Minnesota's Legacy

All Projects

Showing 1 - 40 of 62 | Export projects
Recipient
Becker SWCD
2016 Fiscal Year Funding Amount
$254,897
Fund Source

With over 500 public water lakes in Becker County, we are blessed with abundant and diverse lake resources that, like those of much of lake country, are at risk of degradation due to increasing development pressures, redevelopment of non-conforming lots, rising stormwater runoff and land use changes within their watersheds.

Becker
Recipient
Carlton SWCD
2015 Fiscal Year Funding Amount
$32,330
Fund Source

The Conservation Dashboard will provide the Carlton Soil and Water Conservation District, its water plan, and local landowners a system to target, prioritize, and measure resource needs and effective conservation implementation within the subwatersheds of Carlton County. The Dashboard will identify where data gaps exist, translate the data in a way that partners and landowners easily understand, and insert Best Management Practice recommendations onto the county webmapping tool, used by citizens.

Carlton
Recipient
United States Geological Survey
2014 Fiscal Year Funding Amount
$175,000
Fund Source

Duluth area streams received over 10 inches of rainfall on June 19 and June 20, 2012. This "500 year event" provides a once in a lifetime opportunity to further understand sediment movement and stream channel alterations due to an event of this magnitude.

St. Louis
Recipient
Clearwater Soil and Water Conservation District
2014 Fiscal Year Funding Amount
$19,982
Fund Source

This project will provide the assessment of the chemical, physical, biological, and bacteriological integrity of surface waters.

Clearwater
Recipient
South St. Louis County Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$283,224
Fund Source

This project will provide fiscal resources for South St. Louis County Soil and Water Conservation District (SSLCSWCD) to participate and lead efforts to attain geomorphic data sets, dissolved oxygen assessments, culvert inventory, and civic engagement activities in three major watersheds, Nemadji River, South Lake Superior and St. Louis River. This work is currently being worked on as a part of the MPCA’s Watershed Restoration and Protection Planning efforts.

Carlton
Lake
St. Louis
Recipient
Minnesota Department of Health
2019 Fiscal Year Funding Amount
$1,100,000
2018 Fiscal Year Funding Amount
$1,100,000
2017 Fiscal Year Funding Amount
$1,100,000
2016 Fiscal Year Funding Amount
$1,100,000
2015 Fiscal Year Funding Amount
$1,150,000
2014 Fiscal Year Funding Amount
$1,150,000
2013 Fiscal Year Funding Amount
$1,020,000
2012 Fiscal Year Funding Amount
$1,020,000
2011 Fiscal Year Funding Amount
$744,717
2010 Fiscal Year Funding Amount
$250,291
Fund Source

The Drinking Water Contaminants of Emerging Concern (CEC) program identifies environmental contaminants for which current health-based standards currently do not exist or need to be updated, investigate the potential for human exposure to these chemicals, and develop guidance values for drinking water. Contaminants evaluated by CEC staff include contaminants that have been released or detected in Minnesota waters (surface water and groundwater) or that have the potential to migrate to or be detected in Minnesota waters.

Statewide
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$369,971
Fund Source

This project is the continuation of efforts to restore and protect watersheds and streams in Minnesota’s Lake Superior coastal region. The project provides the means to evaluate water quality impairments, complete pollutant source assessments, establish loading capacities and allocations for impairments, and to evaluate and recommend protection strategies for high quality water resources. It also leverages and encourages adoption of locally driven solutions to watershed management and protection.

Lake
St. Louis
Recipient
Tetra Tech
2016 Fiscal Year Funding Amount
$93,637
Fund Source

The goal of this project is to construct, calibrate, and validate one fine-scale Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Duluth Watershed Restoration and Protection Strategy (WRAPS) project area for the simulation period 1995–2012. In addition, an existing condition (post-2012 flood) model scenario will be developed for use in WRAPS development. The contractor will produce HSPF models that can readily be used to provide information to support conventional parameter TMDLs.

Carlton
St. Louis
Recipient
Tetra Tech
2013 Fiscal Year Funding Amount
$174,990
Fund Source

The goal of this project is to construct, calibrate, and validate three HSPF watershed models. The project will result in HSPF models that can readily be used to provide information to support conventional parameter TMDLs. The models are expected to generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.

