Minnesota's Legacy

All Projects

Showing 1 - 40 of 123 | Export projects
Recipient
Fillmore Soil and Water Conservation District
2013 Fiscal Year Funding Amount
$92,464
Fund Source

This project will obtain spatial and long-term pollutant load information from the Root River watershed in Southeast Minnesota. To accomplish this, the Fillmore Soil and Water Conservation District (SWCD) will assist the MPCA with water quality monitoring and annual pollutant loading calculations. Approximately 25 grab samples will be collected/site/year at 5 sites within the Root River watershed (totaling 125 grab samples/year). Annual load calculations for each site will be determined using the FLUX32 model.

Dodge
Fillmore
Houston
Mower
Olmsted
Winona
Recipient
Lake County Soil & Water Conservation District
2013 Fiscal Year Funding Amount
$25,930
Fund Source

The primary goal of this project is to accurately collect surface water quality data to help support the MPCA’s Intensive Watershed Monitoring efforts in the Lake Superior North Watershed.

Lake
Recipient
Aitkin County SWCD
2013 Fiscal Year Funding Amount
$5,973
Fund Source

The goal of the project is to complete the dataset for the assessment of Aquatic Recreation Use in Cedar Lake by monitoring total phosphorus, chlorophyll-a, and secchi depth.

Aitkin
Recipient
Peer Engineering
2014 Fiscal Year Funding Amount
$115,910
Fund Source

Peer Engineering, Inc. (Peer) will evaluate and recommend to MPCA groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration. Superfund staff will assist in the project by providing oversight of contractual requirements and provide technical assistance as needed.

Dakota
Hennepin
Mower
Rice
Washington
Recipient
Braun Intertec
2017 Fiscal Year Funding Amount
$80,687
2018 Fiscal Year Funding Amount
$17,828
Fund Source

This project will complete the installation of four nested wells to the Ambient Groundwater Monitoring Network and relocated one well in the City of Saint Paul. Braun Intertec will coordinate site access and oversee the well installation by a state drilling contractor.

Anoka
Hennepin
Ramsey
Recipient
Minnesota Humanities Center
2018 Fiscal Year Funding Amount
$150,000
Fund Source

The goal of this project is to use the We Are Water MN exhibit and their technical knowledge in relationship-building and storytelling to increase community capacity for sustainable watershed management in the Cannon River, Cedar River, Mississippi-Headwaters, Mississippi-Grand Rapids, Mississippi-Twin Cities, Red Lake River, Rum River and St. Louis River watersheds.

Benton
Carlton
Dakota
Hennepin
Itasca
Mille Lacs
Mower
Polk
Recipient
City of Elk River
2011 Fiscal Year Funding Amount
$285,087
Fund Source

Great River Energy (GRE) operates a power plant in the City of Elk River which generates electricity by incinerating municipal solid wastes. The plant is located proximate to the City of Elk River wastewater treatment plant (WWTP). This project will result in a corresponding reduction of groundwater use by GRE.

Sherburne
Recipient
Cook County SWCD
2018 Fiscal Year Funding Amount
$120,000
Fund Source

This project is for Watershed Restoration and Protection Strategy (WRAPS) development in the Rainy River Headwaters watershed. The recipient will provide support for outreach and engagement in Rainy River Headwaters and Lake Superior North watersheds. They will also support watershed gap monitoring and Minnesota Pollution Control Agency (MPCA) gage monitoring.

Cook
Recipient
Cook County Soil and Water Conservation District
2014 Fiscal Year Funding Amount
$17,905
Fund Source

Cook County Soil and Water Conservation District (Cook SWCD) will be working with up to four volunteers in the Rainy River Watershed Headwaters to monitor the Cross River during 2014 and 2015.The area of the stream being monitored is located 45 miles north of Grand Marais, MN. The area is remote and travel is slow to the stream. It is an area that was affected by fires with vegetation in the beginning years of succession. There are lodges, resorts and residents scattered throughout the area. The parameters monitored are set by the MPCA, along with the frequency of sampling.

Cook
Recipient
Cook County Soil and Water Conservation District
2015 Fiscal Year Funding Amount
$123,980
Fund Source

The goal of this project is to develop and complete the Watershed Restoration and Protection (WRAP) process and report, while also enlarging and sustaining a public participation process that encourages local ownership of water quality problems and solutions (civic engagement).
Civic engagement strategies including education public participation in watershed work and expanded knowledge, technical input into and review of stressor id process and report, Total Maximum Daily Load (TMDL) reports, implementation plans and protecion strategies.

