Minnesota's Legacy

All Projects

Showing 1 - 40 of 50 | Export projects
Recipient
Farmers, Rural Landowners, and Agricultural Supply Businesses
2019 Fiscal Year Funding Amount
$75,000
2018 Fiscal Year Funding Amount
$75,000
2017 Fiscal Year Funding Amount
$75,000
2016 Fiscal Year Funding Amount
$75,000
2015 Fiscal Year Funding Amount
$200,000
2014 Fiscal Year Funding Amount
$200,000
2013 Fiscal Year Funding Amount
$4,500,000
2012 Fiscal Year Funding Amount
$4,500,000
2011 Fiscal Year Funding Amount
$2,500,000
2010 Fiscal Year Funding Amount
$2,000,000
Fund Source

The AgBMP Loan Program provides needed funding for local implementation of clean water practices at an extremely low cost, is unique in its structure and is not duplicated by any other source of funding.The AgBMP loan program provides 3% loans through local lenders to farmers, rural landowners, and agriculture supply businesses.

Anoka
Becker
Blue Earth
Brown
Carver
Cook
Cottonwood
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Houston
Hubbard
Jackson
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
Morrison
Mower
Murray
Nicollet
Olmsted
Pipestone
Pope
Redwood
Renville
Rice
Rock
Scott
Sherburne
Sibley
St. Louis
Stearns
Steele
Stevens
Todd
Traverse
Wabasha
Waseca
Washington
Watonwan
Winona
Yellow Medicine
Recipient
Dakota County Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$150,000
Fund Source

This project will improve surface and groundwater quality in the rural sections of the Vermillion and North Cannon River Watersheds located in Dakota County through the installation of targeted structural and vegetative conservation practices. This project will leverage local and federal funds to provide technical and financial assistance to landowners that install agricultural water quality practices.

Dakota
Recipient
Metropolitan Council/University of Minnesota - Minnesota Technical Assistance Program (MnTAP)
2012 Fiscal Year Funding Amount
$11,243
2013 Fiscal Year Funding Amount
$36,453
2014 Fiscal Year Funding Amount
$45,337
Fund Source

Working with the Metropolitan Council, the University of Minnesota - Minnesota Technical Assistance Program (MnTAP) is investigating the opportunity for water conservation by private industrial water users across the Twin Cities metropolitan region. Private industrial water users are defined as industries that use private wells for their water supply. This work is determining factors that encourage or create barriers for implementation of identified industrial water conservation opportunities.

Anoka
Carver
Dakota
Hennepin
Ramsey
Scott
Washington
Recipient
Wenck Associates, Inc.
2012 Fiscal Year Funding Amount
$4,811
Fund Source

This project will support updates to the Draft Bald Eagle Lake TMDL. The updates will address comments received during the public comment period. The comments resulted in the development of individual Wasteload Allocations for stormwater sources in the Bald Eagle Lake watershed.

Anoka
Dakota
Hennepin
Ramsey
Washington
Recipient
Washington Conservation District
2012 Fiscal Year Funding Amount
$14,142
Fund Source

This project addresses the identified need for an Implementation Plan that provides an overall roadmap for the effort it will take to meet the Carnelian Marine St. Croix Multi-Lakes Total Maximum Daily Load (TMDL). An Implementation Plan will be developed, with involvement of the Project Partners and stakeholder groups, that sets forth prioritized strategies for attaining the TMDL and a method for tracking the progress of those efforts. The Implementation Plan will be restoration-focused, but will include protection-oriented information/actions as well.

Anoka
Chisago
Isanti
Pine
Ramsey
Washington
Recipient
Washington Conservation District
2012 Fiscal Year Funding Amount
$56,175
Fund Source

The goal of this project is to offer grant funding to boat marinas located in Washington County on the St. Croix River to complete water quality improvement projects. St. Croix marinas own large amounts of shoreline plus there are roads, parking areas, buildings, and garages. These all produce runoff that drains directly into the St. Croix River. Marinas also often include pollution hotspots due to the presence of boat fueling areas.

Washington
Recipient
Chisago County
2012 Fiscal Year Funding Amount
$5,651
Fund Source

Chisago County will coordinate up to three community dialogue meetings to inform its water planning decisions. The goal of the meetings will be to provide safe, productive and effective venues for citizens to become authentically engaged in the water planning process. The outcome of this Civic engagement work with Chisago County and their county water planning process will be a more engaged public in the County Water Planning Process.