St. Louis
Pine
Lake
Itasca
Carlton
Aitkin
Recipient
Tetra Tech
2014 Fiscal Year Funding Amount
$90,000
Fund Source

The goal of this project is to finalize HSPF watershed models for the St. Louis, Cloquet, and Nemadji Rivers.

Aitkin
Carlton
Itasca
Pine
St. Louis
Recipient
Houston Engineering
2015 Fiscal Year Funding Amount
$156,937
Fund Source

The goal of this project is to construct, calibrate, and validate two (2) watershed models using Hydrologic Simulation Program FORTRAN (HSPF).

Becker
Clay
Mahnomen
Norman
Recipient
Tetra Tech
2015 Fiscal Year Funding Amount
$110,000
Fund Source

Construct, calibrate and validate 3 Hydrologic Simulation Program FORTRAN (HSPF) watershed models for the St Louis, Cloquet, and Nemadji River Watersheds.

Aitkin
Carlton
Itasca
Pine
St. Louis
Recipient
Otter Tail, East SWCD
2017 Fiscal Year Funding Amount
$58,000
Fund Source

The purpose of this project is to identify effective irrigation and nutrient management best management practices and technologies and the barriers that prevent irrigators, producers, and other agricultural partners from adopting them in Otter Tail County. The primary goal is to reduce nitrate in areas where groundwater is susceptible to contamination as mapped by The Minnesota Department of Health by identifying effective BMPs and addressing the barriers to their adoption.

Becker
Douglas
Otter Tail
Todd
Wadena
Recipient
Clearwater SWCD
2015 Fiscal Year Funding Amount
$89,845
Fund Source

Pasture and hayland account for 62% of the agricultural land use in Clearwater County. In 2012, it was the 12th largest producer of beef cattle in Minnesota. In a county where 22% of pasture/hayland acres are within 300 feet of riparian areas, management practices need to be introduced that enhance rather than restrict the farm operations that use these zones for their livelihood. Clearwater County's Silver Creek and Ruffy Brook are currently listed as impaired by fecal coliform.

Clearwater
Recipient
Area 3 - Technical Service Area
2014 Fiscal Year Funding Amount
$250,000
Fund Source

Demand for Engineering services in Northeast Minnesota's nine-county Area III Technical Service Area is exceeding the capacity to deliver the needed services. There are increased requests from Soil and Water Conservation Districts for engineering needed to design and install Best Management Practices in part due to requests related to Clean Water Fund projects. These funds will be used to hire an engineer, which will increase engineering capacity and result in the completion of at least five additional projects per year.

Aitkin
Carlton
Cook
Kanabec
Lake
Mille Lacs
Pine
St. Louis
Recipient
Itasca County Soil and Water Conservation District
2014 Fiscal Year Funding Amount
$69,980
Fund Source

This project will develop, implement, and evaluate the impacts of co-developed civic engagement outcomes for the St. Louis River, Big Fork River, and Littlefork River watersheds.

Itasca
Recipient
Lake County Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$225,000
Fund Source

This project will gather watershed data necessary for the development of a comprehensive watershed management plan with parameter-specific thresholds that will maintain or improve water quality for the Kawishiwi Watershed.

Cook
Lake
St. Louis
Recipient
Lake SWCD
2015 Fiscal Year Funding Amount
$77,000
Fund Source

When completed, this Lake County-wide culvert inventory project will have multiple direct benefits to water quality protection, natural resource planning, and municipal asset protection. This inventory will be used to provide local and state authorities accurate information on the condition of road crossings, better calibrate hydrological modeling tools crucial to the inter-agency Watershed Restoration and Protection Strategies (WRAPS) process, and assess how road crossings in Lake County are affecting the water and sediment transport capacity of our waterways.

Lake
Recipient
South St. Louis County Soil and Water Conservation District
2013 Fiscal Year Funding Amount
$108,661
Fund Source

The goal of this project is to build the civic engagement capacity of local leaders, fostering water quality restoration in Northeastern Minnesota.

Carlton
Cook
Lake
St. Louis
Recipient
South Saint Louis County Soil and Water Conservation District
2015 Fiscal Year Funding Amount
$305,093
Fund Source

Improved levels of civic engagement and community participation in support for the Watershed Restoration and Protection Strategy (WRAPS) processes in the St. Louis River, Lake Superior South, and Cloquet River Watersheds. Monitoring plans and compiled field data will be provided and summarized that will aid in the future completion of Total Maximum Daily Load Reports (TMDLs) in these watersheds and in the Lake Superior North Watershed.