Cook
Lake
Recipient
Cook County SWCD
2017 Fiscal Year Funding Amount
$3,834
Fund Source

The project work for this effort includes watershed wide civic engagement and technical support to the final years of Watershed Restoration And Protection Strategy (WRAPS) work. Communication to stakeholders and other key civic based activities to share WRAPS information will be completed. The Cook County Soil and Water Conservation District (SWCD) will also provide technical support to aid completion of the Total Maximum Daily Load (TMDL) report and help define protection and restoration strategies for the watershed.

Cook
Recipient
Crow Wing Soil and Water Conservation District (SWCD)
2013 Fiscal Year Funding Amount
$14,987
Fund Source

The project will include lake monitoring on three (3) lakes found in the Rum River watershed in southeastern Crow Wing County (CWC). The project will be conducted in an effort to gain sufficient data on these data-deficient lake sites. All of the proposed monitoring sites are target sites for 2013-2014. One of the goals of the CWC Local Comprehensive Water Plan (CWP) is to establish a countywide Comprehensive Monitoring Plan (CMP).

Aitkin
Anoka
Benton
Chisago
Crow Wing
Isanti
Kanabec
Mille Lacs
Morrison
Sherburne
Recipient
University of Minnesota
2011 Fiscal Year Funding Amount
$33,414
Fund Source

This project will identify and compile existing nitrate data from groundwaters and surface waters in the Lower Mississippi Basin (LMB) generally and focus on the Root River Watershed. The purpose is to investigate the quantity and quality of existing nitrate data, and to organize it for use in comprehensive watershed strategy development (including assessment, TMDL computation and identification and study of nitrate sources and delivery mechanisms).

Dodge
Fillmore
Houston
Mower
Olmsted
Winona
Recipient
South St. Louis County Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$283,224
Fund Source

This project will provide fiscal resources for South St. Louis County Soil and Water Conservation District (SSLCSWCD) to participate and lead efforts to attain geomorphic data sets, dissolved oxygen assessments, culvert inventory, and civic engagement activities in three major watersheds, Nemadji River, South Lake Superior and St. Louis River. This work is currently being worked on as a part of the MPCA’s Watershed Restoration and Protection Planning efforts.

Carlton
Lake
St. Louis
Recipient
Southeast Minnesota Water Resources Board-Winona State University
2012 Fiscal Year Funding Amount
$80,737
Fund Source

This project will build network and the skill set of local resource professionals to do effective civic engagement work for water restoration and protection in Southeast Minnesota. The cohort will be administered through the Southeast Minnesota Water Resources Board (SE MN WRB) which is an area wide Joint Powers Board (JPB) established to help improve and protect the water resources of the area through coordinating local water planning efforts. This JPB has successfully administered water quality grants in the past that have positively impacted the water resources of this region.

Blue Earth
Dakota
Dodge
Fillmore
Freeborn
Goodhue
Houston
Le Sueur
Mower
Olmsted
Rice
Scott
Steele
Wabasha
Waseca
Washington
Winona
Recipient
Cook County Soil & Water Conservation District
2013 Fiscal Year Funding Amount
$55,999
Fund Source

Civic engagement is the primary goal of this project and will focus on 1) building knowledge about the watershed approach among Lake Superior-North watershed residents, 2) building a communication network to exchange knowledge, 3) building a sense of shared concern about watershed related issues through events, workshops, forums or other organized activities, and 4) building a trusted foundation for future water related work among a group of new collaborators.

Cook
Lake
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$249,932
Fund Source

This project will construct, calibrate, a set of HSPF watershed models covering the entire area of the Lake of the Woods drainage, including the Rainy River watershed. The consultant will produce HSPF models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will clearly demonstrate that these models generate predicted output timeseries for hydrology which are consistent with available sets of observed data.

Koochiching
Lake of the Woods
Roseau
St. Louis
Recipient
Minnesota Department of Health
2019 Fiscal Year Funding Amount
$1,100,000
2018 Fiscal Year Funding Amount
$1,100,000
2017 Fiscal Year Funding Amount
$1,100,000
2016 Fiscal Year Funding Amount
$1,100,000
2015 Fiscal Year Funding Amount
$1,150,000
2014 Fiscal Year Funding Amount
$1,150,000
2013 Fiscal Year Funding Amount
$1,020,000
2012 Fiscal Year Funding Amount
$1,020,000
2011 Fiscal Year Funding Amount
$744,717
2010 Fiscal Year Funding Amount
$250,291
Fund Source

The Drinking Water Contaminants of Emerging Concern (CEC) program identifies environmental contaminants for which current health-based standards currently do not exist or need to be updated, investigate the potential for human exposure to these chemicals, and develop guidance values for drinking water. Contaminants evaluated by CEC staff include contaminants that have been released or detected in Minnesota waters (surface water and groundwater) or that have the potential to migrate to or be detected in Minnesota waters.