Anoka
Chisago
Isanti
Pine
Ramsey
Washington
Recipient
Minnesota River Board
2012 Fiscal Year Funding Amount
$91,691
Fund Source

This project will support a civic engagement cohort that will be offered in southwest Minnesota to foster partnering and build capacity of local government, organizations, and residents for effective civic engagement in water protection and restoration. This project will also build networks and the skill set of local resource professionals to do effective civic engagement work for water restoration and protection. The cohort will be administered through the Minnesota River Board (MRB), established in 1995 with a goal of focusing water management efforts on the local level.

Big Stone
Blue Earth
Brown
Chippewa
Cottonwood
Douglas
Faribault
Grant
Jackson
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
McLeod
Murray
Nicollet
Nobles
Otter Tail
Pipestone
Pope
Redwood
Renville
Rock
Sibley
Stevens
Swift
Traverse
Waseca
Watonwan
Yellow Medicine
Recipient
Chisago Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$196,079
Fund Source

This project will support the necessary activities for improving the water quality and biological community by reducing nutrients, sediment levels and managing in-stream habitat within the Goose Creek 10-digit HUC Watershed. This restoration and protection plan will identify pollutant load reduction estimates and management strategies that will be used to obtain the TMDL goals outlined in the plan.

Anoka
Chisago
Isanti
Pine
Ramsey
Washington
Recipient
Lower Mississippi River Watershed Management Organization (LMRWMO)
2012 Fiscal Year Funding Amount
$189,999
2013 Fiscal Year Funding Amount
$29,995
Fund Source

This project will complete a comprehensive study, following a rational, step-wise process of data analysis, response modeling and comparison to the water quality standards, followed by impairment diagnosis, modeling of improvement and protection options, and development of a WRAP Report and Implementation Plan for Sunfish lake, Thompson lake, Pickerel lake, and Rogers lake.

Anoka
Carver
Dakota
Hennepin
Ramsey
Sherburne
Washington
Wright
Recipient
Vermillion River Watershed Joint Powers Organization (Fiscal Agent: Dakota County)
2012 Fiscal Year Funding Amount
$189,170
Fund Source

This project will consist of identifying the candidate causes of biological stress and to develop and implement a public and stakeholder participation process that encourages local ownership of water quality problems and solutions. The Stressor ID process will be done using existing data, identifying data gaps, gathering new data, developing load duration curves, and refinement of the candidate causes. The civic engagement work will include compiling and reviewing existing data on community capacity and assessing that information.

Dakota
Goodhue
Scott
Wabasha
Washington
Recipient
Southeast Minnesota Water Resources Board-Winona State University
2012 Fiscal Year Funding Amount
$80,737
Fund Source

This project will build network and the skill set of local resource professionals to do effective civic engagement work for water restoration and protection in Southeast Minnesota. The cohort will be administered through the Southeast Minnesota Water Resources Board (SE MN WRB) which is an area wide Joint Powers Board (JPB) established to help improve and protect the water resources of the area through coordinating local water planning efforts. This JPB has successfully administered water quality grants in the past that have positively impacted the water resources of this region.

Blue Earth
Dakota
Dodge
Fillmore
Freeborn
Goodhue
Houston
Le Sueur
Mower
Olmsted
Rice
Scott
Steele
Wabasha
Waseca
Washington
Winona
Recipient
Kanabec Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$201,992
Fund Source

This project will provide baseline data through water monitoring, recording and analyzing the results of six unassessed rivers/tributaries, three unassessed lakes and five storm water outlets in the city of Mora which drain to the Snake River; promote and implement approved BMP’s.

Anoka
Chisago
Isanti
Kanabec
Mille Lacs
Pine
Washington
Recipient
Dakota County Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$50,000
Fund Source

This project will provide cost share funding to community organizations and associations to construct medium-sized water quality conservation practices in Dakota County.

Dakota
Recipient
Comfort Lake Forest Lake Watershed District
2012 Fiscal Year Funding Amount
$30,200
Fund Source

The Comfort Lake Forest Lake Watershed includes numerous private ditches and partially drained wetlands which are a priority for mapping, assessment and restoration. The project will include the mapping and assessment of all drained and partially drained wetlands in the watershed. In addition, a web-based GIS system will be developed to inventory, assess, target and track the effectiveness of various conservation practices towards the attainment of water quality goals.