Cook
Lake
St. Louis
Recipient
St. Louis County
2016 Fiscal Year Funding Amount
$200,000
Fund Source

St. Louis County's Comprehensive Water Management Plan Update 2010-2020 identifies providing financial assistance to qualifying homeowners to upgrade or replace failing septic systems as a Priority 2 action. Funds from the FY-16 Clean Water Fund Projects and Practices Grant will be used to provide funding to low-income homeowners to repair or replace SSTS identified as Imminent Threat to Public Health (ITPH) within the following watersheds: Lake Superior South, St.

St. Louis
Recipient
Wild Rice Watershed District
2010 Fiscal Year Funding Amount
$175,000
Fund Source

This project is designed to reduce sediment in the Wild River River based on a state approved plan (TMDL). The estimated water quality benefits completed by this project are 12,980 (120 truckloads) tons of soil saved per year, which will assist in reducing turbidity impairments downstream on the LWRR.

Clearwater
Mahnomen
Norman
Recipient
Mahnomen SWCD
2014 Fiscal Year Funding Amount
$22,550
Fund Source

This project will complete an inventory of drainage systems to prioritize locations for structural erosion control practices and buffer strips that will reduce sediment loading into Marsh Creek and Lower Wild Rice River downstream, which are both impaired by turbidity. An inspection plan and database will also be developed to enhance the county drainage ditch inspection program.

Mahnomen
Recipient
St. Louis County
2017 Fiscal Year Funding Amount
$205,000
Fund Source

This project will create a culvert inventory database for county and township roads in the southwest portion of St. Louis County that contains the St. Louis River watershed. Data will be used by the County Public Works Department to identify and prioritize stream crossings in need of replacement or increasing upstream storm water retention to reduce the potential for culvert failure during large runoff events, factoring in stream health (fish habitat and passage, sediment transport and hydrologic connection) while protecting infrastructure.

St. Louis
Recipient
Minnesota Pollution Control Agency
2014 Fiscal Year Funding Amount
$297,169
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Pollution Control Agency
2015 Fiscal Year Funding Amount
$287,628
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Department of Natural Resources
2011 Fiscal Year Funding Amount
$140,000
Fund Source

The Minnesota Department of Natural Resources will coordinate the collection of high-resolution elevation data for northeastern portion of Minnesota using Light Detection and Ranging (LIDAR) systems. The geographic area of the work includes Minnesota counties of Carlton, Cook, Lake, and St. Louis Counties and that portion of Koochiching County that comprises Voyageurs National Park.

Carlton
Cook
Koochiching
Lake
St. Louis
Recipient
Otter Tail, East SWCD
2017 Fiscal Year Funding Amount
$471,000
Fund Source

The purpose of this project is to develop a detailed tool that can be used in all watersheds within the Otter Tail and Becker counties to prioritize, target, and measure implementation practices at the field scale. The PTM App will significantly increase the targeting capabilities in Otter Tail and Becker Counties. The Watershed Restoration and Protection Strategy has not been completed for Otter Tail County, yet, and the PTM App will be able to assist targeting and prioritizing when those documents are created.

Becker
Otter Tail
Recipient
University of Minnesota Natural Resources Research Institute
2014 Fiscal Year Funding Amount
$298,787
Fund Source

Minnesota Clean Water Funds will be used to complete a paleolimological study of the St. Louis River Estuary for the purpose of providing information critical to removing Beneficial Use Impairments in the St. Louis River Area of Concern.  This project will reconstruct the biological (algal load and composition), geochemical (organic and inorganic), sediment, and mercury chronology to identify historical temporal and spatial variations in the St. Louis River Estuary in order to better understand the natural and anthropogenic drivers related to beneficial use impairments for the St.

St. Louis
Recipient
Duluth Seaway Port Authority
2015 Fiscal Year Funding Amount
$24,000
Fund Source

The project’s first phase includes development and implementation of a sampling plan to investigate stormwater quality within impervious areas; soil borings to determine the soil type; a topographical survey to determine drainage patterns and infrastructure locations; and data gathering of existing infrastructure. A season-long stormwater quality monitoring program will monitor stormwater within the drainage areas that flow directly to the storm sewer, including monitoring of roof runoff and overland flow to determine potential pollutant sources and mitigation options.

