Minnesota's Legacy

All Projects

Showing 1 - 40 of 79 | Export projects
Recipient
Dakota SWCD
2014 Fiscal Year Funding Amount
$300,000
Fund Source

This project targets retrofit stormwater Best Management Practices (BMPs) on public land to assist partnering Local Government Units (LGUs) achieve water quality goals identified in local stormwater plans. The Dakota County Soil and Water Conservation District (SWCD) provides technical assistance and distributes Clean Water Funding (CWF) to leverage local funding through its time-proven Stormwater Retrofit Partnership (Partnership) cost share program.

Dakota
Recipient
Dakota SWCD
2014 Fiscal Year Funding Amount
$100,000
Fund Source

This project is a continuation of the Dakota County Community Initiative, which has received Clean Water Funds in 2012 and 2013. It will provide cost share funding to organizations and associations who voluntarily construct medium sized water quality best management practices (BMPs) in Dakota County.

Dakota
Recipient
Dakota SWCD
2014 Fiscal Year Funding Amount
$150,000
Fund Source
Dakota
Recipient
Dakota SWCD
2015 Fiscal Year Funding Amount
$150,000
Fund Source

This project will use the Dakota County Soil and Water Conservation District's existing Conservation Initiative Funding program to provide technical assistance and monetary incentives for targeted, medium-sized projects such as raingardens, bioinfiltration, biofiltration, bioswales, shoreline stabilizations, and other best management practices (BMPs). Project proposals will be solicited from faith based organizations, homeowner associations, school organizations, lake associations, and others that own or manage large areas of land.

Dakota
Recipient
Vermillion River Watershed JPO
2017 Fiscal Year Funding Amount
$412,200
Fund Source

As part of the Dakota County Transportation Department's highway 78 road reconstruction project, the Vermillion River Watershed Joint Powers Organization is partnering with Dakota County to install a nitrate treatment practice on a tributary to the South Branch Vermillion River adjacent to the road. The South Branch Vermillion River subwatershed is the highest nitrate loading subwatershed in the Vermillion River Watershed and is a significant contributor to contaminated drinking water in the eastern portion of the watershed.

Dakota
Recipient
Farmers, Rural Landowners, and Agricultural Supply Businesses
2020 Fiscal Year Funding Amount
$75,000
2019 Fiscal Year Funding Amount
$75,000
2018 Fiscal Year Funding Amount
$75,000
2017 Fiscal Year Funding Amount
$75,000
2016 Fiscal Year Funding Amount
$75,000
2015 Fiscal Year Funding Amount
$200,000
2014 Fiscal Year Funding Amount
$200,000
2013 Fiscal Year Funding Amount
$4,500,000
2012 Fiscal Year Funding Amount
$4,500,000
2011 Fiscal Year Funding Amount
$2,500,000
2010 Fiscal Year Funding Amount
$2,000,000
Fund Source

The AgBMP Loan Program provides needed funding for local implementation of clean water practices at an extremely low cost, is unique in its structure, and is not duplicated by any other source of funding. The AgBMP loan program provides 3% loans through local lenders to farmers, rural landowners, and agriculture supply businesses. Funds are used for proven practices that prevent non-point source water pollution or solve existing water quality problems.

Anoka
Becker
Blue Earth
Brown
Carver
Clearwater
Cook
Cottonwood
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Houston
Hubbard
Jackson
Kandiyohi
Kittson
Lac qui Parle
Le Sueur
Lincoln
Lyon
Marshall
Martin
Morrison
Mower
Murray
Nicollet
Nobles
Olmsted
Otter Tail
Pipestone
Pope
Redwood
Renville
Rice
Rock
Roseau
Scott
Sherburne
Sibley
St. Louis
Stearns
Steele
Stevens
Todd
Traverse
Wabasha
Waseca
Washington
Watonwan
Winona
Yellow Medicine
Recipient
Braun Intertec
2017 Fiscal Year Funding Amount
$80,687
2018 Fiscal Year Funding Amount
$17,828
Fund Source

This project will complete the installation of four nested wells to the Ambient Groundwater Monitoring Network and relocated one well in the City of Saint Paul. Braun Intertec will coordinate site access and oversee the well installation by a state drilling contractor.