Chisago
Washington
Recipient
Dakota County Water Resources Department- Jill V. Trescott, (952) 891-7019
2016 Fiscal Year Funding Amount
$1,838
2015 Fiscal Year Funding Amount
$23,176
2014 Fiscal Year Funding Amount
$36,554
2013 Fiscal Year Funding Amount
$35,572
2012 Fiscal Year Funding Amount
$36,122
Fund Source

This project provides information to better understand nitrogen fertilizer management and the potential impacts to local groundwater.

Goals:

Dakota
Recipient
Itasca County Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$25,595
Fund Source

This project will collect intermediate watershed load monitoring data on the Bigfork River which is critical to the identification of stressors and assist in defining areas of concern within the Bigfork Watershed and its greater Rainy River Watershed. Itasca County SWCD will closely collaborate with Koochiching SWCD and MPCA on this project.

Itasca
Koochiching
Recipient
Board of Water & Soil Resources
2012 Fiscal Year Funding Amount
$600,000
2013 Fiscal Year Funding Amount
$397,580
Fund Source

BWSR will administer funding to eligible County projects that provide funds and other assistance to low income property owners to upgrade or replace Noncompliant Septic Systems. BWSR will also manage annual reporting completed by each County.

Aitkin
Beltrami
Big Stone
Carlton
Carver
Cass
Chippewa
Chisago
Clearwater
Cook
Cottonwood
Crow Wing
Dakota
Dodge
Douglas
Hubbard
Isanti
Jackson
Kandiyohi
Koochiching
Lac qui Parle
Lake of the Woods
Lincoln
Marshall
McLeod
Morrison
Norman
Olmsted
Pennington
Pine
Pipestone
Polk
Pope
Red Lake
Roseau
Scott
Sibley
St. Louis
Stearns
Steele
Todd
Traverse
Wadena
Waseca
Washington
Wilkin
Winona
Yellow Medicine
Recipient
Lake of the Woods Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$108,044
Fund Source

This project involves the water quality monitoring of, and data analysis for four major watersheds (8-digit Hydrologic Unit Codes) in the Rainy River Basin. This monitoring will assist in providing the water chemistry data needed to calculate annual pollutant loads for the Major Watershed Pollutant Load Monitoring Network (MWPLMN) and provide short term data sets of select parameters to other Agency programs.

Beltrami
Itasca
Koochiching
Lake of the Woods
St. Louis
Recipient
Le Sueur County
2012 Fiscal Year Funding Amount
$21,100
Fund Source

Gorman Lake has elevated nutrient levels and drains into the Cannon River. This project will provide a subgrant to the Gorman Lake Association to install a two-tiered retention pond to reduce both phosphorus and peak flow from a drainage ditch from reaching Gorman Lake. Project partners include three agricultural producers, the Le Sueur Soil and Water Conservation District and the Natural Resources Conservation Service.

Le Sueur
Recipient
Comfort Lake-Forest Lake Watershed District
2012 Fiscal Year Funding Amount
$176,047
Fund Source

Comfort Lake is one of Chisago county's largest recreational lakes. Comfort Lake is of regional significance with public access for boating, fishing and swimming. A pollution reduction study was conducted for the lake because of decreasing water quality. This study identified highly urban areas as one of the sources of nutrients.

Chisago
Washington
Recipient
Metropolitan Council
2009 Fiscal Year Funding Amount
$67,899
2010 Fiscal Year Funding Amount
$79,070
2010 Fiscal Year Funding Amount
$75,783
2011 Fiscal Year Funding Amount
$64,020
2011 Fiscal Year Funding Amount
$85,473
2012 Fiscal Year Funding Amount
$70,469
2013 Fiscal Year Funding Amount
$179,573
2014 Fiscal Year Funding Amount
$160,004
Fund Source

In 2005, Metropolitan Council was directed to carry out regional water supply planning activities under Minnesota Statutes, section 473.1565. Working closely with the region's many water supply stakeholders and under the guidance of a metropolitan area water supply advisory committee, Metropolitan Council developed and adopted a metropolitan area master water supply plan (master plan) in 2010. The plan provides a framework for water supply planning and identifies actions needed to achieve the goal of ensuring sustainable water supplies across the region.