St. Louis
Recipient
Red River Watershed Mgmt Board
2014 Fiscal Year Funding Amount
$235,250
Fund Source

The Prioritization, Targeting, and Measuring Water Quality Improvement Application (PTMA) connects the general qualitative strategies in a Total Maximum Daily Load (TMDL) and Watershed Restoration and Protection (WRAP) and the identification of implementable on-the-ground Best Management Practices (BMPs). Leveraging geospatial data from the International Water Institute this application will be developed for two pilot areas within the Red River Basin.

Becker
Cass
Clay
Grant
Mahnomen
Norman
Otter Tail
Traverse
Recipient
Otter Tail, West SWCD
2017 Fiscal Year Funding Amount
$54,800
Fund Source

Realizing the need for increased technical capacity in the field offices, the Becker, East Otter Tail and West Otter Tail Soil and Water Conservation Districts have developed an agreement that will increase technical capacity while minimizing costs to each district. The first step was taken in this agreement through the recent hire of a shared engineer. Currently, minimal survey grade equipment is owned by the districts. This grant will be used to purchase an integrated survey system.

Becker
Otter Tail
Recipient
Red River Watershed Mgmt Board
2014 Fiscal Year Funding Amount
$30,636
Fund Source

As part of the FY 2012 funding cycle, the Board of Water and Soil Resources granted funds for development of the Water Quality Decision Support Application (WQDSA). The WQDSA will provide land and water managers with geospatial data and online tools to prioritize, market, and implement actions on the landscape to achieve water quality objectives identified in local and state water plans and to ensure that public funding decisions are strategic and defensible.

Becker
Clay
Mahnomen
Norman
Polk
Recipient
Red River Watershed Management Board
2010 Fiscal Year Funding Amount
$346,000
Fund Source

This project will develop an effective transferable model to engage and educate watershed residents, stakeholders and others to better understand and protect watershed ecostystems through environmental monitoring, training, and formal and informal education programs in their local watershed. The project will build on the foundation of the existing Red River Basin River Watch program by strengthening three main activity areas: 1) curriculum integration and teacher training, 2) youth leadership and civic engagement, and 3) applied research collaboration and watershed science skills building.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Itasca
Kittson
Koochiching
Lake of the Woods
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Red River Watershed Management Board
2012 Fiscal Year Funding Amount
$200,000
Fund Source

MN Legislative Clean Water Fund funding to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data all for the benefit of water quality in the Red River Basin.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Kittson
Lake of the Woods
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Red River Watershed Management Board
2014 Fiscal Year Funding Amount
$100,000
Fund Source

The goal of this project is to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data for the benefit of water quality in the Red River Basin.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Red River Watershed Management Board
2015 Fiscal Year Funding Amount
$100,000
Fund Source

The goal of this project is to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data for the benefit of water quality in the Red River Basin.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Buffalo-Red River Watershed District
2016 Fiscal Year Funding Amount
$19,860
Fund Source

The purpose of this project is to improve understanding of primary productivity in the Red River and the diversity and population structure of the algal communities occurring along the river system. This will be accomplished through taxonomic identification of periphyton and phytoplankton assemblages necessary for characterizing responses to nutrient gradients along the Red River of the North.

Becker
Beltrami
Clay
Clearwater
Douglas
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Pope
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Aitkin SWCD
2015 Fiscal Year Funding Amount
$31,000
Fund Source

The Aitkin County Soil and Water Conservation District will partner with local lake associations and other eligible community partners to reduce the impacts of storm water runoff and retain water on the land. We will implement a mini-grant program that will install rain gardens and native vegetation buffers along shorelines using deep-rooted native vegetation that will filter runoff, promote infiltration, and control stormwater runoff and soil erosion.

Aitkin
Recipient
Minnesota Department of Natural Resources
2013 Fiscal Year Funding Amount
$170,601
Fund Source

The objective of this sampling plan is to quantify the inputs and outputs of methyl-mercury in the St. Louis River. Mercury can be bound to organic carbon or suspended solids; therefore, it is necessary to determine loadings of them as well. To get loadings, this sampling plan includes event and base flow monitoring at key tributaries to the St. Louis River and at stations within the St. Louis River.

Aitkin
Carlton
Lake
St. Louis