Showing 1 - 39 of 39 | Export projects
Recipient
Red Lake SWCD
2014 Fiscal Year Funding Amount
$10,930
Fund Source

The purpose of this project is to conduct an inventory of the 103E drainage ditches where erosion, sediment, and/or nutrients are contributing substantially to water quality degradation, and prioritize sites for side water inlet control and/or buffer strip implementation.

Red Lake
Recipient
Red Lake SWCD
2015 Fiscal Year Funding Amount
$21,860
Fund Source

The purpose of this Phase II Project is to advance the inventory process of the 103E drainage ditches where erosion, sediment, and/or nutrients are contributing substantially to water quality degradation, and prioritize sites for side water inlet control and/or buffer strip implementation.Through this project, Red Lake Watershed District, Red Lake County Ditch Authority, along with the Red Lake County SWCD, will be working together prioritizing county ditch systems (based upon water quality degradation and the amount of sediment loading that is occurring in the ditch systems), targeting whe

Red Lake
Recipient
Red Lake SWCD
2015 Fiscal Year Funding Amount
$66,263
Fund Source

The Clearwater River from the Lost River to Beau Gerlot Creek and from the Lower Badger Creek to the Red Lake River is on the Total Maximum Daily Load Impaired Waters List for Turbidity. Red Lake County Soil and Water Conservation District (SWCD) has targeted five sites in the Terrebonne Creek, Beau Gerlot Creek, and Lower Badger Creek subwatersheds of the Clearwater River Watershed; with the potential of an additional five to ten more projects, based on data analysis obtained from a number of models.

Red Lake
Recipient
Beltrami SWCD
2016 Fiscal Year Funding Amount
$150,000
Fund Source

The Beltrami SWCD proposes to partner with citizen and non-profit groups to complete projects that will reduce stormwater runoff and retain water on the land. The majority of the projects will be in the Lake Bemidji lakeshed which has recently been identified in the WRAPs project as being on the verge of impaired for nutrients. With the City of Bemidji being a regional hub for Northwestern Minnesota and the First City on the Mississippi, there are ample opportunities for citizen involvement and ample opportunities for stormwater improvements.

Beltrami
Recipient
Beltrami SWCD
2017 Fiscal Year Funding Amount
$37,000
Fund Source

Beltrami County will be updating their water plan in 2017. This plan will be watershed protection oriented and will utilize all available data and maps in order to best protect our water resources. In 2012, Beltrami County completed screening on 19 of our large lakes with heavy land use development. What we found was that none of the lakes had enough chemical data for a trend analysis.

Beltrami
Recipient
Clearwater Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$6,290
Fund Source

This project will complete a lake data set for 303(d) and Aquatic Recreation use assessments in Clearwater County by monitoring total phosphorus, chlorophyll-a and Secchi depth; by utilizing lakeshore owners.

Clearwater
Recipient
Red Lake Watershed District
2014 Fiscal Year Funding Amount
$185,473
2016 Fiscal Year Funding Amount
$100,000
Fund Source

The overall goal is to develop a Watershed Restoration and Protection Strategy (WRAPS) Report and Total Maximum Daily Load (TMDL) Study that will address water quality impairments and maintain or improve water quality throughout the Clearwater River watershed. The study will identify sources of pollutants to the streams and lakes, allocate pollution reduction goals, and prioritize and identify implementation strategies to maintain or improve water quality in key lakes and streams in the watershed.

Beltrami
Clearwater
Mahnomen
Pennington
Polk
Red Lake
Recipient
Clearwater Soil and Water Conservation District
2014 Fiscal Year Funding Amount
$19,982
Fund Source

This project will provide the assessment of the chemical, physical, biological, and bacteriological integrity of surface waters.

Clearwater
Recipient
RESPEC
2012 Fiscal Year Funding Amount
$67,972
Fund Source

This project will construct three watershed framework models built using the Hydrologic Simulation Program FORTRAN. These executable models will simulate hydrology at the 12-digit HUC subbasin scale. An HSPF model will be built for each of the following 8-HUC watersheds: Red Lake River (09020303) and the Clearwater River (09020305).

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$249,932
Fund Source

This project will construct, calibrate, a set of HSPF watershed models covering the entire area of the Lake of the Woods drainage, including the Rainy River watershed. The consultant will produce HSPF models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will clearly demonstrate that these models generate predicted output timeseries for hydrology which are consistent with available sets of observed data.

