has successfully administered water quality grants in the past that have positively impacted the water resources of this region.

Blue Earth
Dakota
Dodge
Fillmore
Freeborn
Goodhue
Houston
Le Sueur
Mower
Olmsted
Rice
Scott
Steele
Wabasha
Waseca
Washington
Winona
Recipient
Emmons & Olivier Resources
2013 Fiscal Year Funding Amount
$99,355
Fund Source

This project will complete a pollutant source identification and subwatershed information report and support the development of a Draft Restoration and Protection Plan (RAPP). It will also support the devlopment of a Implementation Plan that will identify target areas for BMP implementation for bacteria reductions.

Anoka
Benton
Carver
Crow Wing
Dakota
Douglas
Hennepin
Kandiyohi
McLeod
Meeker
Mille Lacs
Morrison
Pope
Ramsey
Sherburne
Sibley
Stearns
Todd
Washington
Wright
Recipient
Wenck Associates, Inc.
2013 Fiscal Year Funding Amount
$1,879
Fund Source

This project will support the completion of a final draft Total Maximum Daily Load (TMDL) document for the Osakis, Smith and Faille Lakes TMDL and the submittal to EPA for final approval.

Douglas
Meeker
Morrison
Pope
Stearns
Todd
Recipient
Sauk River Watershed Ditrict
2011 Fiscal Year Funding Amount
$40,000
Fund Source

This project will educate the local residents of the importance of groundwater protection and provide financial assistance to those who need to properly abandon their unused well. This project will also support the upgrade of nonconforming sewage treatment systems to reduce nutrient contributions to groundwater and surface water through groundwater permeation.

Stearns
Recipient
Sauk River Watershed District
2011 Fiscal Year Funding Amount
$235,000
Fund Source

This project will address stormwater runoff concerns and erosion issues along the Sauk River.

Stearns
Recipient
Sauk River Watershed District
2011 Fiscal Year Funding Amount
$86,542
Fund Source

This project will continue the restoration of Osakis Lake and protect the water quality of the Sauk River by addressing stormwater runoff from urban and rural areas. Activities include assisting eight landowners in designing and funding their shoreland restoration and rain garden projects.

Stearns
Recipient
Port Authority of Winona
2015 Fiscal Year Funding Amount
$41,324
Fund Source

The goal of this protect is to protect the water quality of the Mississippi River at Winona, MN through the installation of a downtown Winona parking lot rain garden.

Winona
Recipient
Sauk River Watershed District
2015 Fiscal Year Funding Amount
$31,579
Fund Source

This grant will cover all components of water chemistry sampling for pollutant load monitoring at four sites. Of those four sites, two of them are subwatershed sites that will be monitored seasonally and two of them are basin/major watershed sites that will be monitored year round. The Monitoring Coordinator for the Sauk River Watershed District will be responsible for sample collection, data management tasks, attending weekly call in meetings and will coordinate additional help from other staff members and/or interns if needed.

Stearns
Recipient
RESPEC
2011 Fiscal Year Funding Amount
$96,618
Fund Source

This project will support construction of three watershed framework models built using the Hydrologic Simulation Program FORTRAN (HSPF). These executable models will simulate hydrology at the subbasin scale. An HSPF model will be built for each of three major watersheds: the Crow River/North Fork Crow River, the South Fork Crow River, and the Sauk River.

Carver
Douglas
Hennepin
Kandiyohi
McLeod
Meeker
Morrison
Pope
Renville
Sibley
Stearns
Todd
Wright
Recipient
RESPEC
2011 Fiscal Year Funding Amount
$149,677
Fund Source

This project will finalize HSPF watershed model construction and complete the calibration/validation process for the following three watersheds: North Fork Crow River, South Fork Crow River, and Sauk River.

Carver
Douglas
Hennepin
Kandiyohi
McLeod
Meeker
Morrison
Pope
Renville
Sibley
Stearns
Todd
Wright
Recipient
Sauk River Watershed District
2012 Fiscal Year Funding Amount
$65,000
Fund Source

This Sauk River Watershed District project will conduct the Whitney Park river clean-up, adopt a river program and other community events as part of their healthy living programs; will collaborate with the city of St. Cloud to install a rain garden demonstration site at Whitney Park; use local radio and public television stations to promote the District’s “neighborhood rain garden initiative” and other incentive programs.

Todd
Stearns
Pope
Morrison
Meeker
Douglas
Recipient
Emmons & Olivier Resources (EOR)
2013 Fiscal Year Funding Amount
$119,888
Fund Source

This project will build a working watershed SWAT model that can readily be used by the MPCA to provide information to support conventional parameter TMDLs and to identify critical areas for BMP installation/evaluation that can be supported by the efforts of the local Farmer Led Council as well as other land owners within the Mississippi River-Winona watershed.

