Minnesota's Legacy

All Projects

Showing 1 - 40 of 45 | Export projects
Recipient
Peer Engineering
2014 Fiscal Year Funding Amount
$115,910
Fund Source

Peer Engineering, Inc. (Peer) will evaluate and recommend to MPCA groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration. Superfund staff will assist in the project by providing oversight of contractual requirements and provide technical assistance as needed.

Dakota
Hennepin
Mower
Rice
Washington
Recipient
Barr Engineering Company
2011 Fiscal Year Funding Amount
$18,020
Fund Source

This project will develop a Final TMDL report and Implementation Plan for the Bluff Creek Watershed.  The main outcomes of this project are the development of a Final TMDL Report approved by MPCA and EPA and a Final Implementation Plan approved by MPCA. 

Carver
Dakota
Hennepin
Le Sueur
McLeod
Rice
Scott
Sibley
Recipient
Metropolitan Council/Environmental Financial Group Inc.
2010 Fiscal Year Funding Amount
$11,785
2011 Fiscal Year Funding Amount
$36,754
Fund Source

On behalf of the Metropolitan Council, Environmental Financial Group Inc. generated a matrix of water conservation programs with detailed information about the costs and benefits of the programs. Tools were also developed to allow users to calculate potential water savings, estimate program implementation costs, and test the effects of various water conservation programs and rate structures.

Aitkin
Anoka
Becker
Beltrami
Benton
Big Stone
Blue Earth
Brown
Carlton
Carver
Cass
Chippewa
Chisago
Clay
Clearwater
Cook
Cottonwood
Crow Wing
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Hennepin
Houston
Hubbard
Isanti
Itasca
Jackson
Kanabec
Kandiyohi
Kittson
Koochiching
Lac qui Parle
Lake
Lake of the Woods
Le Sueur
Lincoln
Lyon
Mahnomen
Marshall
Martin
McLeod
Meeker
Mille Lacs
Morrison
Mower
Murray
Nicollet
Nobles
Norman
Olmsted
Otter Tail
Pennington
Pine
Pipestone
Polk
Pope
Ramsey
Red Lake
Redwood
Renville
Rice
Rock
Roseau
Scott
Sherburne
Sibley
St. Louis
Statewide
Stearns
Steele
Stevens
Swift
Todd
Traverse
Wabasha
Wadena
Waseca
Washington
Watonwan
Wilkin
Winona
Wright
Yellow Medicine
Recipient
Emmons & Olivier Resources (EOR)
2013 Fiscal Year Funding Amount
$51,477
Fund Source

This project will develop a TMDL for all impaired lakes within the Crow Wing Watershed by furthering data collection in the watershed, analysis of data, allocation calculations, and introducing outreach and stakeholder participation activities.

Becker
Cass
Clearwater
Crow Wing
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
Emmons & Olivier Resources
2012 Fiscal Year Funding Amount
$15,041
Fund Source

This first year of the project will collect available data relevant to the TMDL development, determine the data sets best suited for the TMDL development. Gain a better understanding of the watershed and impaired lakes, and assessment of all potential sources (internal and external) of the causes of lake impairment. EOR will also review the data produced by the MPCA for the impairment assessment for each of the lakes during year 1 of the project.

Becker
Cass
Clearwater
Crow Wing
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
Wenck Associates, Inc.
2012 Fiscal Year Funding Amount
$29,872
Fund Source

This project willl complete a final TMDL document that will be submitted to EPA for approval. Document will include Lake Osakis, Clifford Lake, Faille Lake, and Smith Lake impairments. A final technical memorandum describing the elements of the model framework and any deviations from the recommended construction methodology will be also be provided with the submission of the watershed models.

Douglas
Morrison
Otter Tail
Todd
Wadena
Recipient
RESPEC
2012 Fiscal Year Funding Amount
$67,972
Fund Source

This project will construct three watershed framework models built using the Hydrologic Simulation Program FORTRAN. These executable models will simulate hydrology at the 12-digit HUC subbasin scale. An HSPF model will be built for each of the following 8-HUC watersheds: Red Lake River (09020303) and the Clearwater River (09020305).

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
RESPEC
2012 Fiscal Year Funding Amount
$49,996
Fund Source

This project will finalize HSPF watershed model construction by incorporating internal phosphorus loading in modeled lakes, run a suite of implementation scenarios and generate a GenScn project containing model output. The consultant will produce HSPF watershed models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will deliver all modeling files for baseline and implementation scenarios and provide a GenScn project containing model output.

