Recipient
Metropolitan Council/Environmental Financial Group Inc.
2010 Fiscal Year Funding Amount
$11,785
2011 Fiscal Year Funding Amount
$36,754
Fund Source

On behalf of the Metropolitan Council, Environmental Financial Group Inc. generated a matrix of water conservation programs with detailed information about the costs and benefits of the programs. Tools were also developed to allow users to calculate potential water savings, estimate program implementation costs, and test the effects of various water conservation programs and rate structures.

Aitkin
Anoka
Becker
Beltrami
Benton
Big Stone
Blue Earth
Brown
Carlton
Carver
Cass
Chippewa
Chisago
Clay
Clearwater
Cook
Cottonwood
Crow Wing
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Hennepin
Houston
Hubbard
Isanti
Itasca
Jackson
Kanabec
Kandiyohi
Kittson
Koochiching
Lac qui Parle
Lake
Lake of the Woods
Le Sueur
Lincoln
Lyon
Mahnomen
Marshall
Martin
McLeod
Meeker
Mille Lacs
Morrison
Mower
Murray
Nicollet
Nobles
Norman
Olmsted
Otter Tail
Pennington
Pine
Pipestone
Polk
Pope
Ramsey
Red Lake
Redwood
Renville
Rice
Rock
Roseau
Scott
Sherburne
Sibley
St. Louis
Statewide
Stearns
Steele
Stevens
Swift
Todd
Traverse
Wabasha
Wadena
Waseca
Washington
Watonwan
Wilkin
Winona
Wright
Yellow Medicine
Recipient
RESPEC
2012 Fiscal Year Funding Amount
$67,972
Fund Source

This project will construct three watershed framework models built using the Hydrologic Simulation Program FORTRAN. These executable models will simulate hydrology at the 12-digit HUC subbasin scale. An HSPF model will be built for each of the following 8-HUC watersheds: Red Lake River (09020303) and the Clearwater River (09020305).

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$70,000
Fund Source

This project will complete spatial and temporal revisions , recalibration and validation of 7 watershed HSPF models. These fully functioning calibrated validated executable models will simulate hydrology, sediment (sand, silt, and clay), temperature, phosphorus, nitrogen, dissolved oxygen, biochemical oxygen demand, and algae at the 12-digit HUC subbasin scale (or finer).

Blue Earth
Brown
Carver
Cottonwood
Dakota
Faribault
Freeborn
Jackson
Le Sueur
Lincoln
Lyon
Martin
McLeod
Murray
Nicollet
Pipestone
Ramsey
Redwood
Renville
Rice
Scott
Sibley
Steele
Waseca
Watonwan
Yellow Medicine
Recipient
Red Lake Watershed District (RLWD)
2011 Fiscal Year Funding Amount
$150,000
2013 Fiscal Year Funding Amount
$109,900
Fund Source

This project Phase will collect data, background information, and watershed characteristics within the Red Lake River watershed. This information will be documented within the framework of early draft TMDL Reports (with background information, but no load calculations) for impaired reaches within this watershed and early draft protection plans for the areas in the watershed that are not currently impaired.

Beltrami
Clearwater
Marshall
Pennington
Polk
Red Lake
Recipient
Sand Hill River Watershed District
2011 Fiscal Year Funding Amount
$178,139
Fund Source

This first phase of project will define the existing watershed conditions; identify gaps in existing data; design and implement a plan to address data gaps; incorporate gap data into watershed description; guide development of the HSPF model; establish citizen advisory, technical advisory and locally-based focus groups; research and design an education and outreach strategy; and design and deploy the tools and methods to employ the strategy.

Mahnomen
Norman
Polk
Recipient
Red Lake Watershed District
2011 Fiscal Year Funding Amount
$178,832
2013 Fiscal Year Funding Amount
$224,560
Fund Source

The goal of this project is the implementation of a watershed-based total maximum daily load (TMDL) and watershed assessment project.

Beltrami
Marshall
Pennington
Recipient
University of Minnesota
2012 Fiscal Year Funding Amount
$175,000
2013 Fiscal Year Funding Amount
$175,000

PROJECT OVERVIEW

Aitkin
Becker
Beltrami
Benton
Carlton
Cass
Clearwater
Cook
Crow Wing
Hubbard
Itasca
Koochiching
Lake
Lake of the Woods
Mahnomen
Marshall
Morrison
Otter Tail
Pennington
Pine
Polk
Red Lake
Roseau
St. Louis
Todd
Wadena
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$99,986
Fund Source

This project will finalize HSPF watershed model construction and complete the calibration/validation process. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval.

