Minnesota's Legacy

All Projects

Showing 1 - 20 of 20 | Export projects
Recipient
Anoka Conservation District
2010 Fiscal Year Funding Amount
$400,000
Fund Source

A direct appropriation of $400,000 in FY 2010 for the Anoka Conservation District (ACD) is for the metropolitan landscape restoration program for water quality and improvement projects in the seven-county metro area (the law also provides $600,000 for this purpose in FY2011).

Anoka
Carver
Dakota
Hennepin
Ramsey
Scott
Washington
Recipient
Anoka Conservation District
2011 Fiscal Year Funding Amount
$600,000
Fund Source

A direct appropriation of $400,000 in FY 2010 and $600,000 in FY2011 for the Anoka Conservation District (ACD) is for the metropolitan landscape restoration program for water quality and improvement projects in the seven-county metro area.

Anoka
Carver
Dakota
Hennepin
Ramsey
Scott
Washington
Recipient
Anoka CD
2014 Fiscal Year Funding Amount
$42,987
Fund Source

This project will install new stormwater treatment practices in neighborhoods directly draining to Coon Lake. The objective is to remove phosphorus, which fuels algae growth, before the water is discharged into the lake. Seventeen potential project sites have been identified and ranked and include curb-cut rain gardens, swales, stabilizing stormwater discharge points, and a basin outlet modification.

Anoka
Recipient
Multiple Local Government Units
2011 Fiscal Year Funding Amount
$2,436,888
Fund Source

Currently, there are approximately 5,050 feedlots with fewer than 300 animal units that need to come into compliance with State feedlot rules. Clean Water Feedlot Water Quality Management Grant funds are being used to provide financial assistance to landowners with feedlot operations less than 300 animal units in size and located in a riparian area or impaired watershed.

Anoka
Brown
Dodge
Fillmore
Freeborn
Goodhue
Houston
Lyon
Mower
Nobles
Olmsted
Pope
Rice
Steele
Wabasha
Winona
Wright
Recipient
Anoka CD
2014 Fiscal Year Funding Amount
$88,590
Fund Source

This project will install an iron enhanced sand filter (IESF) to restore water quality in Golden Lake. Golden Lake is within a fully developed area of the Twin Cities, surrounded by residential land use, and the focal point of a city park. The IESF will achieve 11% of the phosphorus reduction (21 lbs/yr) required for Golden Lake to meet State water quality standards, as identified in the approved Total Maximum Daily Load (TMDL).

Anoka
Recipient
Anoka CD
2016 Fiscal Year Funding Amount
$60,000
Fund Source

Lake George is the premier recreational lake in Anoka County with above average water quality, a vibrant fishery, and a large regional park and beach that is among the most utilized in the county. Located in northwestern Anoka County within the Upper Rum River Watershed Management Organization (URRWMO), the Lake George Improvement District (LGID) was formed to tend to the lake's diminishing water quality and problematic invasive species.

Anoka
Recipient
Rice Creek WD
2019 Fiscal Year Funding Amount
$568,104
Fund Source

The Rice Creek Watershed District is proposing to improve water quality and habitat in Locke Lake and Lower Rice Creek by stabilizing stream banks and bluffs on Lower Rice Creek, reducing in-stream erosion and sediment delivery to Locke Lake, and improving in-stream habitat complexity for fish and invertebrates. Eleven bank stabilization practices would be installed over a continuous 5,400-foot reach in Lower Rice Creek. The anticipated outcome of this project is the prevention of 2,874 tons per year of sediment, which is 58% of the sediment reduction goals for Lower Rice Creek.

Anoka
Ramsey
Recipient
Coon Creek WD
2018 Fiscal Year Funding Amount
$195,158
Fund Source
Anoka
Recipient
Metro Conservation Districts
2012 Fiscal Year Funding Amount
$216,181
Fund Source

Through a long standing partnership, this project will continue to implement a process formalized with a 2010 Clean Water Fund Grant to conduct stormwater sub-watershed assessments. The goal of the sub-watershed assessments is to accelerate water quality improvements by focusing efforts in high priority areas. Specifically, subwatershed assessments are a tool used to identify the most effective urban stormwater conservation practice by location.

Anoka
Carver
Chisago
Dakota
Hennepin
Isanti
Ramsey
Scott
Sherburne
Washington
Wright
Recipient
Area 4 - Metropolitan SWCDs Technical Service Area
2019 Fiscal Year Funding Amount
$200,000
Fund Source

It is critical to train new staff, create modeling protocols for new BMPs, refine and calibrate models, and test ever-advancing modeling applications. The Metro Conservation District?s (MCD) Sub-Watershed Analysis (SWA) program provides these capacity-building services and unites efforts across 11 SWCDs. MCD proposes to analyze an additional 15 subwatersheds. The analyses will identify the location and estimated cost/benefit relationship for BMPs, evolve with new technology, and share discoveries metro-wide.