Anoka
Hennepin
Ramsey
Recipient
Peer Engineering
2014 Fiscal Year Funding Amount
$115,910
Fund Source

Peer Engineering, Inc. (Peer) will evaluate and recommend to MPCA groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration. Superfund staff will assist in the project by providing oversight of contractual requirements and provide technical assistance as needed.

Dakota
Hennepin
Mower
Rice
Washington
Recipient
Minnesota Humanities Center
2018 Fiscal Year Funding Amount
$150,000
Fund Source

The goal of this project is to use the We Are Water MN exhibit and their technical knowledge in relationship-building and storytelling to increase community capacity for sustainable watershed management in the Cannon River, Cedar River, Mississippi-Headwaters, Mississippi-Grand Rapids, Mississippi-Twin Cities, Red Lake River, Rum River and St. Louis River watersheds.

Benton
Carlton
Dakota
Hennepin
Itasca
Mille Lacs
Mower
Polk
Recipient
Metropolitan Council-Environmental Services
2013 Fiscal Year Funding Amount
$405,500
Fund Source

This project will provide condition monitoring and problem investigation monitoring at the following sites.
Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek.
Minnesota River: Tributaries include Eagle Creek,Riley Creek, and Valley Creek tributary to the St. Croix River

Anoka
Benton
Carver
Chisago
Dakota
Hennepin
Isanti
Le Sueur
McLeod
Meeker
Mille Lacs
Morrison
Nicollet
Pine
Ramsey
Renville
Rice
Scott
Sherburne
Sibley
Stearns
Washington
Wright
Recipient
Wenck Associates, Inc.
2012 Fiscal Year Funding Amount
$4,811
Fund Source

This project will support updates to the Draft Bald Eagle Lake TMDL. The updates will address comments received during the public comment period. The comments resulted in the development of individual Wasteload Allocations for stormwater sources in the Bald Eagle Lake watershed.

Anoka
Dakota
Hennepin
Ramsey
Washington
Recipient
Shingle Creek WMC
2018 Fiscal Year Funding Amount
$267,040
Fund Source
Hennepin
Recipient
Bassett Creek WMC
2017 Fiscal Year Funding Amount
$400,000
Fund Source

The Plymouth Creek Restoration Project will improve water quality in Plymouth Creek and Medicine Lake, the creek's primary receiving water. The project will reduce total phosphorus and suspended sediment in Plymouth Creek and Medicine Lake stemming from streambank erosion. Streambank erosion is a common source of pollution, particularly in developed landscapes where flows in streams are considered flashy and can easily scour unprotected and disturbed streambanks.

Hennepin
Recipient
Bassett Creek WMC
2017 Fiscal Year Funding Amount
$134,595
Fund Source

This project engages private property owners including non-profits, businesses, and institutions, in the Harrison Neighborhood of Near North Minneapolis to install storm water best management practices. The BMPs will reduce pollution in Bassett Creek including chlorides and bacteria, for which the creek is impaired. The primary focus is on Glenwood Avenue, a focal point in the community and a highly impervious area.

Hennepin
Recipient
Shingle Creek WMC
2016 Fiscal Year Funding Amount
$725,000
Fund Source

Installation of a 43,000 sf infiltration gallery in Becker Park in the City of Crystal to infiltrate 0.5 inches of runoff from a 147 acre currently untreated mixed use subwatershed with 51% impervious surface. The project will reduce total phosphorus to Impaired Water Upper Twin Lake by 118 pounds annually, and reduce street flooding on Bass Lake Road (Hennepin County Road 10).