Olmsted
Wabasha
Winona
Recipient
Emmons & Oliver Resources (EOR)
2014 Fiscal Year Funding Amount
$57,955
Fund Source

This project will address Step 2b in the Watershed approach process and computation of TMDLS for those impaired waters determined to be in need of them.

Olmsted
Wabasha
Winona
Recipient
Emmons & Olivier Resources Inc
2019 Fiscal Year Funding Amount
$74,089
Fund Source

This project is for a contract with Emmons & Olivier Resources Inc to develop Total Maximum Daily Loads (TMDLs; a federal clean Water Act requirement) and a Watershed Restoration and Protection Strategy (WRAPS) report for the for Mississippi River - LaCrescent and Winnebago River watersheds.

Faribault
Houston
Winona
Recipient
Mower Soil and Water Conservation District
2019 Fiscal Year Funding Amount
$37,591
Fund Source

This purpose of this project is to evaluate the conditions of eight streams in the Cedar River Watershed and one site on the Wapsipinicon River. Monitoring will take place for two years. Mower Soil and Water Conservation District staff will collect samples following Minnesota Pollution Control Agency (MPCA) Intensive Watershed Monitoring (IWM) sample collection protocols and will organize and review all field and laboratory data, along with field notes and photos.

Dodge
Mower
Recipient
Minnesota Pollution Control Agency
2010 Fiscal Year Funding Amount
$4,432,804
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities.

Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support.

Anoka
Becker
Beltrami
Big Stone
Carver
Cass
Chippewa
Clearwater
Crow Wing
Dakota
Grant
Hennepin
Hubbard
Itasca
Kandiyohi
Koochiching
Lac qui Parle
Lincoln
Lyon
Morrison
Olmsted
Otter Tail
Ramsey
Redwood
Renville
Sherburne
Stevens
Todd
Traverse
Wabasha
Wadena
Washington
Wilkin
Wright
Yellow Medicine
Recipient
Minnesota Pollution Control Agency
2014 Fiscal Year Funding Amount
$297,169
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Pollution Control Agency
2015 Fiscal Year Funding Amount
$287,628
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Prior Lake-Spring Lake Watershed District
2015 Fiscal Year Funding Amount
$128,522
Fund Source
Regional public projects that are the focus of the proposed project include: Infiltration areas and a sedimentation pond enhancement in subwatersheds N3/N4; Parking lot storm drain rain gardens and a sedimentation pond enlargement in subwatersheds N5/N6; An infiltration area and a sedimentation pond enhancement in subwatersheds S9/S11; Ditch checks along Highway 13 in subwatershed 10.
Scott
Recipient
Sauk River Watershed District
2018 Fiscal Year Funding Amount
$54,996
Fund Source

The Sauk River Watershed District (SRWD) shall conduct water quality sampling for the Sauk River and tributary sites, as well as several lakes, for Cycle 2 of the Intensive Watershed Monitoring (IWM) during 2018 and 2019. Field monitoring will be completed at 14 stream locations and 9 lakes designated by the Minnesota Pollution Control Agency.
Data management will also be completed by the SRWD, including entering and submitting all data to Canvas and compiling all photos, calibration logs and other documents as requested.

Stearns
Todd
Recipient
Emmons & Olivier Resources (EOR)
2014 Fiscal Year Funding Amount
$41,783
Fund Source
The goal of this project is the development of a phosphorus TMDL for the eleven impaired lakes in the Sauk River Watershed.
Stearns
Recipient
Sauk River Watershed District
2011 Fiscal Year Funding Amount
$61,540
Fund Source

This project will complete an assessment of watershed lakes and streams. The assessment will include biological and stressor id analysis, which will support a summary report on lake conditions and protection strategies for lakes included in this watershed study.

Douglas
Meeker
Morrison
Pope
Stearns
Todd
Recipient
Sauk River Watershed District
2016 Fiscal Year Funding Amount
$48,793
Fund Source

The project goal is to conduct water chemistry monitoring at one subwatershed site, one basin site, and one major watershed site in 2016 and 2017 based on flow conditions, targeting runoff events using protocols defined in the Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedures and Guidance. The data collected will be submitted to the Minnesota Pollution Control Agency (MPCA) and used in the FLUX32 model for calculating pollutant loads.

