Minnesota's Legacy

All Projects

Showing 1 - 7 of 7 | Export projects
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$249,932
Fund Source

This project will construct, calibrate, a set of HSPF watershed models covering the entire area of the Lake of the Woods drainage, including the Rainy River watershed. The consultant will produce HSPF models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will clearly demonstrate that these models generate predicted output timeseries for hydrology which are consistent with available sets of observed data.

Koochiching
Lake of the Woods
Roseau
St. Louis
Recipient
AQUA TERRA Consultants
2015 Fiscal Year Funding Amount
$199,999
Fund Source
Construct, calibrate, and validate three Hydrologic Simulation Program FORTRAN (HSPF) watershed models that can readily be used to provide information to support conventional parameter Total Maximum Daily Loads (TMDLs).
Aitkin
Carlton
Chisago
Isanti
Kanabec
Mille Lacs
Pine
Recipient
Wenck Associates, Inc.
2019 Fiscal Year Funding Amount
$187,625
Fund Source

The purpose of this work is to develop Total Maximum Daily Loads (TMDLs; a federal clean Water Act requirement) for streams and lakes in the Kettle River and Upper St. Croix watersheds. This and other technical information will be used to develop a separate report called a Watershed Restoration and Protection Strategy (WRAPS) report.

Aitkin
Carlton
Kanabec
Pine
Recipient
RESPEC
2016 Fiscal Year Funding Amount
$99,991
Fund Source

The goal of this project is to construct, calibrate, and validate a watershed model using the Hydrological Simulation Program FORTRAN (HSPF) model for the Upper/Lower Red Lake Watershed. The contractor will produce an HSPF model that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) Studies. The model will generate predicted output for hydrology, sediment, nutrients, and dissolved oxygen that is consistent with observed data.

Beltrami
Clearwater
Itasca
Koochiching
Recipient
RESPEC
2017 Fiscal Year Funding Amount
$49,999
Fund Source

The goal of this project is to extend, calibrate, and validate the existing Hydrological Simulation Program – FORTRAN (HSPF) watershed models in the Red Lake River, Thief River, Clearwater River and Red Lake watersheds.

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
University of Minnesota-Duluth (NRRI)
2012 Fiscal Year Funding Amount
$148,869
2014 Fiscal Year Funding Amount
$89,828
Fund Source

This project will generate water quality data for 10 stream locations MPCA designated for their 2012 and 2013 open-water sampling seasons (8 by NRRI-UMD and 2 via subcontract to the North St. Louis SWCD). The overall project goal is to collect event-based physical and chemical data sets for 10 agency-prioritized stream sampling sites in NE Minnesota for calculating pollutant loads and for incorporation into the overall State database for MPCA assessment purposes.

Cook
Koochiching
Lake
St. Louis
Recipient
RESPEC
2016 Fiscal Year Funding Amount
$79,972
Fund Source

The goal of this project is to calibrate, and validate three watershed models using the Hydrological Simulation Program FORTRAN (HSPF) model. The contractor will produce HSPF watershed models that can be further developed to provide information to support conventional parameter TMDLs. The contractor will clearly demonstrate that the models generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.

Aitkin
Carlton
Itasca
Kanabec
Mille Lacs
Pine