Minnesota's Legacy

All Projects

Showing 1 - 40 of 69 | Export projects
Recipient
Area 1 - Red River Valley Conservation Service Area
2014 Fiscal Year Funding Amount
$250,000
Fund Source

The Accelerated Water Quality Project Implementation Program will increase the connection between landowners, local government units and the landscape to accelerate efforts addressing non-point source loading to surface waters throughout the Red River Valley Conservation Service Area.

Becker
Beltrami
Clay
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Traverse
Wilkin
Recipient
South Saint Louis County Soil and Water Conservation District
2015 Fiscal Year Funding Amount
$106,931
Fund Source

The goal of this project is to develop a stream restoration opportunities matrix for the Amity Creek watershed, which will prioritize the various protection and restoration options in the watershed for the Minnesota Pollution Control Agency (MPCA) and local partners.

St. Louis
Recipient
Becker SWCD
2014 Fiscal Year Funding Amount
$40,710
Fund Source

The Becker County Drainage Ditch Inventory and Inspection Project is a collaborative, multifaceted approach to develop a GIS-based drainage ditch inventory database system, inventory the current conditions of judicial ditches and adjacent land, and target and prioritize portions of each ditch system for restorative or protective measures.

Becker
Recipient
Becker SWCD
2016 Fiscal Year Funding Amount
$254,897
Fund Source

With over 500 public water lakes in Becker County, we are blessed with abundant and diverse lake resources that, like those of much of lake country, are at risk of degradation due to increasing development pressures, redevelopment of non-conforming lots, rising stormwater runoff and land use changes within their watersheds.

Becker
Recipient
United States Geological Survey
2014 Fiscal Year Funding Amount
$175,000
Fund Source

Duluth area streams received over 10 inches of rainfall on June 19 and June 20, 2012. This "500 year event" provides a once in a lifetime opportunity to further understand sediment movement and stream channel alterations due to an event of this magnitude.

St. Louis
Recipient
Minnesota Department of Agriculture
2017 Fiscal Year Funding Amount
$13,578
2016 Fiscal Year Funding Amount
$10,048
2015 Fiscal Year Funding Amount
$7,042
2014 Fiscal Year Funding Amount
$13,000
2013 Fiscal Year Funding Amount
$14,400
2012 Fiscal Year Funding Amount
$31,400
2010 Fiscal Year Funding Amount
$60,000
Fund Source

The Clay County Drainage Site is designed to evaluate the environmental impact of both surface and subsurface drainage from agricultural fields. This site includes six subsurface plots and one surface runoff plot, each approximately 24 acres in size. Monitoring stations are fully automated and each individual plot is monitored separately.The soils and topography across this demonstration site are virtually identical and represent field characteristics common in the most productive agricultural areas of the Red River Valley.

Clay
Recipient
Cook County SWCD
2017 Fiscal Year Funding Amount
$3,834
Fund Source

The project work for this effort includes watershed wide civic engagement and technical support to the final years of Watershed Restoration And Protection Strategy (WRAPS) work. Communication to stakeholders and other key civic based activities to share WRAPS information will be completed. The Cook County Soil and Water Conservation District (SWCD) will also provide technical support to aid completion of the Total Maximum Daily Load (TMDL) report and help define protection and restoration strategies for the watershed.

Cook
Recipient
South St. Louis County Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$283,224
Fund Source

This project will provide fiscal resources for South St. Louis County Soil and Water Conservation District (SSLCSWCD) to participate and lead efforts to attain geomorphic data sets, dissolved oxygen assessments, culvert inventory, and civic engagement activities in three major watersheds, Nemadji River, South Lake Superior and St. Louis River. This work is currently being worked on as a part of the MPCA’s Watershed Restoration and Protection Planning efforts.

Carlton
Lake
St. Louis
Recipient
Minnesota Department of Health
2019 Fiscal Year Funding Amount
$1,100,000
2018 Fiscal Year Funding Amount
$1,100,000
2017 Fiscal Year Funding Amount
$1,100,000
2016 Fiscal Year Funding Amount
$1,100,000
2015 Fiscal Year Funding Amount
$1,150,000
2014 Fiscal Year Funding Amount
$1,150,000
2013 Fiscal Year Funding Amount
$1,020,000
2012 Fiscal Year Funding Amount
$1,020,000
2011 Fiscal Year Funding Amount
$744,717
2010 Fiscal Year Funding Amount
$250,291
Fund Source

The Drinking Water Contaminants of Emerging Concern (CEC) program identifies environmental contaminants for which current health-based standards currently do not exist or need to be updated, investigate the potential for human exposure to these chemicals, and develop guidance values for drinking water. Contaminants evaluated by CEC staff include contaminants that have been released or detected in Minnesota waters (surface water and groundwater) or that have the potential to migrate to or be detected in Minnesota waters.

Statewide
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$369,971
Fund Source

This project is the continuation of efforts to restore and protect watersheds and streams in Minnesota’s Lake Superior coastal region. The project provides the means to evaluate water quality impairments, complete pollutant source assessments, establish loading capacities and allocations for impairments, and to evaluate and recommend protection strategies for high quality water resources. It also leverages and encourages adoption of locally driven solutions to watershed management and protection.

Lake
St. Louis
Recipient
University of Minnesota
2014 Fiscal Year Funding Amount
$154,038
2017 Fiscal Year Funding Amount
$100,000
Fund Source

The principal goal of this project is to fill critical data gaps and to establish a participatory watershed management framework for the Duluth Metropolitan Area (DMA) that mimics the statewide Watershed Restoration and Protection Strategy (WRAPS) process.

St. Louis
Recipient
South Saint Louis County Soil and Water Conservation District
2015 Fiscal Year Funding Amount
$51,875
Fund Source

The purpose of the project is to fill critical data gaps - this data will provide a foundation for future development of watershed models, Total Maximum Daily Load (TMDL) reports and the creation of a Watershed Restoration and Protection Strategy (WRAPS) report.

St. Louis
Recipient
South St. Louis Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$4,025
Fund Source

This project will provide the data necessary to assess Eagle Lake. Assessment parameters will include chl-A, Total Phosphorous, secchi disk readings, temperature (2' interval), conductivity (2' interval), pH (2' interval), and dissolved oxygen (2' interval). These samples will be collected monthly from May through September.

Lake
St. Louis
Recipient
Headwaters Science Center
2016 Fiscal Year Funding Amount
$57,028
Fund Source

This project will conduct water quality monitoring at 12 stream sampling sites. The sites will be monitored for chemical, physical, and bacteriological parameters over a two year time-period. The Headwaters Science Center (HSC) will be the lead agency and arrange volunteer cooperation from Trek North, Bemidji, Perham and/or Detroit Lakes High School students and their instructors. The HSC project lead will be responsible for oversight and full compliance to MPCA protocols.

Otter Tail
Recipient
Tetra Tech
2015 Fiscal Year Funding Amount
$115,000
Fund Source
The goal of this project is to construct, calibrate, and validate two Hydrologic Simulation Program FORTRAN (HSPF) watershed models: Lake Superior North and Lake Superior -South. The contractor will produce HSPF models that can readily be used to provide information to support conventional parameter Total Maximum Daily Loads (TMDLs). The contractor will clearly demonstrate that these models generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.
Cook
Lake
St. Louis
Recipient
Tetra Tech
2015 Fiscal Year Funding Amount
$100,000
Fund Source

The goal of this project is to continue and finalize Hydrological Simulation Program FORTRAN (HSPF) watershed model construction and complete the calibration/validation process. The consultants will produce HSPF watershed model applications for the Lake Superior North and Lake Superior South watersheds that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) projects.

Cook
Lake
St. Louis
Recipient
Otter Tail, East SWCD
2017 Fiscal Year Funding Amount
$58,000
Fund Source

The purpose of this project is to identify effective irrigation and nutrient management best management practices and technologies and the barriers that prevent irrigators, producers, and other agricultural partners from adopting them in Otter Tail County. The primary goal is to reduce nitrate in areas where groundwater is susceptible to contamination as mapped by The Minnesota Department of Health by identifying effective BMPs and addressing the barriers to their adoption.

Becker
Douglas
Otter Tail
Todd
Wadena
Recipient
Minnesota Department of Natural Resources
2011 Fiscal Year Funding Amount
$200,000
Fund Source

Project between Minnesota Department of Natural Resources and United States Army Corp of Engineers at Knowlton Creek Watershed to address a large amount of sediment deposited into the St. Louis River Area of Concern (AOC).

Carlton
Lake
St. Louis
Recipient
Lake SWCD
2015 Fiscal Year Funding Amount
$77,000
Fund Source

When completed, this Lake County-wide culvert inventory project will have multiple direct benefits to water quality protection, natural resource planning, and municipal asset protection. This inventory will be used to provide local and state authorities accurate information on the condition of road crossings, better calibrate hydrological modeling tools crucial to the inter-agency Watershed Restoration and Protection Strategies (WRAPS) process, and assess how road crossings in Lake County are affecting the water and sediment transport capacity of our waterways.

Lake
Recipient
Lake County SWCD
2017 Fiscal Year Funding Amount
$25,000
Fund Source

This project provides fiscal resources for Lake County Soil and Water Conservation District for civic engagement activities in the Lake Superior South, North, and Cloquet watersheds for Watershed Restoration and Protection Strategies (WRAPS). This project also includes provide funding for water chemistry monitoring assistance and diagnostic field work that will fill identified monitoring gaps and stressors within the Lake Superior South watershed.

Cook
Lake
St. Louis
Recipient
Lake County Soil & Water Conservation District
2013 Fiscal Year Funding Amount
$56,000
Fund Source

The goal of this project is to assess and leverage the capacity for the local community to engage in the process of watershed management in the Lake Superior Basin within Lake County and to adopt protection and restoration practices.

Cook
Lake
St. Louis
Recipient
South St. Louis County Soil and Water Conservation District
2013 Fiscal Year Funding Amount
$108,661
Fund Source

The goal of this project is to build the civic engagement capacity of local leaders, fostering water quality restoration in Northeastern Minnesota.

Carlton
Cook
Lake
St. Louis
Recipient
Minnesota Department of Health
2015 Fiscal Year Funding Amount
$105,000
2014 Fiscal Year Funding Amount
$105,000
Fund Source

The Lake Superior Beach Monitoring and Notification Program exists to test recreational beach water and notify the public if bacteria levels become unsafe. This project will expand the Beach Program to include additional outreach efforts, sanitary surveys and testing of new technologies to improve the Beach Program. Monitoring results will be used to inform the public, find the sources of bacterial contamination and address polluted runoff from improper waste disposal.

Cook
Lake
St. Louis
Recipient
Lake County Soil and Water Conservation District
2015 Fiscal Year Funding Amount
$83,000
Fund Source
The main purpose of this project is to provide fiscal resources for Lake County Soil and Water Conservation District (Lake County SWCD) to be engaged and participate in efforts for civic engagement in the Lake Superior South (LS South) Lake Superior North (LS North) watersheds and lead and carry-out civic engagement in the early stages of the Watershed Restoration and Protection Strategies (WRAPS) process in the Cloquet River watershed.
Lake
Recipient
University of Minnesota
2015 Fiscal Year Funding Amount
$199,981
Fund Source

This project will dentify critical pathways and areas on the landscape that contribute a disproportionate amount of sediment stressors to selected streams located in LS South and/or LS North HUC 8 watersheds. Unlike other HUC 8 watersheds with one mainstem stream and nested tributaries to the mainstem, LS South and North consist of numerous individual streams flowing to Lake Superior. Each of these streams has a mainstem, tributaries flowing to the mainstem and a surrounding watershed.

Cook
Lake
Recipient
Lake SWCD
2017 Fiscal Year Funding Amount
$114,000
Fund Source

This project will implement timber stand improvement activities on over 300 acres of private forest land within the Knife River and Skunk Creek watershed; both are not meeting state water quality standards for turbidity. These activities will culminate in planting diverse, large-statured native trees, resilient in the face of forest pests and diseases, climate change, and deer browse. Through this project, significant areas of the Knife River and Skunk Creek watersheds will have a patchwork of seed sources that will naturally expand the footprint of a healthier forest.

Lake
Recipient
St. Louis County
2016 Fiscal Year Funding Amount
$200,000
Fund Source

St. Louis County's Comprehensive Water Management Plan Update 2010-2020 identifies providing financial assistance to qualifying homeowners to upgrade or replace failing septic systems as a Priority 2 action. Funds from the FY-16 Clean Water Fund Projects and Practices Grant will be used to provide funding to low-income homeowners to repair or replace SSTS identified as Imminent Threat to Public Health (ITPH) within the following watersheds: Lake Superior South, St.

St. Louis
Recipient
Wilkin SWCD
2018 Fiscal Year Funding Amount
$185,000
Fund Source
Wilkin
Recipient
MN DNR
2010 Fiscal Year Funding Amount
$2,100,000

The Minnesota County Biological Survey (MCBS) is an ongoing effort begun in 1987 by the Minnesota Department of Natural Resources (DNR) that is systematically surveying, county-by-county, the state's natural habitats. The effort identifies significant natural areas and collects and interprets data on the status, distribution, and ecology of plants, animals, and native plant communities throughout the state. Through 2009 surveys have been completed in 74 of Minnesota's 87 counties and have added nearly 17,000 new records of rare features to the DNR's information systems.

Beltrami
Clearwater
Cook
Koochiching
Lake
Lake of the Woods
St. Louis
Recipient
Minnesota Pollution Control Agency
2014 Fiscal Year Funding Amount
$297,169
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Pollution Control Agency
2015 Fiscal Year Funding Amount
$287,628
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Pollution Control Agency
2011 Fiscal Year Funding Amount
$3,521,699
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities.

Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support.

Becker
Beltrami
Blue Earth
Carlton
Dakota
Dodge
Douglas
Freeborn
Goodhue
Jackson
Lake
Le Sueur
Lincoln
Mahnomen
Marshall
Morrison
Murray
Nobles
Norman
Otter Tail
Pennington
Pine
Pipestone
Polk
Rice
Rock
Roseau
Scott
St. Louis
Steele
Todd
Wadena
Waseca
Recipient
Minnesota Department of Natural Resources
2011 Fiscal Year Funding Amount
$140,000
Fund Source

The Minnesota Department of Natural Resources will coordinate the collection of high-resolution elevation data for northeastern portion of Minnesota using Light Detection and Ranging (LIDAR) systems. The geographic area of the work includes Minnesota counties of Carlton, Cook, Lake, and St. Louis Counties and that portion of Koochiching County that comprises Voyageurs National Park.

Carlton
Cook
Koochiching
Lake
St. Louis
Recipient
Regents of the University of Minnesota/Natural Resources Research Institute
2013 Fiscal Year Funding Amount
$73,330
Fund Source

The overall project goal is to develop complementary (same year) physical, biological, and chemical data sets for eight agency-prioritized lakes and three streams in NE Minnesota to incorporate into the overall state database for MPCA assessment purposes as well as research purposes.

Cook
Lake
St. Louis
Recipient
Otter Tail, East SWCD
2014 Fiscal Year Funding Amount
$150,000
Fund Source

The Otter Tail County Community Partners Grant Project will enable community groups to go beyond planning and take action to protect their water resources. This grant program will provide targeted community groups with the means to make positive improvements now and identify high priority projects for future opportunities. Engaging community members in the identification of water protection opportunities with the data in recently completed lake assessment reports will help build connections and foster a stewardship ethic.

Otter Tail
Recipient
Otter Tail, West SWCD
2015 Fiscal Year Funding Amount
$290,616
Fund Source

This Initiative is a nine-year plan to take a systematic approach to inventory and analyze all Public Waters within the County. Phase 1 includes identifying areas of concern through GIS analysis of current landuse along Public Waters, and the development of a database of non-compliant landowners which will be updated and maintained. Once landowners have been identified they will receive a joint letter and map stating that they may not be in compliance.

Otter Tail
Recipient
Wilkin SWCD
2016 Fiscal Year Funding Amount
$203,000
Fund Source

The Otter Tail River is located in west-central Minnesota. Its Lower Otter Tail River (LOTR) reach is impaired for sediment. The LOTR begins at the dam of Orwell Reservoir near Fergus Falls and ends 48 river miles downstream at the confluence with the Bois de Sioux River at Breckenridge. No point sources contribute directly to the LOTR. Consequently, the turbidity impairment must be addressed through non-point measures. Current stream instability and bank erosion is largely a result of an 18-mile channel straightening completed by the Army Corps of Engineers in the 1950s.

Wilkin
Recipient
Wilkin SWCD
2016 Fiscal Year Funding Amount
$135,000
Fund Source

This restoration and protection project will reduce the loading of sediment to the Otter Tail River by 440 tons/year. This is about 6.5% of the total reduction needed to meet the goals of the Lower Otter Tail TMDL Implementation Plan. The Otter Tail River downstream of Orwell Dam is impaired due to sediment, with stream bank erosion being the primary contributor. This stream bank restoration will include the installation of woody toe debris benches and the installation of a vegetated slope along a 1,400 foot reach of the river.

Wilkin
Recipient
Otter Tail, East SWCD
2017 Fiscal Year Funding Amount
$16,225
Fund Source

The Otter Tail Water Management District (OTWMD) manages the wastewater for nearly 1,750 private residences near Otter Tail Lake, Deer Lake, and Lake Blanche. There OTWMD is responsible for 101 monitoring wells that were installed in 1984 and 1985 that are no longer being used and need to be properly sealed. The goal of this project is for the East Otter Tail Soil and Water Conservation District (EOTSWCD) to assist the OTWMD in properly sealing 100% of the monitoring wells that are located within the Otter Tail Surficial Aquifer.

Otter Tail
Recipient
Otter Tail, East SWCD
2017 Fiscal Year Funding Amount
$471,000
Fund Source

The purpose of this project is to develop a detailed tool that can be used in all watersheds within the Otter Tail and Becker counties to prioritize, target, and measure implementation practices at the field scale. The PTM App will significantly increase the targeting capabilities in Otter Tail and Becker Counties. The Watershed Restoration and Protection Strategy has not been completed for Otter Tail County, yet, and the PTM App will be able to assist targeting and prioritizing when those documents are created.

Becker
Otter Tail