Minnesota's Legacy

All Projects

Showing 1 - 40 of 64 | Export projects
Recipient
Dakota SWCD
2014 Fiscal Year Funding Amount
$300,000
Fund Source

This project targets retrofit stormwater Best Management Practices (BMPs) on public land to assist partnering Local Government Units (LGUs) achieve water quality goals identified in local stormwater plans. The Dakota County Soil and Water Conservation District (SWCD) provides technical assistance and distributes Clean Water Funding (CWF) to leverage local funding through its time-proven Stormwater Retrofit Partnership (Partnership) cost share program.

Dakota
Recipient
Dakota SWCD
2014 Fiscal Year Funding Amount
$100,000
Fund Source

This project is a continuation of the Dakota County Community Initiative, which has received Clean Water Funds in 2012 and 2013. It will provide cost share funding to organizations and associations who voluntarily construct medium sized water quality best management practices (BMPs) in Dakota County.

Dakota
Recipient
Dakota SWCD
2014 Fiscal Year Funding Amount
$150,000
Fund Source
Dakota
Recipient
Dakota SWCD
2015 Fiscal Year Funding Amount
$150,000
Fund Source

This project will use the Dakota County Soil and Water Conservation District's existing Conservation Initiative Funding program to provide technical assistance and monetary incentives for targeted, medium-sized projects such as raingardens, bioinfiltration, biofiltration, bioswales, shoreline stabilizations, and other best management practices (BMPs). Project proposals will be solicited from faith based organizations, homeowner associations, school organizations, lake associations, and others that own or manage large areas of land.

Dakota
Recipient
Vermillion River Watershed JPO
2017 Fiscal Year Funding Amount
$412,200
Fund Source

As part of the Dakota County Transportation Department's highway 78 road reconstruction project, the Vermillion River Watershed Joint Powers Organization is partnering with Dakota County to install a nitrate treatment practice on a tributary to the South Branch Vermillion River adjacent to the road. The South Branch Vermillion River subwatershed is the highest nitrate loading subwatershed in the Vermillion River Watershed and is a significant contributor to contaminated drinking water in the eastern portion of the watershed.

Dakota
Recipient
Ramsey Conservation District
2017 Fiscal Year Funding Amount
$150,000
Fund Source

The purpose of this program is to engage community groups for the installation of community accessible rain gardens and other water quality best management practices in Ramsey County. The goal is to install 6-12 storm water best management projects that will help protect and improve water quality of surrounding lakes. The installed practices will reduce an estimated 10 acre-feet of storm water runoff, 9 pounds of phosphorous, and 3 tons of sediment annually. Significant measurable outputs, with development of long-term partnerships, are primary objectives for this program.

Ramsey
Recipient
Shingle Creek WMC
2018 Fiscal Year Funding Amount
$267,040
Fund Source
Hennepin
Recipient
Bassett Creek WMC
2017 Fiscal Year Funding Amount
$400,000
Fund Source

The Plymouth Creek Restoration Project will improve water quality in Plymouth Creek and Medicine Lake, the creek's primary receiving water. The project will reduce total phosphorus and suspended sediment in Plymouth Creek and Medicine Lake stemming from streambank erosion. Streambank erosion is a common source of pollution, particularly in developed landscapes where flows in streams are considered flashy and can easily scour unprotected and disturbed streambanks.

Hennepin
Recipient
Bassett Creek WMC
2017 Fiscal Year Funding Amount
$134,595
Fund Source

This project engages private property owners including non-profits, businesses, and institutions, in the Harrison Neighborhood of Near North Minneapolis to install storm water best management practices. The BMPs will reduce pollution in Bassett Creek including chlorides and bacteria, for which the creek is impaired. The primary focus is on Glenwood Avenue, a focal point in the community and a highly impervious area.

Hennepin
Recipient
Shingle Creek WMC
2016 Fiscal Year Funding Amount
$725,000
Fund Source

Installation of a 43,000 sf infiltration gallery in Becker Park in the City of Crystal to infiltrate 0.5 inches of runoff from a 147 acre currently untreated mixed use subwatershed with 51% impervious surface. The project will reduce total phosphorus to Impaired Water Upper Twin Lake by 118 pounds annually, and reduce street flooding on Bass Lake Road (Hennepin County Road 10).

Hennepin
Recipient
Vadnais Lake Area WMO
2018 Fiscal Year Funding Amount
$97,000
Fund Source
Ramsey
Recipient
Area 4 - Metropolitan SWCDs Technical Service Area
2016 Fiscal Year Funding Amount
$200,000
Fund Source

Once thought to have an essentially inexhaustible groundwater supply, Minnesotans are now realizing our rates of use are regionally unsustainable. Recent advanced modeling by the MN DNR and Metropolitan Council of aquifer supplies, in conjunction with predicted demand, indicate the major metropolitan area aquifers are currently subject to extraction rates that exceed recharge. Simply stated, we are mining our groundwater.

Scott
Recipient
Carver County
2017 Fiscal Year Funding Amount
$10,000
Fund Source

The Carver County Planning and Water Management Department (PWM) has an active well sealing cost share program. Following the adoption of the updated County Groundwater Plan in February of 2016, the Carver County Board of Commissioners moved to accelerate the program to encourage landowners to seal abandoned wells. Carver County is looking to supplement existing funds, as demand is expected to increase. With this additional funding, it is the goal of Carver County PWM to seal an additional 15 wells county wide.

Carver
Recipient
Ramsey-Washington Metro WD
2014 Fiscal Year Funding Amount
$200,000
Fund Source

Ramsey-Washington Metro Watershed District (RWMWD) will improve water quality in Casey Lake and ultimately Kohlman Lake through the installation of approximately 25 rain gardens on priority properties identified as part of the Casey Lake Urban Stormwater Retrofit Assessment completed by Ramsey Conservation District (RCD) in 2011.

Ramsey
Recipient
Lower Mississippi River WMO
2018 Fiscal Year Funding Amount
$700,000
Fund Source
Dakota
Ramsey
Recipient
Minnetonka, City of
2014 Fiscal Year Funding Amount
$129,200
Fund Source

The City of Minnetonka and its residents highly value the water resources within the community, which include approximately ten lakes, four streams, and hundreds of wetlands. The City has been progressive in protecting these resources through policies and management strategies, and now wants to increase their on-the-ground efforts in protecting and improving water quality. The City hopes to conduct targeted watershed assessments for fourteen selected priority water bodies to identify and optimize the type and locations of Best Management Practices (BMPs) to be installed.

Hennepin
Recipient
Forest Lake, City of
2014 Fiscal Year Funding Amount
$382,000
Fund Source

The City of Forest Lake will install four biofiltration basins and a wet sedimentation pond to treat stormwater prior to discharge into Clear Lake. Clear Lake is identified as a priority lake within the Rice Creek Watershed District's (RCWD) Watershed Management Plan and does not meet the nutrient goals established by the RCWD. Mid-summer algae blooms are common and occasionally severe enough to impact recreation.

Washington
Recipient
Ramsey-Washington Metro WD
2014 Fiscal Year Funding Amount
$58,515
Fund Source

The Ramsey-Washington Metro Watershed District (District) has determined that large impervious sites (like churches, commercial sites, and schools) are more economical for stormwater management retrofit projects than distributed small projects along roadways. The District began assessing church sites for retrofit opportunities in 2013 and will continue this effort in 2014. Church congregations have been receptive to partnering with the watershed district.

Ramsey
Washington
Recipient
Shingle Creek WMC
2014 Fiscal Year Funding Amount
$200,000
Fund Source

This project is the ecological restoration of 1,400 feet of Shingle Creek, an Impaired Water for low dissolved oxygen and impaired biota, in Brooklyn Center and Brooklyn Park. The Shingle Creek Impaired Biota and Dissolved Oxygen Total Maximum Daily Load requires sediment oxygen demand load reductions and establishes restoration design standards to enhance habitat that will be incorporated into this project.

Hennepin
Recipient
Minnehaha Creek WD
2014 Fiscal Year Funding Amount
$483,000
Fund Source

The Cottageville Park Water Quality Protection and Stream Restoration Project was developed to meet the goals of the Minnehaha Creek Watershed District and the City of Hopkins, including; water resource management, channel stabilization, stream enhancement, riparian corridor improvements, open space creation, park development, and revitalization. The project achieves these goals through implementation of the following:

Hennepin
Recipient
Minnesota Department of Health
2019 Fiscal Year Funding Amount
$1,100,000
2018 Fiscal Year Funding Amount
$1,100,000
2017 Fiscal Year Funding Amount
$1,100,000
2016 Fiscal Year Funding Amount
$1,100,000
2015 Fiscal Year Funding Amount
$1,150,000
2014 Fiscal Year Funding Amount
$1,150,000
2013 Fiscal Year Funding Amount
$1,020,000
2012 Fiscal Year Funding Amount
$1,020,000
2011 Fiscal Year Funding Amount
$744,717
2010 Fiscal Year Funding Amount
$250,291
Fund Source

The Drinking Water Contaminants of Emerging Concern (CEC) program identifies environmental contaminants for which current health-based standards currently do not exist or need to be updated, investigate the potential for human exposure to these chemicals, and develop guidance values for drinking water. Contaminants evaluated by CEC staff include contaminants that have been released or detected in Minnesota waters (surface water and groundwater) or that have the potential to migrate to or be detected in Minnesota waters.

Statewide
Recipient
Elm Creek WMC
2017 Fiscal Year Funding Amount
$200,000
Fund Source

Fish Lake is 238 acres and does not meet state water quality standards due to excessive nutrients. Through the Total Maximum Daily Load study, a recommendation was made to treat the lake with alum to achieve the state's water quality standards. The goal of this project is to reduce the phosphorus load to Fish Lake by 310 pounds per year and meet the needed phosphorus reduction goal. The project will be completed as a partnership between the Elm Creek Water Management Commission, Three Rivers Park District, the City of Maple Grove, and The Fish Lake Area Resident's Association.

Hennepin
Recipient
Ramsey-Washington Metro WD
2016 Fiscal Year Funding Amount
$150,000
Fund Source

The Ramsey-Washington Metro Watershed District (RWMWD) is responsible for the protection and restoration of the water quality of 20 lakes and 5 creeks within its boundary. Permit and voluntary cost share programs serve to slowly redevelop the watershed to the benefit of these water bodies. However, additional projects are needed- not only to implement green infrastructure in areas that need extra restoration and protection, but also to foster new relationships between citizens and the RWMWD to rally together in a common goal to the benefit of their water resources.

Ramsey
Washington
Recipient
Washington Conservation District
2017 Fiscal Year Funding Amount
$81,000
Fund Source

The goal of this project is to adapt and expand the existing successful Master Water Stewards program to engage citizens and catalyze clean water projects in suburban, exurban and rural communities of Washington and southern Chisago Counties. As part of this project, 20 citizens' stewards will be recruited and trained to work in partnership with the Washington Conservation District and area watershed management organizations to implement clean water projects in identified priority areas.

Chisago
Washington
Recipient
Forest Lake, City of
2017 Fiscal Year Funding Amount
$505,000
Fund Source

Forest Lake Area Schools, the Rice Creek Watershed District and the City of Forest Lake have partnered to develop the first phase of a long-term stormwater reuse and education program starting. This project will result in stormwater pond retrofits and construction of new irrigation infrastructure to reduce potable groundwater usage by over 4 million gallons per year. Further, educational curriculum will be developed to integrate the reuse technology and water conservation concepts. Clear Lake is an important regional resource and boasts a very active lake association.

Washington
Recipient
Anoka CD
2014 Fiscal Year Funding Amount
$88,590
Fund Source

This project will install an iron enhanced sand filter (IESF) to restore water quality in Golden Lake. Golden Lake is within a fully developed area of the Twin Cities, surrounded by residential land use, and the focal point of a city park. The IESF will achieve 11% of the phosphorus reduction (21 lbs/yr) required for Golden Lake to meet State water quality standards, as identified in the approved Total Maximum Daily Load (TMDL).

Anoka
Recipient
Washington Conservation District
2014 Fiscal Year Funding Amount
$50,000
Fund Source

The Washington Conservation District (WCD) will use this program to engage homeowner associations (HOAs) within Washington County. The project will identify methods and opportunities for HOAs to commit to clean water management practices and prioritize stormwater retrofit projects within partnering HOAs. Project goals include engaging at least 20 HOAs within the county and conducting 2-3 focus group sessions with property management companies and HOAs to identify opportunities for and barriers to adoption of clean water practices.

Washington
Recipient
Ramsey Conservation District
2015 Fiscal Year Funding Amount
$59,766
Fund Source

Past and current monitoring data has shown Ramsey County's Lambert Creek has high levels of total phosphorus (TP), anywhere from 0.14 mg/L to 0.30 mg/L, which is above the proposed State standard of 0.10 mg/L for streams in the Central Region.

Ramsey
Recipient
Lower Mississippi River WMO
2016 Fiscal Year Funding Amount
$196,000
Fund Source

Lake Augusta and Sunfish Lake are deep lakes located in the Lower Mississippi River Watershed Management Organization. Both lakes are approximately 40 acres in size and surrounded by watersheds with moderate to low imperviousness. Both lakes are included on the MPCA's 303(d) list as impaired for aquatic recreation due to excessive nutrients. Lake Augusta and Sunfish Lake were included in a watershed restoration and protection strategies (WRAPS) study and total maximum daily load (TMDL) performed from 2012 to 2014.

Dakota
Recipient
Coon Creek WD
2018 Fiscal Year Funding Amount
$195,158
Fund Source
Anoka
Recipient
Area 4 - Metropolitan SWCDs Technical Service Area
2014 Fiscal Year Funding Amount
$250,000
Fund Source

Ensuring natural resource practitioners are applying state-of-the-art approaches is the best way to achieve optimum Best Management Practice (BMP) selection, design, and placement in the landscape, thereby maximizing Clean Water Fund (CWF) benefits. To that end, it is critical to train new staff, create modeling protocols for new BMPs, refine and calibrate models, and test ever-advancing modeling applications.

Scott
Recipient
Shingle Creek WMC
2017 Fiscal Year Funding Amount
$38,000
Fund Source

The purpose of this project is to conduct a subwatershed assessment of that part of the City of Minneapolis that is within the Shingle Creek watershed. This subwatershed drains to three Impaired Waters: Crystal Lake, Ryan Lake, and Shingle Creek. The assessment will identify the most feasible and cost-effective best management practices for retrofit in this densely urban, fully developed subwatershed. The project includes workshops with neighborhood organizations to help them educate residents and organize implementation projects.

Hennepin
Recipient
Minnehaha Creek WD
2017 Fiscal Year Funding Amount
$35,952
Fund Source

Both Minnehaha Creek and Lake Hiawatha are on the State Impaired Waters List and have had Total Maximum Daily Load Studies completed. The proposed work would focus on park land along Minnehaha Creek which is a highly-recreated corridor with public trail systems throughout. In 2014, the District experienced record flooding resulting in substantial erosion and tree loss along Minnehaha Creek. In 2015, the District completed an assessment of flood damage and received FEMA funding for bank repair at 31 sites along the Creek within Minneapolis Park and Recreation Board property.

Hennepin
Recipient
Minnehaha Creek WD
2018 Fiscal Year Funding Amount
$370,000
Fund Source
Hennepin
Recipient
Minnehaha Creek WD
2015 Fiscal Year Funding Amount
$39,968
Fund Source

This project will develop a plan that identifies several stormwater best management practices (BMPs) for the City of St. Bonifacius and surrounding rural areas. Implementation of these BMPs will improve water quality in Mud Lake and Halsted's Bay. A watershed model (EPA-SWMM and P8) will be developed to determine existing phosphorus and sediment loading from the City of Bonifacius and adjacent rural areas draining to Mud Lake. Model output will be used to identify several potential locations for stormwater BMPs throughout the city and surrounding areas.

Hennepin
Recipient
Minneapolis, City of
2015 Fiscal Year Funding Amount
$399,425
Fund Source

This project engages private property owners in a neighborhood scale effort to install up to 180 stormwater Best Management Practice (BMPs) to protect Lake Nokomis, a water body in Minneapolis impaired for excess nutrients. An analysis of the Lake Nokomis subwatershed identified priority areas for BMP installations based on drainage pattern, land uses and presence of previously-constructed BMPs. The project will install 160-180 BMPs adjacent to alleyways to disconnect residential backyards, rooftops and driveways on 15 residential blocks.

Hennepin
Recipient
Bassett Creek WMC
2016 Fiscal Year Funding Amount
$400,000
Fund Source

The Northwood Lake Improvement Project will treat storm water runoff from over 110 acres of currently untreated urban land through a variety of practices at two different locations adjacent to the lake. Northwood Lake is an impoundment of the North Branch of Bassett Creek located in the City of New Hope within the Bassett Creek Watershed Management Commission (BCWMC). Northwood Lake is a shallow lake with a fully developed watershed of 1,341 acres that provides very little stormwater treatment.

Hennepin
Recipient
Anoka CD
2014 Fiscal Year Funding Amount
$517,780
Fund Source

This Oak Glen Creek stormwater pond expansion and enhancement using an iron enhanced sand filter (IESF) is a partnership between the Anoka Conservation District (ACD) and a private company to protect a downstream corridor stabilization and improve the quality of stormwater discharged to the Mississippi River. Very little stormwater infrastructure currently exists in the 573 acre Oak Glen Creek subwatershed, and it discharges 147,519 pounds of sediment and 353 pounds of phosphorus to the Mississippi River annually.

Anoka
Recipient
Rice Creek WD
2017 Fiscal Year Funding Amount
$280,000
Fund Source

Little Lake Johanna is not meeting state water quality standards due to excessive phosphorus. The Rice Creek Watershed District, in partnership with the City of Roseville, will improve the water quality of stormwater runoff into Little Lake Johanna through installation of an iron-enhanced sand filter. The Oasis Pond Iron-Enhanced Sand Filter Project will annually remove approximately 34 pounds of phosphorus from runoff to Little Lake Johanna annually. This is equal to nearly 20% of the needed load reduction as established by the Southwest Urban Lakes Total Maximum Daily Load Study.

Ramsey
Recipient
Anoka CD
2017 Fiscal Year Funding Amount
$467,968
Fund Source

Golden Lake does not meet state water quality standards due to high phosphorus levels. The proposed iron enhanced sand filter basin was identified in the Golden Lake Subwatershed Stormwater Retrofit Analysis to be one of the most cost effective remaining practices for reducing external phosphorus loads to Golden Lake. This project, paired with two previously installed upstream Best Management Practices, will achieve on average, 84% of the phosphorus reduction goal for the watershed.

Anoka