Anoka
Carver
Dakota
Hennepin
Ramsey
Scott
Washington
Recipient
South Washington Watershed District
2012 Fiscal Year Funding Amount
$156,645
Fund Source

In partnership with the Washington Conservation District and City of Woodbury, this project will improve water quality in Colby Lake through implementing 30 priority small-scale water quality conservation practices. Projects may include bioretention, vegetated swales and pond modifications. Priority projects were identified as part of the Colby Lake Watershed Retrofit Assessment and represent the most cost-effective means to reduce excess phosphorus loads that have impacted Colby Lake.

Washington
Recipient
Brown's Creek Watershed District
2012 Fiscal Year Funding Amount
$158,800
Fund Source

In collaboration with the University of Minnesota St. Anthony Falls Laboratory, City of Stillwater and MN DNR Waters and Fisheries an iron-enhanced sand filter will be designed. This filter will remove approximately 118 pounds of total phosphorous per year from an area of Stillwater that ultimately drains to the St. Croix River, a national Wild and Scenic River that has a decling water quality trend.

Washington
Recipient
Koochiching County Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$73,777
2014 Fiscal Year Funding Amount
$181,976
Fund Source

The Koochiching County SWCD staff will collect water chemistry and field parameters at specific times to determine amount of contaminant load into each stream. These sites will coincide with locations where stream flow data is also being collected. This project will focus on watershed load monitoring in both the Big Fork and Little Fork River watersheds.

Itasca
Koochiching
St. Louis
Recipient
Middle St. Croix Watershed Management Organization
2012 Fiscal Year Funding Amount
$45,525
Fund Source

Lily Lake, near Stillwater, is a popular recreational spot for residents with its swimming beach, fishing pier, and canoe access. Lily Lake's water quality is declining because of excess nutrients. Restoring it is a priority for the community of Stillwater.

Washington
Recipient
Middle St. Croix Watershed Management Organization
2012 Fiscal Year Funding Amount
$194,900
Fund Source

Lily Lake,near Stillwater, is a popular recreational spot for residents with its swimming beach, fishing pier, and canoe access. Lily Lake's water quality is declining because of excess nutrients. Restoring it is a priority for the community of Stillwater.
This project is a continaution project of the Phase I project that started in the spring of 2011 and complements the Phase II project recently funded in 2012. Specifically, this project will implement two large stormwater retrofits in large parking lots of DiaSoren Manufacturing and the Valley Ridge Mall.

Washington
Recipient
Metropolitan Council/Minnesota Geological Survey
2011 Fiscal Year Funding Amount
$23,181
2012 Fiscal Year Funding Amount
$27,850
Fund Source

On behalf of the Metropolitan Council, the Minnesota Geological Survey evaluated the vulnerability of glacial aquifers in the Twin Cities metropolitan area. The project improved upon previous vulnerability assessments by incorporating a substantial amount of new aquifer property information and blending methods previously used by the Minnesota Departments of Health and Natural Resources. The result is a consistent vulnerability assessment across the metropolitan area based on the most up-to-date information available.

Anoka
Carver
Chisago
Dakota
Hennepin
Isanti
Ramsey
Scott
Sherburne
Washington
Wright
Recipient
Middle St. Croix Watershed Management Organization
2012 Fiscal Year Funding Amount
$37,925
Fund Source

MuKusick Lake's water quality is declining because of excess nutrients and restoring it is a priority for the Stillwater community.
This project will work to implement priority stormwater treatment projects that were identified in the 2010 McKusick Lake Stormwater Retrofit Assessment. This project will be the first phase of stormwater treatment implementation projects within the McKusick Lake watershed and will provide approximately 10% of the needed phosphorus reduction.

Washington
Recipient
Metro Conservation Districts
2012 Fiscal Year Funding Amount
$216,181
Fund Source

Through a long standing partnership, this project will continue to implement a process formalized with a 2010 Clean Water Fund Grant to conduct stormwater sub-watershed assessments. The goal of the sub-watershed assessments is to accelerate water quality improvements by focusing efforts in high priority areas. Specifically, subwatershed assessments are a tool used to identify the most effective urban stormwater conservation practice by location.