Koochiching
Lake of the Woods
Roseau
St. Louis
Recipient
Minnesota Department of Health
2019 Fiscal Year Funding Amount
$1,100,000
2018 Fiscal Year Funding Amount
$1,100,000
2017 Fiscal Year Funding Amount
$1,100,000
2016 Fiscal Year Funding Amount
$1,100,000
2015 Fiscal Year Funding Amount
$1,150,000
2014 Fiscal Year Funding Amount
$1,150,000
2013 Fiscal Year Funding Amount
$1,020,000
2012 Fiscal Year Funding Amount
$1,020,000
2011 Fiscal Year Funding Amount
$744,717
2010 Fiscal Year Funding Amount
$250,291
Fund Source

The Drinking Water Contaminants of Emerging Concern (CEC) program identifies environmental contaminants for which current health-based standards currently do not exist or need to be updated, investigate the potential for human exposure to these chemicals, and develop guidance values for drinking water. Contaminants evaluated by CEC staff include contaminants that have been released or detected in Minnesota waters (surface water and groundwater) or that have the potential to migrate to or be detected in Minnesota waters.

Statewide
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$99,986
Fund Source

This project will finalize HSPF watershed model construction and complete the calibration/validation process. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval.

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
Clearwater SWCD
2015 Fiscal Year Funding Amount
$89,845
Fund Source

Pasture and hayland account for 62% of the agricultural land use in Clearwater County. In 2012, it was the 12th largest producer of beef cattle in Minnesota. In a county where 22% of pasture/hayland acres are within 300 feet of riparian areas, management practices need to be introduced that enhance rather than restrict the farm operations that use these zones for their livelihood. Clearwater County's Silver Creek and Ruffy Brook are currently listed as impaired by fecal coliform.

Clearwater
Recipient
Lake of the Woods SWCD
2017 Fiscal Year Funding Amount
$55,956
Fund Source

The Rainy River - Rainy Lake, Rainy River - Baudette and Rapid River Watershed Assessments will include the waters of the Baudette River, Black River, Peppermint Creek, Rapid River, Rat Root River and Winter Road River in Koochiching and Lake of the Woods Counties. This assessment focuses on collection of water chemistry and field parameters at the 12 key sites identified and modified by the Minnesota Pollution Control Agency (MPCA). Five of the sites will have extra total phosphorus and chlorophyll analysis completed as identified by the MPCA for collecting river nutrients.

Koochiching
Lake of the Woods
St. Louis
Recipient
Lake of the Woods Water Sustainability Foundation
2015 Fiscal Year Funding Amount
$500
2016 Fiscal Year Funding Amount
$500
2017 Fiscal Year Funding Amount
$500
2018 Fiscal Year Funding Amount
$500
Fund Source

The Minnesota Pollution Control Agency (MPCA) is a co-sponsor and assists with a portion of the financial support for the International Rainy River-Lake of the Woods Watershed Forum.

Cook
Koochiching
Lake
Lake of the Woods
Roseau
St. Louis
Recipient
International Water Institute
2012 Fiscal Year Funding Amount
$134,867
Fund Source

This project will support water quality monitoring and data analysis in the Red River Basin. The monitoring will assist in providing water chemistry data needed to calculate annual pollutant loads for the Major Watershed Load Monitoring Program (MWLMP) and provide short term data sets of select parameters to other MPCA programs.

Beltrami
Clearwater
Kittson
Mahnomen
Marshall
Norman
Pennington
Polk
Red Lake
Roseau
Recipient
Minnesota Pollution Control Agency
2014 Fiscal Year Funding Amount
$297,169
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Pollution Control Agency
2015 Fiscal Year Funding Amount
$287,628
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Department of Natural Resources
2011 Fiscal Year Funding Amount
$140,000
Fund Source

The Minnesota Department of Natural Resources will coordinate the collection of high-resolution elevation data for northeastern portion of Minnesota using Light Detection and Ranging (LIDAR) systems. The geographic area of the work includes Minnesota counties of Carlton, Cook, Lake, and St. Louis Counties and that portion of Koochiching County that comprises Voyageurs National Park.

