The overall goal of this project is to perform water quality monitoring and load calculation duties to accomplish Minnesota Pollution Control Agency (MPCA) Watershed Pollutant Load Monitoring Network (WPLMN) monitoring efforts at the seven sites within the Redwood and Cottonwood River watersheds as well as the Minnesota River site near Morton. To accomplish this goal the requested funds will provide for technician’s time, mileage, lab costs, supplies, as well as equipment calibration and upkeep.
This project will collect water samples at seventeen monitoring locations ranging in size from 23,173 acres (7 Mile Creek) to over 9 million acres (Minnesota River at St. Peter) as a part of the Watershed Pollutant Load Monitoring Network (WPLMN). The Minnesota State University - Water Resources Center (WRC) has been directly involved with the program and is familiar with the streams and hydrology of the region. In addition to monitoring, the WRC will review, manage and submit the data in formats provided by the Minnesota Pollution Control Agency (MPCA).
The Olmsted County Soil and Water Conservation District will assist the Minnesota Pollution Control Agency (MPCA) with water quality monitoring and pollutant load calculations at four sub-watershed sites in the Zumbro River Watershed. Approximately 25 grab samples per site between ice-out and October 31 of 2019 will be collected along with field measurements and observations. Samples will be collected using procedures described in the Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedures and Guidance (SOPG).