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
Aqua Terra Consultants
2013 Fiscal Year Funding Amount
$36,848
Fund Source

This project will maximize the utility and usefulness of three HSPF models that have been constructed and calibrated for hydrology. The contractor will identify and reduce parameterization errors in the following three HSPF models: 1) Buffalo River Watershed, 2 ) Thief River Watershed, 3) Bois de Sioux-Mustinka Watersheds. This will result, not only in a better hydrology calibration, but will also improve each of the models’ ability to more accurately estimate sediment and pollutant loads and concentrations.

Becker
Beltrami
Big Stone
Clay
Grant
Marshall
Otter Tail
Pennington
Roseau
Stevens
Traverse
Wilkin
Recipient
Lake of the Woods Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$108,044
Fund Source

This project involves the water quality monitoring of, and data analysis for four major watersheds (8-digit Hydrologic Unit Codes) in the Rainy River Basin. This monitoring will assist in providing the water chemistry data needed to calculate annual pollutant loads for the Major Watershed Pollutant Load Monitoring Network (MWPLMN) and provide short term data sets of select parameters to other Agency programs.

Beltrami
Itasca
Koochiching
Lake of the Woods
St. Louis
Recipient
Houston Engineering
2012 Fiscal Year Funding Amount
$67,996
Fund Source

This project will continue to develop, and calibrate/validate the hydrology of an HSPF watershed model for the Thief River watershed. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval. The consultant will produce an HSPF watershed model that can readily be used to provide information to support conventional parameter TMDLs.

Beltrami
Marshall
Pennington
Roseau
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$174,954
Fund Source

This project will construct, calibrate, and validate three HSPF watershed models. The consultant will produce HSPF models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will clearly demonstrate that these models generate predicted output time series for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.

Becker
Hubbard
Crow Wing
Aitkin
Clearwater
Cass
Itasca
Beltrami
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$128,887
Fund Source
The goal of this project is to extend the existing HSPF models through 2012 in the Chippewa Watershed (07020005) and Hawk-Yellow Medicine Watershed (07020004) to incorporate recent monitoring data to support current MPCA business needs and sediment source investigations.
Blue Earth
Brown
Carver
Chippewa
Cottonwood
Dakota
Douglas
Faribault
Freeborn
Hennepin
Kandiyohi
Le Sueur
Lincoln
Lyon
McLeod
Murray
Nicollet
Otter Tail
Pipestone
Pope
Renville
Rice
Scott
Sibley
Steele
Swift
Waseca
Watonwan
Yellow Medicine
Recipient
RESPEC
2011 Fiscal Year Funding Amount
$214,963
Fund Source

This project will complete spatial and temporal revisions of 6 Hydrologic Simulation Program FORTRAN (HSPF) models, the recalibration and validation of 7 watershed HSPF models, and the revision of the drainage network and point source representation of the Pomme de Terre HSPF model.

Big Stone
Blue Earth
Brown
Carver
Cottonwood
Dakota
Douglas
Faribault
Freeborn
Grant
Hennepin
Jackson
Le Sueur
Lincoln
Lyon
Mahnomen
Martin
McLeod
Murray
Nicollet
Norman
Otter Tail
Pipestone
Polk
Ramsey
Redwood
Renville
Rice
Scott
Sibley
Steele
Stevens
Swift
Waseca
Watonwan
Yellow Medicine
Recipient
Cass County (Environmental Services Department)
2012 Fiscal Year Funding Amount
$30,000
2013 Fiscal Year Funding Amount
$70,000
Fund Source

This project supports the planning, coordination and civic engagement/outreach components of the Leech Lake River Major Watershed project. Phase 1 will focus towards the development of project teams, identifying stakeholders, developing an initial civic engagement strategic plan and reviewing current and past watershed project data. Phase II of this project will focus on source assessment, running of watershed modeling scenarios, lake protection planning, stressor identification and the continuation of the Civic Engagement components of the project.

Beltrami
Cass
Hubbard
Recipient
International Water Institute
2012 Fiscal Year Funding Amount
$134,867
Fund Source

This project will support water quality monitoring and data analysis in the Red River Basin. The monitoring will assist in providing water chemistry data needed to calculate annual pollutant loads for the Major Watershed Load Monitoring Program (MWLMP) and provide short term data sets of select parameters to other MPCA programs.

Beltrami
Clearwater
Kittson
Mahnomen
Marshall
Norman
Pennington
Polk
Red Lake
Roseau
Recipient
MN DNR
2010 Fiscal Year Funding Amount
$2,100,000

The Minnesota County Biological Survey (MCBS) is an ongoing effort begun in 1987 by the Minnesota Department of Natural Resources (DNR) that is systematically surveying, county-by-county, the state's natural habitats. The effort identifies significant natural areas and collects and interprets data on the status, distribution, and ecology of plants, animals, and native plant communities throughout the state. Through 2009 surveys have been completed in 74 of Minnesota's 87 counties and have added nearly 17,000 new records of rare features to the DNR's information systems.