Anoka
Carver
Chisago
Dakota
Hennepin
Isanti
Ramsey
Scott
Sherburne
Washington
Wright
Recipient
Coon Creek WD
2019 Fiscal Year Funding Amount
$382,772
Fund Source

This project will reduce sediment and nutrient loading by 141 tons of sediment and 120 pounds of phosphorus annually while improving in-stream and riparian habitat by restoring a 2/3-mile corridor of Middle Sand Creek. This project expands upon the Lower Sand Creek Corridor Restoration project funded in part by a FY18 CWF grant and results in the restoration of over a mile of contiguous stream corridor.

Anoka
Recipient
Anoka Conservation District
2012 Fiscal Year Funding Amount
$339,700
Fund Source

Oak Glen Creek is immediately upstream of drinking water intakes for Minneapolis and St. Paul. When it rains, the runoff along Oak Glen Creek runs down bare soil cliffs that are 20 to 30 feet high, causing large amounts of sediment to erode into the creek and make its way to the Mississippi River. This corridor stabilization project will address multiple local and regional priorities and will benefit both cities source water projection efforts.

Anoka
Recipient
Anoka CD
2014 Fiscal Year Funding Amount
$517,780
Fund Source

This Oak Glen Creek stormwater pond expansion and enhancement using an iron enhanced sand filter (IESF) is a partnership between the Anoka Conservation District (ACD) and a private company to protect a downstream corridor stabilization and improve the quality of stormwater discharged to the Mississippi River. Very little stormwater infrastructure currently exists in the 573 acre Oak Glen Creek subwatershed, and it discharges 147,519 pounds of sediment and 353 pounds of phosphorus to the Mississippi River annually.

Anoka
Recipient
Anoka CD
2017 Fiscal Year Funding Amount
$467,968
Fund Source

Golden Lake does not meet state water quality standards due to high phosphorus levels. The proposed iron enhanced sand filter basin was identified in the Golden Lake Subwatershed Stormwater Retrofit Analysis to be one of the most cost effective remaining practices for reducing external phosphorus loads to Golden Lake. This project, paired with two previously installed upstream Best Management Practices, will achieve on average, 84% of the phosphorus reduction goal for the watershed.

Anoka
Recipient
Rice Creek WD
2014 Fiscal Year Funding Amount
$25,000
Fund Source

The Rice Creek Watershed District (RCWD) will create a web-based, mobile-compatible public drainage system inspection and maintenance database. This database system will enable District staff to create and track maintenance requests and inspections from the field, including Geo-referencing locations requiring repair via a mobile device. The system will greatly reduce the time required to identify and log each maintenance request, enabling staff to inventory more miles of public drainage system yearly thereby identifying erosion problems more efficiently and thoroughly.

Anoka
Hennepin
Ramsey
Washington
Recipient
Multiple Local Government Units
2011 Fiscal Year Funding Amount
$370,573
Fund Source

Successful long-term treatment of sewage depends on a system capable of providing adequate treatment and effective on-going operation and maintenance. Clean Water Fund Subsurface Sewage Treatment System (SSTS) Program Enhancement and Inventory funds are used by counties to strengthen programs dedicated to SSTS ordinance management and enforcement. These funds are used for a variety of tasks required to successfully implement a local SSTS program including inventories, enforcement, and databases to insure SSTS maintenance reporting programs.

Anoka
Beltrami
Cass
Faribault
Le Sueur
Rice
Todd
Recipient
Rice Creek Watershed District and City of Hugo
2012 Fiscal Year Funding Amount
$497,100
Fund Source

Bald Eagle Lake is a popular recreational lake known for its fishery on the Metropolitan Council's Priority Lakes List. The lake is negatively impacted by excess nutrients and restoring its water quality is a local priority.
This project will collect stormwater runoff from an approximately 900 acre area and re-use it to irrigate an existing golf course. This innovative project will provide a multitude of environmental benefits for Bald Eagle Lake including significant runoff volume reduction, groundwater recharge and phosphorus load reduction.

Anoka
Ramsey
Washington
Recipient
Anoka CD
2017 Fiscal Year Funding Amount
$236,000
Fund Source

The Mississippi River is currently listed as impaired for turbidity. Eroding riverbanks are one of the causes of this impairment. An inventory was completed in 2016 of riverbank condition along 5.8-miles of the Mississippi River that is within the City of Ramsey. In this inventory, ten severe to very severe eroding stretches spanning 27 private properties and 6,550 linear feet were identified. Cumulatively, these sites contribute 5,148 tons of sediment per year to the river.

Anoka
Recipient
Anoka CD
2018 Fiscal Year Funding Amount
$236,000
Fund Source
Anoka
Recipient
Coon Creek WD
2019 Fiscal Year Funding Amount
$376,093
Fund Source

In partnership with the City of Coon Rapids, the Coon Creek Watershed District will address Coon Creek?s aquatic life and recreation impairments by reducing nutrient and bacteria loading attributable to stormwater runoff from an 822-acre urban catchment. The project will retrofit an existing in-line rate control pond with a large iron-enhanced sand filter bench to target dissolved phosphorus, reducing TP loading to Coon Creek by 69 pounds per year. It will also incorporate bio-char into the filter media mixture to reduce E.

Anoka