Minnesota's Legacy

All Projects

Showing 1 - 40 of 60 | Export projects
Recipient
Chippewa River Watershed Project
2013 Fiscal Year Funding Amount
$136,325
Fund Source

This project will work with the MPCA to conduct watershed pollutant load monitoring at four sites in the Chippewa River watershed and one site in the neighboring Pomme de Terre River watershed . The Chippewa River Watershed Project (CRWP) team will also aid the MPCA in measuring and comparing regional differences and long-term trends in water quality. The goal is to collect quality data and complete load calculations for the five sites using the MPCA's established protocols.

Big Stone
Chippewa
Douglas
Grant
Kandiyohi
Otter Tail
Pope
Stearns
Stevens
Swift
Recipient
Metropolitan Council-Environmental Services
2013 Fiscal Year Funding Amount
$405,500
Fund Source

This project will provide condition monitoring and problem investigation monitoring at the following sites.
Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek.
Minnesota River: Tributaries include Eagle Creek,Riley Creek, and Valley Creek tributary to the St. Croix River

Anoka
Benton
Carver
Chisago
Dakota
Hennepin
Isanti
Le Sueur
McLeod
Meeker
Mille Lacs
Morrison
Nicollet
Pine
Ramsey
Renville
Rice
Scott
Sherburne
Sibley
Stearns
Washington
Wright
Recipient
Metropolitan Council/Environmental Financial Group Inc.
2010 Fiscal Year Funding Amount
$11,785
2011 Fiscal Year Funding Amount
$36,754
Fund Source

On behalf of the Metropolitan Council, Environmental Financial Group Inc. generated a matrix of water conservation programs with detailed information about the costs and benefits of the programs. Tools were also developed to allow users to calculate potential water savings, estimate program implementation costs, and test the effects of various water conservation programs and rate structures.

Aitkin
Anoka
Becker
Beltrami
Benton
Big Stone
Blue Earth
Brown
Carlton
Carver
Cass
Chippewa
Chisago
Clay
Clearwater
Cook
Cottonwood
Crow Wing
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Hennepin
Houston
Hubbard
Isanti
Itasca
Jackson
Kanabec
Kandiyohi
Kittson
Koochiching
Lac qui Parle
Lake
Lake of the Woods
Le Sueur
Lincoln
Lyon
Mahnomen
Marshall
Martin
McLeod
Meeker
Mille Lacs
Morrison
Mower
Murray
Nicollet
Nobles
Norman
Olmsted
Otter Tail
Pennington
Pine
Pipestone
Polk
Pope
Ramsey
Red Lake
Redwood
Renville
Rice
Rock
Roseau
Scott
Sherburne
Sibley
St. Louis
Statewide
Stearns
Steele
Stevens
Swift
Todd
Traverse
Wabasha
Wadena
Waseca
Washington
Watonwan
Wilkin
Winona
Wright
Yellow Medicine
Recipient
MN DNR
2012 Fiscal Year Funding Amount
$300,000
2013 Fiscal Year Funding Amount
$300,000

PROJECT OVERVIEW

Anoka
Blue Earth
Clay
Nicollet
Renville
Sibley
Wright
Recipient
Minnesota Geological Survey
2011 Fiscal Year Funding Amount
$1,130,000

PROJECT OVERVIEW

Isanti
Olmsted
Sherburne
Wright
Recipient
RESPEC
2012 Fiscal Year Funding Amount
$67,972
Fund Source

This project will construct three watershed framework models built using the Hydrologic Simulation Program FORTRAN. These executable models will simulate hydrology at the 12-digit HUC subbasin scale. An HSPF model will be built for each of the following 8-HUC watersheds: Red Lake River (09020303) and the Clearwater River (09020305).

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
Lower Mississippi River Watershed Management Organization (LMRWMO)
2012 Fiscal Year Funding Amount
$189,999
2013 Fiscal Year Funding Amount
$29,995
Fund Source

This project will complete a comprehensive study, following a rational, step-wise process of data analysis, response modeling and comparison to the water quality standards, followed by impairment diagnosis, modeling of improvement and protection options, and development of a WRAP Report and Implementation Plan for Sunfish lake, Thompson lake, Pickerel lake, and Rogers lake.