Beltrami
Clearwater
Cook
Koochiching
Lake
Lake of the Woods
St. Louis
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$68,033

This project addresses five reaches of the Minnesota River that have aquatic recreation impairments as identified by high concentrations of E. coli. The project will describe the water quality impairments, complete pollutant source assessments, establish loading capacities and allocations for the impairments, and develop implementation strategies.

Big Stone
Blue Earth
Brown
Carver
Chippewa
Cottonwood
Douglas
Faribault
Freeborn
Grant
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
McLeod
Murray
Nicollet
Pipestone
Pope
Redwood
Renville
Scott
Sibley
Steele
Stevens
Swift
Waseca
Watonwan
Yellow Medicine
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$68,033
Fund Source

This project addresses five reaches of the Minnesota River that have aquatic recreation impairments as identified by high concentrations of E. coli. The project will describe the water quality impairments, complete pollutant source assessments, establish loading capacities and allocations for the impairments, and develop implementation strategies.

Big Stone
Blue Earth
Brown
Carver
Chippewa
Cottonwood
Douglas
Faribault
Freeborn
Grant
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
McLeod
Murray
Nicollet
Pipestone
Pope
Redwood
Renville
Scott
Sibley
Steele
Stevens
Swift
Waseca
Watonwan
Yellow Medicine
Recipient
Beltrami County Environmental Services (BCES)
2013 Fiscal Year Funding Amount
$30,000
Fund Source

This Phase 1 project will support project planning, coordination and civic engagement/outreach components of the Mississippi River (Headwaters) Major Watershed project. Phase 1 of this project will focus towards the development of project teams, identifying stakeholders, developing an initial civic engagement strategic plan and reviewing current and past watershed project data.

Clearwater
Cass
Beltrami
Becker
Itasca
Hubbard
Recipient
Minnesota Pollution Control Agency
2014 Fiscal Year Funding Amount
$3,284,104
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities within the described priority watersheds. Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support. Biological and Water Chemistry Stream Monitoring: Monitoring to assess the conditions of streams in each watershed.

Aitkin
Becker
Beltrami
Benton
Big Stone
Carlton
Carver
Cass
Chippewa
Chisago
Clay
Clearwater
Cook
Cottonwood
Crow Wing
Dakota
Faribault
Fillmore
Freeborn
Hennepin
Houston
Itasca
Jackson
Kittson
Koochiching
Recipient
Minnesota Pollution Control Agency
2014 Fiscal Year Funding Amount
$297,169
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Pollution Control Agency
2015 Fiscal Year Funding Amount
$287,628
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Pollution Control Agency
2015 Fiscal Year Funding Amount
$3,650,679
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities within the described priority watersheds. Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support. Biological and Water Chemistry Stream Monitoring: Monitoring to assess the conditions of streams in each watershed.

Aitkin
Becker
Beltrami
Benton
Big Stone
Carlton
Carver
Cass
Chippewa
Chisago
Clay
Clearwater
Cook
Cottonwood
Crow Wing
Dakota
Faribault
Fillmore
Freeborn
Hennepin
Houston
Itasca
Jackson
Kittson
Koochiching
Recipient
Minnesota Pollution Control Agency
2012 Fiscal Year Funding Amount
$5,500,000
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities within the described priority watersheds.

Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support.

Aitkin
Beltrami
Carver
Cass
Clearwater
Crow Wing
Dodge
Goodhue
Hennepin
Hubbard
Kandiyohi
Lake of the Woods
Marshall
McLeod
Meeker
Mower
Olmsted
Pennington
Polk
Red Lake
Renville
Rice
Roseau
Sibley
Steele
Wabasha
Wright
Recipient
Minnesota Department of Health
2014 Fiscal Year Funding Amount
$325,000
2015 Fiscal Year Funding Amount
$325,000
2017 Fiscal Year Funding Amount
$325,000
2018 Fiscal Year Funding Amount
$400,000
Fund Source

Arsenic occurs naturally in soil and minerals and is commonly found in groundwater throughout much of Minnesota. The occurrence and distribution of arsenic in groundwater is difficult to predict. Research is steadily increasing our understanding of the mechanisms and geologic conditions that determine arsenic occurrence in groundwater. The arsenic concentration in a new well, measured at the time of construction, is sometimes higher or lower, compared to subsequent sampling results.

Anoka
Becker
Carlton
Carver
Clay
Hennepin
Mahnomen
McLeod
Meeker
Norman
Otter Tail
Sherburne
St. Louis
Wilkin
Wright
Recipient
United States Geological Survey (USGS)
2012 Fiscal Year Funding Amount
$10,800
2013 Fiscal Year Funding Amount
$11,119
Fund Source

This project will collect real-time parameter data for specific conductance, water temperature, pH, dissolved oxygen, turbidity and stream flow at the United States geological Survey (USGS) gaging stations located at Fargo, ND and Grand Forks, ND on the Red River of the North; and publish the data both on the USGS NWIS website and in the USGS Annual Report.