Anoka
Carver
Chisago
Dakota
Hennepin
Isanti
Ramsey
Scott
Sherburne
Washington
Wright
2019 Fiscal Year Funding Amount
$0
2018 Fiscal Year Funding Amount
$0
2017 Fiscal Year Funding Amount
$0
2016 Fiscal Year Funding Amount
$0
2015 Fiscal Year Funding Amount
$0
2014 Fiscal Year Funding Amount
$0
2013 Fiscal Year Funding Amount
$0
2012 Fiscal Year Funding Amount
$1,000,000
2011 Fiscal Year Funding Amount
$4,000,000
Fund Source

This project will establish a groundwater monitoring network in the 11 county metropolitan area. The network will provide information about aquifer characteristics and natural water trends by monitoring healthy aquifers (non-stressed systems). The project will also develop an automated system that captures groundwater level and water use data. This system will enhance evaluation of changes in aquifers that are stressed by pumping from existing wells.

Anoka
Carver
Chisago
Dakota
Hennepin
Isanti
Ramsey
Scott
Washington
Wright
Sherburne
2014 Fiscal Year Funding Amount
$0
2013 Fiscal Year Funding Amount
$1,350,000
2012 Fiscal Year Funding Amount
$1,350,000
2011 Fiscal Year Funding Amount
$2,800,000
2010 Fiscal Year Funding Amount
$2,800,000
Fund Source

This project will create a high accuracy elevation dataset - critical for effectively planning and implementing water quality projects - for the state of Minnesota using LiDAR (Light Detection and Ranging) and geospatial mapping technologies. Although some areas of the state have been mapped previously, many counties remain unmapped or have insufficient or inadequate data. This multi-year project, to be completed in 2012, is a collaborative effort of Minnesota's Digital Elevation Committee and partners with county surveyors to ensure accuracy with ground-truthing.

Anoka
Benton
Carlton
Carver
Cook
Dakota
Goodhue
Hennepin
Isanti
Kanabec
Lake
Meeker
Mille Lacs
Morrison
Ramsey
Scott
Sherburne
St. Louis
Washington
Recipient
North Koochiching Area San Dist
2012 Fiscal Year Funding Amount
$1,344,200
Fund Source

Construct wastewater treatment improvements to meet TMDL wasteload requirement

Koochiching
Recipient
Vermillion River Watershed Joint Powers Organization -Dakota County
2012 Fiscal Year Funding Amount
$244,000
Fund Source

Water from an area in and near the interchange of US Highway 52 and MN Highway 55 spills onto a steep bluff face at the head of a ravine. This has accelerated the amount of sediment eroding from the ravine into the Mississippi River. In partnership with Dakota County, Dakota Soil and Water Conservation District, the City of Rosemount, Minnesota Department of Transportation, Flint Hills Resources, the Vermillion River Watershed Joint Powers Organization has been working for several years to identify a solution to this severe erosion problem.

Dakota
Recipient
Red River Watershed Management Board
2012 Fiscal Year Funding Amount
$194,490
Fund Source

This project will provide land and water managers in the Red River Basin with data and online tools to prioritize actions on the landscape that achieve water quality objectives identified in local and state plans. This will help identify strategically important locations for implementing erosion control and water management practices. Standardized watershed-based data products will be integrated into a web-based planning tool which will be added to the Red River Basin Decision Information Network (RRBDIN) being developed as part of the Red River Watershed Feasibility Study.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Itasca
Kittson
Koochiching
Lake of the Woods
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Barr Engineering
2012 Fiscal Year Funding Amount
$3,000
Fund Source

This project will complete the final Implementation Plan, semi-annual and final reports and hold project meetings. The Implementation Plan will identify target areas and priorities for implementation strategies to improve water quality for Bluff Creek. This project will build the groundwork so Bluff Creek will meet water quality standards for aquatic life in the future.

Carver
Dakota
Hennepin
Le Sueur
McLeod
Nicollet
Ramsey
Renville
Rice
Scott
Sibley
Recipient
City of Bayport
2012 Fiscal Year Funding Amount
$9,002
Fund Source
Collect and analyze data upgradient from the Bayport wellhead protection area and determine the potential impacts to Bayport's water supply; Feasibility study to evaluate options for an overlay district, potential additional TCE water treatment, sentry mo
Washington
Recipient
City of Hugo
2012 Fiscal Year Funding Amount
$7,000
Fund Source
Equipment for long term monitoring of water levels and installation
Washington
Recipient
City of St. Paul Park
2012 Fiscal Year Funding Amount
$4,500
Fund Source
Update list of properties with undocumented, unused or cross-connected wells; Educate property owners of best management practices and options to seals the wells on their property
Washington
Recipient
Cedarhurst
2012 Fiscal Year Funding Amount
$430
Fund Source
Install backflow prevention device
Washington