Stearns
Recipient
LimnoTech
2014 Fiscal Year Funding Amount
$29,932
Fund Source
The goal of this project is the continued development of an overall strategy for reduction of turbidity/TSS, with sets of sediment reduction initiatives and actions for various sources, to address the Minnesota River Turbidity TMDL and the South Metro Mississippi River TSS TMDL. The overall strategy will be used to help establish a path towards achieving the required reductions of turbidity/TSS.
Aitkin
Anoka
Becker
Beltrami
Benton
Big Stone
Blue Earth
Brown
Carlton
Cass
Chippewa
Chisago
Clearwater
Cottonwood
Crow Wing
Dakota
Douglas
Faribault
Freeborn
Goodhue
Grant
Hennepin
Hubbard
Isanti
Itasca
Recipient
Minnesota Department of Agriculture
2019 Fiscal Year Funding Amount
$25,000
Fund Source

The purpose of this effort is to create an educational video that will “bring to life” geo-scientific information related to groundwater movement in southeast Minnesota. This video will be used by the Minnesota Pollution Control Agency (MPCA), Minnesota Department of Agriculture (MDA) and other regional partners to help explain the local geology and related groundwater movement. It is anticipated that the video will be used at meetings and other events related to water resource management and natural resource issues. In addition, three stand alone high resolution graphics will be created.

Dakota
Dodge
Fillmore
Goodhue
Houston
Olmsted
Rice
Wabasha
Winona
Recipient
Fillmore County
2014 Fiscal Year Funding Amount
$56,717
Fund Source

The goal of this project is to investigate nitrate transport and the sources of nitrate in karst for more effective implementation of best management practices that will reduce nitrate concentrations in ground and surface water.

Dodge
Fillmore
Houston
Mower
Olmsted
Winona
Recipient
RESPEC
2018 Fiscal Year Funding Amount
$15,098
Fund Source

A contractor with knowledge of Site Specific Standard development will respond to U.S. Environmental Protection Agency (EPA) questions and concerns regarding attainability of standards based on the BATHTUB model data. In addition, they will review technical memorandums developed by Minnesota Pollution Control Agency (MPCA) on aquatic life and aquatic recreational standard attainability.

Douglas
Meeker
Morrison
Pope
Stearns
Todd
Recipient
RESPEC
2018 Fiscal Year Funding Amount
$7,549
Fund Source

RESPEC is a contractor with knowledge of site-specific standard development and will respond to United States Environmental Protection Agency questions and concerns regarding attainability of standards. The response will be based on bathtub model data and also a review of technical memorandums developed by the Minnesota Pollution Control Agency on aquatic life and aquatic recreational standard attainability.

Douglas
Meeker
Morrison
Pope
Stearns
Todd
Recipient
Sauk River Watershed District
2010 Fiscal Year Funding Amount
$68,475
Fund Source

The SRWD, with assistance from local volunteers, will conduct water quality assessments on William Lake, Long Lake, Cedar Lake, Bass Lake. Felix Lake, Little Osakis Lake and Trout Creek to attain the necessary data to determine impairment status.

Chippewa
Todd
Recipient
Emmons and Olivier Resources, Inc.
2011 Fiscal Year Funding Amount
$53,000
Fund Source

This project will provide the monitoring of reaches where there are data gaps, incorporate new data and analyze relevant data, identify pollutant sources, hold a stakeholder meeting, and gather information towards the future development of a Draft Restoration (TMDL) and Protection Plan.

Aitkin
Anoka
Becker
Beltrami
Benton
Carlton
Carver
Cass
Chisago
Clearwater
Crow Wing
Douglas
Hennepin
Hubbard
Isanti
Itasca
Kanabec
Kandiyohi
McLeod
Meeker
Mille Lacs
Morrison
Otter Tail
Pope
Renville
Sherburne
Sibley
Stearns
Todd
Wadena
Wright
Recipient
Emmons and Olivier Resources, Inc.
2011 Fiscal Year Funding Amount
$95,999
Fund Source

This project will support the monitoring of reaches where there are data gaps, incorporate new data and relevant data, continue identification of pollutant sources, complete load duration curves, coordinate and encourage participation in stakeholder meetings. The information gathered during Phase IIB will be utilized towards the development of a Draft Restoration (TMDL) and Protection Plan (Plan).

Aitkin
Anoka
Benton
Carver
Chisago
Crow Wing
Dakota
Douglas
Hennepin
Isanti
Kanabec
Kandiyohi
Le Sueur
McLeod
Meeker
Mille Lacs
Morrison
Nicollet
Pope
Ramsey
Renville
Scott
Sherburne
Sibley
Stearns
Todd
Wright