Beltrami
Clay
Clearwater
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Wilkin
Recipient
International Water Institute
2012 Fiscal Year Funding Amount
$272,267
2014 Fiscal Year Funding Amount
$359,367
Fund Source

International Water Institute (IWI) staff will monitor 24 sites in the Bois de Sioux, Mustinka (2 sites), Buffalo (8 sites), Red Lake (4 sites), Sandhill (3 sites), Thief (2 sites), and Tamarac River (3 sites) Watersheds intensively over a 2 year period in an attempt to collect 25 samples per year at each site. If conditions allow for the collection of all planned samples, 1200 stream samples will be collected over the time period. Monitoring will include field measurements, observations, and at least three photographs during each site visit.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Red River Watershed Management Board
2012 Fiscal Year Funding Amount
$200,000
Fund Source

MN Legislative Clean Water Fund funding to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data all for the benefit of water quality in the Red River Basin.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Kittson
Lake of the Woods
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Ducks Unlimited, Inc.
2010 Fiscal Year Funding Amount
$300,000

Minnesota's wetlands provide crucial habitat for waterfowl and other wildlife, assist in flood control, and help maintain water quality. However, the state has lost half the wetlands that existed before European settlement and these drained wetlands have not been mapped as part of the National Wetlands Inventory. This appropriation is enabling efforts by Ducks Unlimited to provide a complement to the National Wetlands Inventory by identifying and mapping drained wetlands that have the potential to be restored to provide their various benefits once again.

Clay
Mahnomen
McLeod
Meeker
Nicollet
Norman
Recipient
Pipestone Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$49,130
Fund Source

This project will collect water quality data at eight stream sites in three of the MPCA targeted watersheds. The sites are located on Medary Creek, Flandreau Creek, Pipestone Creek (2), Split Rock Creek, Rock River, Poplar Creek and Chanarambie Creek. This project will also promote a citizens monitoring program and encourage individuals to participate in a monitoring program.

Lincoln
Murray
Nobles
Pipestone
Rock
Recipient
Headwaters Science Center (HSC)
2012 Fiscal Year Funding Amount
$45,229
Fund Source

This project will include stream monitoring of six preselected sites from the Leech Lake Watershed (HUC 07010102) and Pine River Watershed (HUC 07010105). The sites will be monitored for chemical, physical and biological parameters for two years.

Aitkin
Beltrami
Cass
Crow Wing
Hubbard
Recipient
Red Lake Watershed District
2012 Fiscal Year Funding Amount
$86,514
Fund Source

A partnership of local agencies and organizations will monitor water quality at eighteen carefully chosen sites within the Red Lake River and Grand Marais Creek watersheds. Fourteen monitoring sites have been chosen within the Red Lake River watershed. Four sites have been chosen in the Grand Marais Creek watershed. Each of these sites will provide a representative assessment of the water quality conditions within one or more minor subwatersheds at the 12-digit hydrologic unit code (HUC12) level.

Beltrami
Clearwater
Marshall
Pennington
Polk
Red Lake
Recipient
Houston Engineering
2013 Fiscal Year Funding Amount
$33,096
Fund Source

This project will finalize the Hydrologic Simulation Program FORTRAN (HSPF) watershed model construction and complete the calibration/validation process. The consultant will produce an HSPF watershed model that can readily be used to provide information to support conventional parameter TMDLs.

Beltrami
Marshall
Pennington
Roseau
Recipient
Red Lake Watershed District
2017 Fiscal Year Funding Amount
$7,500
Fund Source

The goal of this project is to calculate an additional bacteria total maximum daily load and incorporating that information in the Total Maximum Daily Load Report (TMDL) and the Watershed Restoration and Protection Strategy (WRAPS) report. Other services that will be provided during this project are technical assistance, assistance with responses to comments received during the public notice process, incorporating public comments into the documents and preparing the documents for final federal and state approval.

Beltrami
Marshall
Pennington
Recipient
Red Lake Department of Natural Resources
2015 Fiscal Year Funding Amount
$121,943
2017 Fiscal Year Funding Amount
$184,960
Fund Source

The goal of this project is to gather and collect necessary watershed data for the development of a Watershed Restoration and Protection Strategy (WRAPS) for the Upper/Lower Red Lakes Watershed that includes impairments, their causes, and plans for restoration. Implementation of the WRAPS will maintain or improve water quality for the watershed.

Beltrami
Clearwater
Itasca
Koochiching