Anoka
Carver
Dakota
Hennepin
Ramsey
Sherburne
Washington
Wright
Recipient
RESPEC
2012 Fiscal Year Funding Amount
$49,996
Fund Source

This project will finalize HSPF watershed model construction by incorporating internal phosphorus loading in modeled lakes, run a suite of implementation scenarios and generate a GenScn project containing model output. The consultant will produce HSPF watershed models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will deliver all modeling files for baseline and implementation scenarios and provide a GenScn project containing model output.

Becker
Carver
Cass
Clearwater
Crow Wing
Douglas
Hennepin
Hubbard
Kandiyohi
McLeod
Meeker
Morrison
Otter Tail
Pope
Renville
Sibley
Stearns
Todd
Wadena
Wright
Recipient
Emmons & Olivier Resources
2013 Fiscal Year Funding Amount
$99,355
Fund Source

This project will complete a pollutant source identification and subwatershed information report and support the development of a Draft Restoration and Protection Plan (RAPP). It will also support the devlopment of a Implementation Plan that will identify target areas for BMP implementation for bacteria reductions.

Anoka
Benton
Carver
Crow Wing
Dakota
Douglas
Hennepin
Kandiyohi
McLeod
Meeker
Mille Lacs
Morrison
Pope
Ramsey
Sherburne
Sibley
Stearns
Todd
Washington
Wright
Recipient
Coon Creek Watershed District
2013 Fiscal Year Funding Amount
$252,200
Fund Source

This project will provide the MPCA, CCWD, and all other stakeholders the information and tools necessary to improve the water quality within Coon Creek Watershed District. The improvements will take place using targeted activities throughout the watershed to reduce the primary biological and chemical stressors. In turn, the reduction of these stressors will help to reduce overall loadings of sediment, turbidity, total phosphorus, and E. coli bacteria.

Anoka
Carver
Dakota
Hennepin
Ramsey
Sherburne
Washington
Wright
Recipient
Emmons and Oliver Resources, Inc.
2013 Fiscal Year Funding Amount
$22,012
Fund Source

The goal of this project is to develop a phosphorus TMDL for the six impaired lakes in the southwest portion of the Rice Creek Watershed District; Island Lake, Little Lake Johanna, Long Lake, East Moore Lake, Pike Lake and Lake Valentine.

Anoka
Carver
Dakota
Hennepin
Ramsey
Sherburne
Stearns
Wright
Recipient
Red Lake Watershed District (RLWD)
2011 Fiscal Year Funding Amount
$150,000
2013 Fiscal Year Funding Amount
$109,900
Fund Source

This project Phase will collect data, background information, and watershed characteristics within the Red Lake River watershed. This information will be documented within the framework of early draft TMDL Reports (with background information, but no load calculations) for impaired reaches within this watershed and early draft protection plans for the areas in the watershed that are not currently impaired.

Beltrami
Clearwater
Marshall
Pennington
Polk
Red Lake
Recipient
Sand Hill River Watershed District
2011 Fiscal Year Funding Amount
$178,139
Fund Source

This first phase of project will define the existing watershed conditions; identify gaps in existing data; design and implement a plan to address data gaps; incorporate gap data into watershed description; guide development of the HSPF model; establish citizen advisory, technical advisory and locally-based focus groups; research and design an education and outreach strategy; and design and deploy the tools and methods to employ the strategy.

Mahnomen
Norman
Polk
Recipient
Red Lake Watershed District
2011 Fiscal Year Funding Amount
$178,832
2013 Fiscal Year Funding Amount
$224,560
Fund Source

The goal of this project is the implementation of a watershed-based total maximum daily load (TMDL) and watershed assessment project.

Beltrami
Marshall
Pennington
Recipient
Metropolitan Council/Barr Engineering Company
2010 Fiscal Year Funding Amount
$35,246
2011 Fiscal Year Funding Amount
$31,754
Fund Source

On behalf of the Metropolitan Council, Barr Engineering Company developed maps and supporting information to characterize the relationship between surface waters and groundwater, identifying surface waters most likely to be impacted by groundwater withdrawals in the region. This project also provided guidance on effective resource monitoring strategies and costs for each type of surface water feature.