Carlton
Cook
Koochiching
Lake
St. Louis
Recipient
University of Minnesota Center for Changing Landscapes
2018 Fiscal Year Funding Amount
$15,490
Fund Source

This project seeks assistance from University of Minnesota in developing effective interview questions for community watershed assessments and will assist in understanding the data collected through community interviews.

Itasca
Koochiching
Lake of the Woods
Recipient
Koochiching County SWCD
2019 Fiscal Year Funding Amount
$323,695
Fund Source

Koochiching County has seven major watersheds in the county, this contract is for work in five of them: Big Fork, Little Fork, Rapid River, Lower Rainy River, and Rainy River Headwaters. The local Koochiching County Soil and Water Conservation District (SWCD) is positioned to assist in several elements of the Watershed Restoration and Protection Strategies (WRAPS) process. This includes gap monitoring for water chemistry, sediment work, Total Maximum Daily Load (TMDL) development, modeling scenarios, and WRAPS development.

Itasca
Koochiching
St. Louis
Recipient
Koochiching County SWCD
2017 Fiscal Year Funding Amount
$99,930
Fund Source

This project will provide an important framework for civic and citizen engagement and communication in the International Rainy River-Lake of the Woods Watershed, which will contribute to long-term public participation in surface water protection and restoration activities.

Cook
Itasca
Koochiching
Lake
Lake of the Woods
St. Louis
Recipient
Red Lake WD
2015 Fiscal Year Funding Amount
$38,700
Fund Source

The Red Lake Watershed District will create an inspection database for 103E ditches under their drainage authority. The district will acquire a database software solution to conduct field inspections and to track ditch maintenance projects and use the software to facilitate compliance with state statutes. The project will also develop a process for completing the annual inspection and reporting requirements under Statue 103E.

Beltrami
Clearwater
Marshall
Pennington
Polk
Red Lake
Recipient
RESPEC
2017 Fiscal Year Funding Amount
$49,999
Fund Source

The goal of this project is to extend, calibrate, and validate the existing Hydrological Simulation Program – FORTRAN (HSPF) watershed models in the Red Lake River, Thief River, Clearwater River and Red Lake watersheds.

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
Red Lake Watershed District
2014 Fiscal Year Funding Amount
$77,429
Fund Source

The Clearwater River Watershed in northwestern Minnesota is a targeted watershed for the 2014-15 Surface Water Assessment Grant (SWAG) funding. A partnership of local agencies will monitor water quality at the targeted sites within this watershed that are listed in Appendix C of the 2014 Surface Water Assessment Grants (SWAG) Request for Proposal (RFP) document. Fifteen monitoring sites have been chosen within the Clearwater River watershed.

Red Lake
Recipient
Red River Watershed Management Board
2010 Fiscal Year Funding Amount
$346,000
Fund Source

This project will develop an effective transferable model to engage and educate watershed residents, stakeholders and others to better understand and protect watershed ecostystems through environmental monitoring, training, and formal and informal education programs in their local watershed. The project will build on the foundation of the existing Red River Basin River Watch program by strengthening three main activity areas: 1) curriculum integration and teacher training, 2) youth leadership and civic engagement, and 3) applied research collaboration and watershed science skills building.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Itasca
Kittson
Koochiching
Lake of the Woods
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Red River Watershed Management Board
2012 Fiscal Year Funding Amount
$200,000
Fund Source

MN Legislative Clean Water Fund funding to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data all for the benefit of water quality in the Red River Basin.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Kittson
Lake of the Woods
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Red River Watershed Management Board
2014 Fiscal Year Funding Amount
$100,000
Fund Source

The goal of this project is to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data for the benefit of water quality in the Red River Basin.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Red River Watershed Management Board
2015 Fiscal Year Funding Amount
$100,000
Fund Source

The goal of this project is to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data for the benefit of water quality in the Red River Basin.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
International Water Institute
2011 Fiscal Year Funding Amount
$60,915
Fund Source

This project will support water quality monitoring and data analysis in nine major watersheds (8-digit Hydrologic Unit Codes) of the Lower Red River Basin. The monitoring will assist in providing water chemistry data needed to calculate annual pollutant loads for the Major Watershed Load Monitoring Program (MWLMP) and provide short term data sets of select parameters to other MPCA programs.