Statewide
Recipient
Tetra Tech
2016 Fiscal Year Funding Amount
$93,637
Fund Source

The goal of this project is to construct, calibrate, and validate one fine-scale Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Duluth Watershed Restoration and Protection Strategy (WRAPS) project area for the simulation period 1995–2012. In addition, an existing condition (post-2012 flood) model scenario will be developed for use in WRAPS development. The contractor will produce HSPF models that can readily be used to provide information to support conventional parameter TMDLs.

Carlton
St. Louis
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$369,971
Fund Source

This project is the continuation of efforts to restore and protect watersheds and streams in Minnesota’s Lake Superior coastal region. The project provides the means to evaluate water quality impairments, complete pollutant source assessments, establish loading capacities and allocations for impairments, and to evaluate and recommend protection strategies for high quality water resources. It also leverages and encourages adoption of locally driven solutions to watershed management and protection.

Lake
St. Louis
Recipient
Tetra Tech
2019 Fiscal Year Funding Amount
$115,553
Fund Source

This project will respond to public notice comments received after a 2nd comment opportunity and several requests for changes to the Total Maximum Daily Load (TMDL) report and petition for contested case hearings (CCH). Additional review work must be completed and if necessary, edits or updates to the TMDL and Watershed Restoration and Protection Strategy (WRAPS) reports. If there are substantial changes to both documents another public noticing will be necessary.

St. Louis
Recipient
University of Minnesota
2019 Fiscal Year Funding Amount
$116,081
Fund Source

This project continues the total maximum daily load (TMDL) and watershed restoration and protection strategies (WRAPS) process for the Duluth Metropolitan Area (DMA).  The DMA is defined by water, sitting at the juncture of Lake Superior and the St. Louis River Estuary, and surrounded by semi-mountainous terrain. The project serves as a bridge into the next phase of restoration and protection identified by the Duluth Urban Stream TMDLs and WRAPS. In the first phase of community engagement, a collaborating organization was formed to define a framework for the DMA communities.

St. Louis
Recipient
City of Duluth
2019 Fiscal Year Funding Amount
$99,966
Fund Source

Several streams within the Duluth metropolitan area are identified as impaired and are included on Minnesota’s Impaired Waters List, with impairments to Aquatic Recreation, due to levels of Escherichia coli (E. coli) bacteria. Total Maximum Daily Load (TMDL) studies have been completed (draft) for these impairments, including Keene Creek and Tischer Creek. The goal of this project  is for the City of Duluth to provide the Minnesota Pollution Control Agency (MPCA) with information on the sources of E.

St. Louis
Recipient
Tetra Tech
2019 Fiscal Year Funding Amount
$113,539
Fund Source

Four beaches along the North Shore of Lake Superior and within the Duluth Harbor have aquatic recreation impairments due to high concentrations of E. coli, a bacterial indicator of fecal contamination. The project area includes portions of the Lake Superior South and St. Louis River watersheds near Duluth. Several of the beaches are also listed as impaired for beneficial use (due to fecal bacteria) as part of the St. Louis River Area of Concern.

St. Louis
Recipient
Regents of the University of Minnesota
2016 Fiscal Year Funding Amount
$135,061
2018 Fiscal Year Funding Amount
$49,040
2019 Fiscal Year Funding Amount
$34,240
Fund Source

Minnesota Pollution Control Agency (MPCA) Watershed Pollutant Load Monitoring Network (WPLMN) requests assistance from local partners to collect samples and field data at designated stream monitoring sites for the purpose of assessing water quality and calculating annual pollutant loads.

Lake
St. Louis
Recipient
Tetra Tech
2013 Fiscal Year Funding Amount
$174,990
Fund Source

The goal of this project is to construct, calibrate, and validate three HSPF watershed models. The project will result in HSPF models that can readily be used to provide information to support conventional parameter TMDLs. The models are expected to generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.

St. Louis
Pine
Lake
Itasca
Carlton
Aitkin
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$253,710
Fund Source

The goal of this project is to construct, calibrate, and validate five Hydrologic Simulation Program FORTRAN (HSPF) watershed models. The outcome will be HSPF models that can readily be used to provide information to support conventional parameter TMDLs. These models will generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.