Anoka
Carver
Chisago
Dakota
Hennepin
Isanti
Ramsey
Scott
Sherburne
Washington
Wright
Recipient
University of Minnesota
2012 Fiscal Year Funding Amount
$175,000
2013 Fiscal Year Funding Amount
$175,000

PROJECT OVERVIEW

Aitkin
Becker
Beltrami
Benton
Carlton
Cass
Clearwater
Cook
Crow Wing
Hubbard
Itasca
Koochiching
Lake
Lake of the Woods
Mahnomen
Marshall
Morrison
Otter Tail
Pennington
Pine
Polk
Red Lake
Roseau
St. Louis
Todd
Wadena
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$99,986
Fund Source

This project will finalize HSPF watershed model construction and complete the calibration/validation process. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval.

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
Aqua Terra Consultants
2013 Fiscal Year Funding Amount
$36,848
Fund Source

This project will maximize the utility and usefulness of three HSPF models that have been constructed and calibrated for hydrology. The contractor will identify and reduce parameterization errors in the following three HSPF models: 1) Buffalo River Watershed, 2 ) Thief River Watershed, 3) Bois de Sioux-Mustinka Watersheds. This will result, not only in a better hydrology calibration, but will also improve each of the models’ ability to more accurately estimate sediment and pollutant loads and concentrations.

Becker
Beltrami
Big Stone
Clay
Grant
Marshall
Otter Tail
Pennington
Roseau
Stevens
Traverse
Wilkin
Recipient
Red Lake Watershed District
2013 Fiscal Year Funding Amount
$123,400
Fund Source

This phase of the project will complete the analysis of existing and newly collected water quality data in the Red River of the North-Grand Marais Creek watershed and also verify the impairments on the currently listed reaches and determine the status of the remaining river reaches as being either impaired or currently meeting standards. Stakeholder involvement and public participation will be a primary focus throughout the project.

Marshall
Pennington
Polk
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$253,710
Fund Source

The goal of this project is to construct, calibrate, and validate five Hydrologic Simulation Program FORTRAN (HSPF) watershed models. The outcome will be HSPF models that can readily be used to provide information to support conventional parameter TMDLs. These models will generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.

Wright
Todd
Stearns
St. Louis
Sherburne
Morrison
Mille Lacs
Meeker
Kanabec
Itasca
Isanti
Chisago
Cass
Carlton
Benton
Anoka
Aitkin
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$89,968
Fund Source

The goal of this project is to construct, calibrate, and validate a watershed model using Hydrologic Simulation Program FORTRAN (HSPF). The project will result in a HSPF model that can readily be used to provide information to support conventional parameter TMDLs.

Kittson
Marshall
Roseau
Recipient
Lake of the Woods Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$108,044
Fund Source

This project involves the water quality monitoring of, and data analysis for four major watersheds (8-digit Hydrologic Unit Codes) in the Rainy River Basin. This monitoring will assist in providing the water chemistry data needed to calculate annual pollutant loads for the Major Watershed Pollutant Load Monitoring Network (MWPLMN) and provide short term data sets of select parameters to other Agency programs.

Beltrami
Itasca
Koochiching
Lake of the Woods
St. Louis
Recipient
Houston Engineering
2012 Fiscal Year Funding Amount
$67,996
Fund Source

This project will continue to develop, and calibrate/validate the hydrology of an HSPF watershed model for the Thief River watershed. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval. The consultant will produce an HSPF watershed model that can readily be used to provide information to support conventional parameter TMDLs.

Beltrami
Marshall
Pennington
Roseau
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$174,954
Fund Source

This project will construct, calibrate, and validate three HSPF watershed models. The consultant will produce HSPF models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will clearly demonstrate that these models generate predicted output time series for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.