Beltrami
Clearwater
Kittson
Mahnomen
Marshall
Pennington
Polk
Red Lake
Roseau
Recipient
Buffalo-Red River Watershed District
2016 Fiscal Year Funding Amount
$19,860
Fund Source

The purpose of this project is to improve understanding of primary productivity in the Red River and the diversity and population structure of the algal communities occurring along the river system. This will be accomplished through taxonomic identification of periphyton and phytoplankton assemblages necessary for characterizing responses to nutrient gradients along the Red River of the North.

Becker
Beltrami
Clay
Clearwater
Douglas
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Pope
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Red River Watershed Management Board
2010 Fiscal Year Funding Amount
$53,199
Fund Source

This project will monitor nine locations in the major watersheds (8-digit Hydrologic Unit Codes) of the Lower Red River Basin. The stream outlet monitoring will provide the water chemistry data needed to calculate annual pollutant loads. Staff from the Red River Watershed Management Board (RRWMB) will conduct the sampling, initially manage the data and provide the data to the Minnesota Pollution Control Agency (MPCA) for load calculations and import into the STORET data system.

Beltrami
Clearwater
Kittson
Mahnomen
Marshall
Norman
Pennington
Polk
Red Lake
Roseau
Recipient
Koochiching County Soil & Water Conservation District
2014 Fiscal Year Funding Amount
$2,915
Fund Source
Stream Monitoring in Second Creek for the open water season of 2014 (ice out through freeze up; May through November)
Koochiching
Recipient
University of Minnesota
2010 Fiscal Year Funding Amount
$250,000

Native trout require clean, cold water that usually originates from springs, but the springs feeding the 173 designated trout streams in southeastern Minnesota are under increasing pressure from current and expected changes in land use. This joint effort by the University of Minnesota and the Minnesota Department of Natural Resources is working to identify and map the springs and the areas that feed water to these springs and to learn how these waters might be affected by development and water use.

Dakota
Dodge
Fillmore
Goodhue
Hennepin
Houston
Mower
Olmsted
Ramsey
Scott
Wabasha
Washington
Winona
Recipient
University of Minnesota-Duluth (NRRI)
2012 Fiscal Year Funding Amount
$148,869
2014 Fiscal Year Funding Amount
$89,828
Fund Source

This project will generate water quality data for 10 stream locations MPCA designated for their 2012 and 2013 open-water sampling seasons (8 by NRRI-UMD and 2 via subcontract to the North St. Louis SWCD). The overall project goal is to collect event-based physical and chemical data sets for 10 agency-prioritized stream sampling sites in NE Minnesota for calculating pollutant loads and for incorporation into the overall State database for MPCA assessment purposes.

Cook
Koochiching
Lake
St. Louis
Recipient
Cook County Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$22,139
Fund Source

This project will collect a complete data set for total phosphorous and chlorophyll-a for 6 Cook County lakes while fostering lake association participation, ownership and understanding of their lakes. While many Cook County lakes have participated in the Citizen Lake Monitoring Program (CLMP) taking Secchi disk readings, these same lakes are deficient in basic lake chemistry data such as total phosphorus and chlorophyll-a.

Cook
Recipient
Beltrami County Environmental Services
2011 Fiscal Year Funding Amount
$92,475
Fund Source

This monitoring project will complete assessments of 41 lakes found throughout Beltrami COunty and acquire sufficient data for state/local assessments and also assist with county water planning.

Beltrami
Recipient
Red Lake County Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$34,366
Fund Source

This project will complete the dataset necessary for assessment of water quality on Brooks Creek, Black River, Lost River, Poplar River, and Hill River. By monitoring these five sites, Red Lake County SWCD will have collected baseline information on all of the Streams/Creeks in Red Lake County.

Red Lake
Recipient
USGS North Dakota Water Science Center
2017 Fiscal Year Funding Amount
$20,000
Fund Source

This is a joint project between the United States Geological Survey (USGS), Minnesota Pollution Control Agency (MPCA), North Dakota, and Manitoba. The project is a basin-wide, up-to-date water quality trend analysis using the "QWTrend" program for approximately 40 bi-national river sites to review nutrients, total suspended solids, total dissolved solids, sulfate and chloride from 1980 - 2015.

Clay
Kittson
Marshall
Norman
Polk
Wilkin