Hennepin
Recipient
Bassett Creek WMC
2020 Fiscal Year Funding Amount
$400,000
Fund Source
Hennepin
Recipient
Mower County Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$99,929
Fund Source

This project will place the Cedar River watershed on a sustainable and clearly understood implementation process for comprehensive water management. All people living in the watershed and all groups operating and managing land in the watershed, are responsible stakeholders in the effort. Objectives for this phase of the project include:
1. Develop a comprehensive watershed restoration and protection strategy.
2. Continue development of a more coordinated and comprehensive citizen participation process.

Dodge
Freeborn
Mower
Steele
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$40,000
Fund Source
There are two main goals of this Cedar Basin HSPF project, A. Overall development of the HSPF model in the Cedar Basin of Minnesota; and B. Shell Rock River nutrient, DO , impairment modeling and TMDL completion.
Dodge
Freeborn
Mower
Steele
Recipient
Emmons & Olivier Resources Inc
2017 Fiscal Year Funding Amount
$34,959
Fund Source

This project will guide local implementation planning efforts by identifying water quality goals, strategies, and implementation milestones in the Cedar River Watershed. This watershed includes 435 square miles in major portions of Mower, Freeborn and Dodge Counties, and incudes the regional center of Austin. A Watershed Restoration and Protection Strategy (WRAPS) report will be completed by this effort.

Dodge
Freeborn
Mower
Recipient
Barr Engineering Co
2017 Fiscal Year Funding Amount
$48,510
Fund Source

This project is for the Cedar River Watershed, which includes major portions of Mower, Freeborn and Dodge Counties in southern Minnesota. The scope of this project is to complete the Total Maximum Daily Load (TMDL) studies for 11 stream reaches with sediment impairments, and 14 stream reaches for bacteria impairments. The major product of this effort will be the final Cedar River TMDL report, which will be submitted to the United States Environmental Protection Agency, and public-noticed by the Minnesota Pollution Control Agency.

Dodge
Freeborn
Mower
Recipient
Lower Mississippi River WMO
2018 Fiscal Year Funding Amount
$700,000
Fund Source
Dakota
Ramsey
Recipient
City of Roseville
2013 Fiscal Year Funding Amount
$100,000
Fund Source

The Villa Park Wetland Restoration Project proposes sediment removal from 6 contiguous stormwater wetland treatment cells within the Villa Park Wetland system resulting in an additional 118lbs/yr of total phosphorus(TP) removal from water entering Lake McCarrons.

Anoka
Carver
Dakota
Hennepin
Ramsey
Sherburne
Washington
Wright
Recipient
Minnetonka, City of
2014 Fiscal Year Funding Amount
$129,200
Fund Source

The City of Minnetonka and its residents highly value the water resources within the community, which include approximately ten lakes, four streams, and hundreds of wetlands. The City has been progressive in protecting these resources through policies and management strategies, and now wants to increase their on-the-ground efforts in protecting and improving water quality. The City hopes to conduct targeted watershed assessments for fourteen selected priority water bodies to identify and optimize the type and locations of Best Management Practices (BMPs) to be installed.

Hennepin
Recipient
Shingle Creek WMC
2014 Fiscal Year Funding Amount
$200,000
Fund Source

This project is the ecological restoration of 1,400 feet of Shingle Creek, an Impaired Water for low dissolved oxygen and impaired biota, in Brooklyn Center and Brooklyn Park. The Shingle Creek Impaired Biota and Dissolved Oxygen Total Maximum Daily Load requires sediment oxygen demand load reductions and establishes restoration design standards to enhance habitat that will be incorporated into this project.

Hennepin
Recipient
Minnehaha Creek WD
2014 Fiscal Year Funding Amount
$483,000
Fund Source

The Cottageville Park Water Quality Protection and Stream Restoration Project was developed to meet the goals of the Minnehaha Creek Watershed District and the City of Hopkins, including; water resource management, channel stabilization, stream enhancement, riparian corridor improvements, open space creation, park development, and revitalization. The project achieves these goals through implementation of the following:

Hennepin
Recipient
Mower County Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$182,020
Fund Source

This project will build upon existing planning and implementation efforts already taken on in the project area. The collection of existing information will be used to complement water information in support of a more successful and sustainable water quality improvement and protection implementation program. This will be achieved by active civic engagement activities throughout Phase I of this project.

Dodge
Freeborn
Mower
Steele
Recipient
Lower Mississippi River Watershed Management Organization (LMRWMO)
2012 Fiscal Year Funding Amount
$189,999
2013 Fiscal Year Funding Amount
$29,995
Fund Source

This project will complete a comprehensive study, following a rational, step-wise process of data analysis, response modeling and comparison to the water quality standards, followed by impairment diagnosis, modeling of improvement and protection options, and development of a WRAP Report and Implementation Plan for Sunfish lake, Thompson lake, Pickerel lake, and Rogers lake.

Anoka
Carver
Dakota
Hennepin
Ramsey
Sherburne
Washington
Wright
Recipient
Emmons & Olivier Resources
2013 Fiscal Year Funding Amount
$99,355
Fund Source

This project will complete a pollutant source identification and subwatershed information report and support the development of a Draft Restoration and Protection Plan (RAPP). It will also support the devlopment of a Implementation Plan that will identify target areas for BMP implementation for bacteria reductions.

Anoka
Benton
Carver
Crow Wing
Dakota
Douglas
Hennepin
Kandiyohi
McLeod
Meeker
Mille Lacs
Morrison
Pope
Ramsey
Sherburne
Sibley
Stearns
Todd
Washington
Wright
Recipient
Coon Creek Watershed District
2013 Fiscal Year Funding Amount
$252,200
Fund Source

This project will provide the MPCA, CCWD, and all other stakeholders the information and tools necessary to improve the water quality within Coon Creek Watershed District. The improvements will take place using targeted activities throughout the watershed to reduce the primary biological and chemical stressors. In turn, the reduction of these stressors will help to reduce overall loadings of sediment, turbidity, total phosphorus, and E. coli bacteria.

Anoka
Carver
Dakota
Hennepin
Ramsey
Sherburne
Washington
Wright
Recipient
Emmons and Oliver Resources, Inc.
2013 Fiscal Year Funding Amount
$22,012
Fund Source

The goal of this project is to develop a phosphorus TMDL for the six impaired lakes in the southwest portion of the Rice Creek Watershed District; Island Lake, Little Lake Johanna, Long Lake, East Moore Lake, Pike Lake and Lake Valentine.

Anoka
Carver
Dakota
Hennepin
Ramsey
Sherburne
Stearns
Wright
Recipient
Dodge SWCD
2016 Fiscal Year Funding Amount
$50,625
Fund Source

Nitrogen is a serious problem in Minnesota's Mississippi River Basin and the Dodge Soil and Water Conservation District (SWCD) will address this problem through saturated buffers. Nitrates have been linked to adverse health effects, and nitrogen is the leading cause of the dead zone in the Gulf of Mexico. Agriculture drainage through the use of tile drainage systems have been identified as the number one leading source of nitrogen in the Mississippi River Basin.

Dodge
Recipient
Elm Creek WMC
2017 Fiscal Year Funding Amount
$200,000
Fund Source

Fish Lake is 238 acres and does not meet state water quality standards due to excessive nutrients. Through the Total Maximum Daily Load study, a recommendation was made to treat the lake with alum to achieve the state's water quality standards. The goal of this project is to reduce the phosphorus load to Fish Lake by 310 pounds per year and meet the needed phosphorus reduction goal. The project will be completed as a partnership between the Elm Creek Water Management Commission, Three Rivers Park District, the City of Maple Grove, and The Fish Lake Area Resident's Association.

Hennepin
Recipient
Aqua Terra Consultants
2013 Fiscal Year Funding Amount
$36,848
Fund Source

This project will maximize the utility and usefulness of three HSPF models that have been constructed and calibrated for hydrology. The contractor will identify and reduce parameterization errors in the following three HSPF models: 1) Buffalo River Watershed, 2 ) Thief River Watershed, 3) Bois de Sioux-Mustinka Watersheds. This will result, not only in a better hydrology calibration, but will also improve each of the models’ ability to more accurately estimate sediment and pollutant loads and concentrations.

Becker
Beltrami
Big Stone
Clay
Grant
Marshall
Otter Tail
Pennington
Roseau
Stevens
Traverse
Wilkin
Recipient
City of Golden Valley
2011 Fiscal Year Funding Amount
$61,577
Fund Source

The GVCC Pond Excavation Project will remove approximately 2,500 cubic yards of accumulated polycyclic aromatic hydrocarbons (PAH) Level/Tier 3 contaminated sediment from the Golden Valley Country Club stormwater treatment pond.

Hennepin
Recipient
LimnoTech
2019 Fiscal Year Funding Amount
$11,920
Fund Source

The goal of this project is to finalize the Lake Pepin Watershed phosphorus total maximum daily load (TMDL) report by using the existing information and documentation prepared under previous contracts to prepare one TMDL report that addresses the impairments on the mainstem of the Mississippi River. Information developed to date for draft TMDLs on the Minnesota River mainstem will be documented for later use by the Minnesota Pollution Control Agency.

Anoka
Blue Earth
Brown
Carver
Chippewa
Cottonwood
Dakota
Goodhue
Hennepin
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
McLeod
Nicollet
Ramsey
Redwood
Renville
Rice
Scott
Sibley
Wabasha
Washington
Yellow Medicine
Recipient
LimnoTech
2016 Fiscal Year Funding Amount
$62,280
Fund Source

The goal of this project is to prepare a draft Lake Pepin Total Maximum Daily Load (TMDL) Report. Lake Pepin is impaired by high levels of nutrients that cause excessive growth of algae.

Dakota
Goodhue
Scott
Wabasha
Recipient
Lower Mississippi River WMO
2016 Fiscal Year Funding Amount
$196,000
Fund Source

Lake Augusta and Sunfish Lake are deep lakes located in the Lower Mississippi River Watershed Management Organization. Both lakes are approximately 40 acres in size and surrounded by watersheds with moderate to low imperviousness. Both lakes are included on the MPCA's 303(d) list as impaired for aquatic recreation due to excessive nutrients. Lake Augusta and Sunfish Lake were included in a watershed restoration and protection strategies (WRAPS) study and total maximum daily load (TMDL) performed from 2012 to 2014.

Dakota
Recipient
Metropolitan Council Environmental Services
2018 Fiscal Year Funding Amount
$176,657
2019 Fiscal Year Funding Amount
$123,343
Fund Source

The Minnesota Pollution Control Agency’s (MPCA) Watershed Pollutant Load Monitoring Network (WPLMN) forms the core of a long-term program designed to measure and compare regional differences and trends in pollutant loadings from Minnesota’s mainstem rivers and the outlets of major watersheds and subwatersheds draining to these rivers.

Hennepin
Recipient
Metropolitan Council
2010 Fiscal Year Funding Amount
$326,500
Fund Source

This project will provide condition monitoring and problem investigation monitoring at the following sites. Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek. Minnesota River: Tributaries include Eagle Creek, Riley Creek, and Willow Creek. St. Croix River: Tributary includes Valley Creek.

Wright
Washington
Stearns
Sibley
Sherburne
Scott
Rice
Renville
Pine
Nicollet
Morrison
Mille Lacs
Meeker
McLeod
Le Sueur
Isanti
Hennepin
Dakota
Chisago
Carver
Benton
Anoka
Recipient
Shingle Creek WMC
2017 Fiscal Year Funding Amount
$38,000
Fund Source

The purpose of this project is to conduct a subwatershed assessment of that part of the City of Minneapolis that is within the Shingle Creek watershed. This subwatershed drains to three Impaired Waters: Crystal Lake, Ryan Lake, and Shingle Creek. The assessment will identify the most feasible and cost-effective best management practices for retrofit in this densely urban, fully developed subwatershed. The project includes workshops with neighborhood organizations to help them educate residents and organize implementation projects.

Hennepin