Becker
Hubbard
Crow Wing
Aitkin
Clearwater
Cass
Itasca
Beltrami
Recipient
RESPEC
2011 Fiscal Year Funding Amount
$149,677
Fund Source

This project will finalize HSPF watershed model construction and complete the calibration/validation process for the following three watersheds: North Fork Crow River, South Fork Crow River, and Sauk River.

Carver
Douglas
Hennepin
Kandiyohi
McLeod
Meeker
Morrison
Pope
Renville
Sibley
Stearns
Todd
Wright
Recipient
Emmons and Olivier Resources, Inc. (EOR)
2011 Fiscal Year Funding Amount
$135,000
Fund Source

This project will complete the development of two watershed HSPF models for the Mustinka River and Bois de Sioux River watersheds. These calibrated and validated executable models will simulate hydrology at the 12-digit HUC subbasin scale.

Big Stone
Grant
Otter Tail
Stevens
Traverse
Wilkin
Recipient
Metropolitan Council/Minnesota Geological Survey
2010 Fiscal Year Funding Amount
$18,226
2011 Fiscal Year Funding Amount
$48,138
Fund Source

On behalf of the Metropolitan Council, the Minnesota Geological Survey collected information and conducted an assessment of the hydraulic properties and chemistry of selected aquifers in the metro area. This project greatly improves the accessibility of existing data, which were previously available only in scattered paper reports. A robust database of groundwater age, aquifer hydraulic conductivity and groundwater chemistry data was developed to make the information easily accessible to water resource managers.

Anoka
Carver
Chisago
Dakota
Hennepin
Isanti
Ramsey
Scott
Sherburne
Washington
Wright
Recipient
RESPEC
2011 Fiscal Year Funding Amount
$214,963
Fund Source

This project will complete spatial and temporal revisions of 6 Hydrologic Simulation Program FORTRAN (HSPF) models, the recalibration and validation of 7 watershed HSPF models, and the revision of the drainage network and point source representation of the Pomme de Terre HSPF model.

Big Stone
Blue Earth
Brown
Carver
Cottonwood
Dakota
Douglas
Faribault
Freeborn
Grant
Hennepin
Jackson
Le Sueur
Lincoln
Lyon
Mahnomen
Martin
McLeod
Murray
Nicollet
Norman
Otter Tail
Pipestone
Polk
Ramsey
Redwood
Renville
Rice
Scott
Sibley
Steele
Stevens
Swift
Waseca
Watonwan
Yellow Medicine
Recipient
Science Museum of Minnesota
2010 Fiscal Year Funding Amount
$300,000

Overall Project Outcome and Results

Benton
Big Stone
Blue Earth
Brown
Carver
Chippewa
Recipient
Cass County (Environmental Services Department)
2012 Fiscal Year Funding Amount
$30,000
2013 Fiscal Year Funding Amount
$70,000
Fund Source

This project supports the planning, coordination and civic engagement/outreach components of the Leech Lake River Major Watershed project. Phase 1 will focus towards the development of project teams, identifying stakeholders, developing an initial civic engagement strategic plan and reviewing current and past watershed project data. Phase II of this project will focus on source assessment, running of watershed modeling scenarios, lake protection planning, stressor identification and the continuation of the Civic Engagement components of the project.

Beltrami
Cass
Hubbard
Recipient
Two Rivers Watershed District
2012 Fiscal Year Funding Amount
$179,348
2013 Fiscal Year Funding Amount
$99,933
Fund Source

This project will include analysis of existing and newly collected water quality data to verify the impairments on the currently listed reaches and to determine the status of the remaining river reaches as being either impaired or currently meeting standards. Stakeholder involvement and public participation will be a focus throughout the Watershed Approach Project. The project provides an opportunity to assess and leverage the capacity for the local community to engage in the process of watershed management and to adopt protection and restoration practices.

Kittson
Marshall
Roseau
Recipient
International Water Institute
2012 Fiscal Year Funding Amount
$134,867
Fund Source

This project will support water quality monitoring and data analysis in the Red River Basin. The monitoring will assist in providing water chemistry data needed to calculate annual pollutant loads for the Major Watershed Load Monitoring Program (MWLMP) and provide short term data sets of select parameters to other MPCA programs.