Becker
Carver
Cass
Clearwater
Crow Wing
Douglas
Hennepin
Hubbard
Kandiyohi
McLeod
Meeker
Morrison
Otter Tail
Pope
Renville
Sibley
Stearns
Todd
Wadena
Wright
Recipient
Emmons & Olivier Resources
2013 Fiscal Year Funding Amount
$99,355
Fund Source

This project will complete a pollutant source identification and subwatershed information report and support the development of a Draft Restoration and Protection Plan (RAPP). It will also support the devlopment of a Implementation Plan that will identify target areas for BMP implementation for bacteria reductions.

Anoka
Benton
Carver
Crow Wing
Dakota
Douglas
Hennepin
Kandiyohi
McLeod
Meeker
Mille Lacs
Morrison
Pope
Ramsey
Sherburne
Sibley
Stearns
Todd
Washington
Wright
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$70,000
Fund Source

This project will complete spatial and temporal revisions , recalibration and validation of 7 watershed HSPF models. These fully functioning calibrated validated executable models will simulate hydrology, sediment (sand, silt, and clay), temperature, phosphorus, nitrogen, dissolved oxygen, biochemical oxygen demand, and algae at the 12-digit HUC subbasin scale (or finer).

Blue Earth
Brown
Carver
Cottonwood
Dakota
Faribault
Freeborn
Jackson
Le Sueur
Lincoln
Lyon
Martin
McLeod
Murray
Nicollet
Pipestone
Ramsey
Redwood
Renville
Rice
Scott
Sibley
Steele
Waseca
Watonwan
Yellow Medicine
Recipient
LimnoTech
2013 Fiscal Year Funding Amount
$121,916
Fund Source

This project will construct, calibrate, and validate an HSPF watershed model for the Zumbro River watershed. The consultant will produce HSPF watershed models that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDLs). The consultant will clearly demonstrate that the models generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen that are consistent with available sets of observed data.

Dodge
Goodhue
Mower
Olmsted
Rice
Steele
Wabasha
Recipient
Wenck Associates, Inc.
2013 Fiscal Year Funding Amount
$1,879
Fund Source

This project will support the completion of a final draft Total Maximum Daily Load (TMDL) document for the Osakis, Smith and Faille Lakes TMDL and the submittal to EPA for final approval.

Douglas
Meeker
Morrison
Pope
Stearns
Todd
Recipient
Emmons and Oliver Resources, Inc.
2013 Fiscal Year Funding Amount
$22,012
Fund Source

The goal of this project is to develop a phosphorus TMDL for the six impaired lakes in the southwest portion of the Rice Creek Watershed District; Island Lake, Little Lake Johanna, Long Lake, East Moore Lake, Pike Lake and Lake Valentine.

Anoka
Carver
Dakota
Hennepin
Ramsey
Sherburne
Stearns
Wright
Recipient
Barr Engineering
2013 Fiscal Year Funding Amount
$36,342
Fund Source

This project will complete a TMDL equation and report and an implementation plan for Deer Creek. The TMDL report will describe turbidity impacts to aquatic life uses of Deer Creek, correlate turbidity to other pollutants (sediment, suspended solids, etc.), describe and quantify unique turbidity/sediment stressors which include groundwater influences, legacy impacts of the watershed and stream channel, significant in-stream and near stream sources (slumps, bank erosion, etc.) and upland contributions.

Carlton
Pine
St. Louis
Recipient
Barr Engineering Company
2011 Fiscal Year Funding Amount
$86,020
Fund Source

Deer Creek has been identified as an impaired water body. This project will quantify the reductions in pollutant loading that would be necessary to bring water quality in the creek to an acceptable level. The project also includes collection of any additional data needed for stream channel modeling scenarios.

Carlton
Pine
St. Louis
Recipient
Metropolitan Council/Barr Engineering Company
2010 Fiscal Year Funding Amount
$35,246
2011 Fiscal Year Funding Amount
$31,754
Fund Source

On behalf of the Metropolitan Council, Barr Engineering Company developed maps and supporting information to characterize the relationship between surface waters and groundwater, identifying surface waters most likely to be impacted by groundwater withdrawals in the region. This project also provided guidance on effective resource monitoring strategies and costs for each type of surface water feature.

Anoka
Carver
Chisago
Dakota
Hennepin
Isanti
Ramsey
Scott
Sherburne
Washington
Wright
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$99,986
Fund Source

This project will finalize HSPF watershed model construction and complete the calibration/validation process. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval.

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
Aqua Terra Consultants
2013 Fiscal Year Funding Amount
$36,848
Fund Source

This project will maximize the utility and usefulness of three HSPF models that have been constructed and calibrated for hydrology. The contractor will identify and reduce parameterization errors in the following three HSPF models: 1) Buffalo River Watershed, 2 ) Thief River Watershed, 3) Bois de Sioux-Mustinka Watersheds. This will result, not only in a better hydrology calibration, but will also improve each of the models’ ability to more accurately estimate sediment and pollutant loads and concentrations.