Wright
Todd
Stearns
St. Louis
Sherburne
Morrison
Mille Lacs
Meeker
Kanabec
Itasca
Isanti
Chisago
Cass
Carlton
Benton
Anoka
Aitkin
Recipient
University of Minnesota
2011 Fiscal Year Funding Amount
$73,563
Fund Source

This project will study the geologic controls on nitrate transport in southeast Minnesota's karst landscape and will also provide datasets for other projects over time.

Dodge
Fillmore
Houston
Mower
Olmsted
Winona
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$250,000
Fund Source

The goal of this project is to complete the calibration/validation process of Hydrologic Simulation FORTRAN (HSPF) watershed models for the Lake of the Woods/Rainy River Basin.

Cook
Koochiching
Lake
Lake of the Woods
Roseau
St. Louis
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$396,300
Fund Source

The goal of this project is to continue and finalize HSPF watershed model construction and complete the calibration/validation process.

Aitkin
Anoka
Becker
Beltrami
Benton
Carlton
Cass
Clearwater
Crow Wing
Hubbard
Isanti
Itasca
Kanabec
Meeker
Mille Lacs
Morrison
Sherburne
St. Louis
Stearns
Todd
Wright
Recipient
Tetra Tech
2014 Fiscal Year Funding Amount
$90,000
Fund Source

The goal of this project is to finalize HSPF watershed models for the St. Louis, Cloquet, and Nemadji Rivers.

Aitkin
Carlton
Itasca
Pine
St. Louis
Recipient
Tetra Tech
2015 Fiscal Year Funding Amount
$115,000
Fund Source
The goal of this project is to construct, calibrate, and validate two Hydrologic Simulation Program FORTRAN (HSPF) watershed models: Lake Superior North and Lake Superior -South. The contractor will produce HSPF models that can readily be used to provide information to support conventional parameter Total Maximum Daily Loads (TMDLs). The contractor will clearly demonstrate that these models generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.
Cook
Lake
St. Louis
Recipient
Tetra Tech
2015 Fiscal Year Funding Amount
$110,000
Fund Source

Construct, calibrate and validate 3 Hydrologic Simulation Program FORTRAN (HSPF) watershed models for the St Louis, Cloquet, and Nemadji River Watersheds.

Aitkin
Carlton
Itasca
Pine
St. Louis
Recipient
RESPEC
2016 Fiscal Year Funding Amount
$39,967
Fund Source

The goal of this project is to refine the segmentation, extend the simulation period, and recalibrate an existing Hydrologic Simulation Program FORTRAN (HSPF) watershed model for the Rum River Watershed.

Aitkin
Anoka
Benton
Chisago
Crow Wing
Isanti
Kanabec
Mille Lacs
Morrison
Sherburne
Recipient
Tetra Tech
2015 Fiscal Year Funding Amount
$100,000
Fund Source

The goal of this project is to continue and finalize Hydrological Simulation Program FORTRAN (HSPF) watershed model construction and complete the calibration/validation process. The consultants will produce HSPF watershed model applications for the Lake Superior North and Lake Superior South watersheds that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) projects.

Cook
Lake
St. Louis
Recipient
Isanti County
2014 Fiscal Year Funding Amount
$37,900
Fund Source

Provide funding to counties to assist low-income homeowners with needed Subsurface Sewage Treatment Systems (SSTS) upgrades to protect public health and the environment.

Isanti
Recipient
Itasca County Soil and Water Conservation District
2014 Fiscal Year Funding Amount
$69,980
Fund Source

This project will develop, implement, and evaluate the impacts of co-developed civic engagement outcomes for the St. Louis River, Big Fork River, and Littlefork River watersheds.

Itasca
Recipient
Lake County Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$225,000
Fund Source

This project will gather watershed data necessary for the development of a comprehensive watershed management plan with parameter-specific thresholds that will maintain or improve water quality for the Kawishiwi Watershed.

Cook
Lake
St. Louis
Recipient
Lake County Soil & Water Conservation District
2013 Fiscal Year Funding Amount
$56,000
Fund Source

The goal of this project is to assess and leverage the capacity for the local community to engage in the process of watershed management in the Lake Superior Basin within Lake County and to adopt protection and restoration practices.

Cook
Lake
St. Louis
Recipient
South St. Louis County Soil and Water Conservation District
2013 Fiscal Year Funding Amount
$108,661
Fund Source

The goal of this project is to build the civic engagement capacity of local leaders, fostering water quality restoration in Northeastern Minnesota.

Carlton
Cook
Lake
St. Louis