Beltrami
Clearwater
Kittson
Mahnomen
Marshall
Norman
Pennington
Polk
Red Lake
Roseau
Recipient
Metropolitan Council/Minnesota Geological Survey
2011 Fiscal Year Funding Amount
$23,181
2012 Fiscal Year Funding Amount
$27,850
Fund Source

On behalf of the Metropolitan Council, the Minnesota Geological Survey evaluated the vulnerability of glacial aquifers in the Twin Cities metropolitan area. The project improved upon previous vulnerability assessments by incorporating a substantial amount of new aquifer property information and blending methods previously used by the Minnesota Departments of Health and Natural Resources. The result is a consistent vulnerability assessment across the metropolitan area based on the most up-to-date information available.

Anoka
Carver
Chisago
Dakota
Hennepin
Isanti
Ramsey
Scott
Sherburne
Washington
Wright
Recipient
MN DNR
2010 Fiscal Year Funding Amount
$2,100,000

The Minnesota County Biological Survey (MCBS) is an ongoing effort begun in 1987 by the Minnesota Department of Natural Resources (DNR) that is systematically surveying, county-by-county, the state's natural habitats. The effort identifies significant natural areas and collects and interprets data on the status, distribution, and ecology of plants, animals, and native plant communities throughout the state. Through 2009 surveys have been completed in 74 of Minnesota's 87 counties and have added nearly 17,000 new records of rare features to the DNR's information systems.

Beltrami
Clearwater
Cook
Koochiching
Lake
Lake of the Woods
St. Louis
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$68,033

This project addresses five reaches of the Minnesota River that have aquatic recreation impairments as identified by high concentrations of E. coli. The project will describe the water quality impairments, complete pollutant source assessments, establish loading capacities and allocations for the impairments, and develop implementation strategies.

Big Stone
Blue Earth
Brown
Carver
Chippewa
Cottonwood
Douglas
Faribault
Freeborn
Grant
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
McLeod
Murray
Nicollet
Pipestone
Pope
Redwood
Renville
Scott
Sibley
Steele
Stevens
Swift
Waseca
Watonwan
Yellow Medicine
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$68,033
Fund Source

This project addresses five reaches of the Minnesota River that have aquatic recreation impairments as identified by high concentrations of E. coli. The project will describe the water quality impairments, complete pollutant source assessments, establish loading capacities and allocations for the impairments, and develop implementation strategies.

Big Stone
Blue Earth
Brown
Carver
Chippewa
Cottonwood
Douglas
Faribault
Freeborn
Grant
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
McLeod
Murray
Nicollet
Pipestone
Pope
Redwood
Renville
Scott
Sibley
Steele
Stevens
Swift
Waseca
Watonwan
Yellow Medicine
Recipient
Beltrami County Environmental Services (BCES)
2013 Fiscal Year Funding Amount
$30,000
Fund Source

This Phase 1 project will support project planning, coordination and civic engagement/outreach components of the Mississippi River (Headwaters) Major Watershed project. Phase 1 of this project will focus towards the development of project teams, identifying stakeholders, developing an initial civic engagement strategic plan and reviewing current and past watershed project data.

Clearwater
Cass
Beltrami
Becker
Itasca
Hubbard
Recipient
Minnesota Pollution Control Agency
2014 Fiscal Year Funding Amount
$3,284,104
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities within the described priority watersheds. Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support. Biological and Water Chemistry Stream Monitoring: Monitoring to assess the conditions of streams in each watershed.

Aitkin
Becker
Beltrami
Benton
Big Stone
Carlton
Carver
Cass
Chippewa
Chisago
Clay
Clearwater
Cook
Cottonwood
Crow Wing
Dakota
Faribault
Fillmore
Freeborn
Hennepin
Houston
Itasca
Jackson
Kittson
Koochiching
Recipient
Minnesota Pollution Control Agency
2014 Fiscal Year Funding Amount
$297,169
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Pollution Control Agency
2015 Fiscal Year Funding Amount
$287,628
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona