The goal of this project is to finalize the Lake Pepin Watershed phosphorus total maximum daily load (TMDL) report by using the existing information and documentation prepared under previous contracts to prepare one TMDL report that addresses the impairments on the mainstem of the Mississippi River. Information developed to date for draft TMDLs on the Minnesota River mainstem will be documented for later use by the Minnesota Pollution Control Agency.
The goal of this project is to extend existing Hydrologic Simulation Program FORTRAN (HSPF) models through 2017 for the following major watersheds: Redwood, Cottonwood, Watonwan, Blue Earth, Le Sueur, Pomme de Terre, Minnesota River-Headwaters, and Lac Qui Parle watersheds.
This project will collect water samples at seventeen monitoring locations ranging in size from 23,173 acres (7 Mile Creek) to over 9 million acres (Minnesota River at St. Peter) as a part of the Watershed Pollutant Load Monitoring Network (WPLMN). The Minnesota State University - Water Resources Center (WRC) has been directly involved with the program and is familiar with the streams and hydrology of the region. In addition to monitoring, the WRC will review, manage and submit the data in formats provided by the Minnesota Pollution Control Agency (MPCA).