Becker
Beltrami
Big Stone
Clay
Grant
Marshall
Otter Tail
Pennington
Roseau
Stevens
Traverse
Wilkin
Recipient
Tetra Tech
2013 Fiscal Year Funding Amount
$174,990
Fund Source

The goal of this project is to construct, calibrate, and validate three HSPF watershed models. The project will result in HSPF models that can readily be used to provide information to support conventional parameter TMDLs. The models are expected to generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.

St. Louis
Pine
Lake
Itasca
Carlton
Aitkin
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$253,710
Fund Source

The goal of this project is to construct, calibrate, and validate five Hydrologic Simulation Program FORTRAN (HSPF) watershed models. The outcome will be HSPF models that can readily be used to provide information to support conventional parameter TMDLs. These models will generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.

Wright
Todd
Stearns
St. Louis
Sherburne
Morrison
Mille Lacs
Meeker
Kanabec
Itasca
Isanti
Chisago
Cass
Carlton
Benton
Anoka
Aitkin
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$89,968
Fund Source

The goal of this project is to construct, calibrate, and validate a watershed model using Hydrologic Simulation Program FORTRAN (HSPF). The project will result in a HSPF model that can readily be used to provide information to support conventional parameter TMDLs.

Kittson
Marshall
Roseau
Recipient
Barr Engineering
2013 Fiscal Year Funding Amount
$39,121
Fund Source

The goal of this project is to supplement and refine the Deer Creek Watershed TMDL Report and Implementation Plan project with detailed determinations of critical source areas and prioritization of the associated management practices, facilitated by additional meetings with local resource managers and validated with a field survey. Completed work will more fully inform the TMDL report and TMDL implementation plan on critical source areas of sediment and quantify those sources.

Carlton
Pine
St. Louis
Recipient
Houston Engineering
2012 Fiscal Year Funding Amount
$67,996
Fund Source

This project will continue to develop, and calibrate/validate the hydrology of an HSPF watershed model for the Thief River watershed. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval. The consultant will produce an HSPF watershed model that can readily be used to provide information to support conventional parameter TMDLs.

Beltrami
Marshall
Pennington
Roseau
Recipient
AQUA TERRA Consultants
2011 Fiscal Year Funding Amount
$99,950
Fund Source

This project will support construction of three watershed framework models built using the Hydrologic Simulation Program FORTRAN (HSPF). These executable models will simulate hydrology at the subbasin scale. An HSPF model will be built for each of these major watersheds: Crow Wing River, Redeye River, and Long Prairie River.

Becker
Cass
Clearwater
Crow Wing
Douglas
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
RESPEC
2011 Fiscal Year Funding Amount
$149,677
Fund Source

This project will finalize HSPF watershed model construction and complete the calibration/validation process for the following three watersheds: North Fork Crow River, South Fork Crow River, and Sauk River.

Carver
Douglas
Hennepin
Kandiyohi
McLeod
Meeker
Morrison
Pope
Renville
Sibley
Stearns
Todd
Wright
Recipient
Aqua Terra Consultants
2012 Fiscal Year Funding Amount
$120,238
2013 Fiscal Year Funding Amount
$134,980
Fund Source

This project will continue HSPF watershed model construction beyond the initial framework development. The consultant will add representation of point source discharges to the model. The consultant will also compile flow data for the purposes of calibration and validation. Finally, an initial hydrologic calibration will be performed and submitted for approval.

Becker
Cass
Clearwater
Crow Wing
Douglas
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$128,887
Fund Source
The goal of this project is to extend the existing HSPF models through 2012 in the Chippewa Watershed (07020005) and Hawk-Yellow Medicine Watershed (07020004) to incorporate recent monitoring data to support current MPCA business needs and sediment source investigations.
Blue Earth
Brown
Carver
Chippewa
Cottonwood
Dakota
Douglas
Faribault
Freeborn
Hennepin
Kandiyohi
Le Sueur
Lincoln
Lyon
McLeod
Murray
Nicollet
Otter Tail
Pipestone
Pope
Renville
Rice
Scott
Sibley
Steele
Swift
Waseca
Watonwan
Yellow Medicine
Recipient
RESPEC
2011 Fiscal Year Funding Amount
$214,963
Fund Source

This project will complete spatial and temporal revisions of 6 Hydrologic Simulation Program FORTRAN (HSPF) models, the recalibration and validation of 7 watershed HSPF models, and the revision of the drainage network and point source representation of the Pomme de Terre HSPF model.

Big Stone
Blue Earth
Brown
Carver
Cottonwood
Dakota
Douglas
Faribault
Freeborn
Grant
Hennepin
Jackson
Le Sueur
Lincoln
Lyon
Mahnomen
Martin
McLeod
Murray
Nicollet
Norman
Otter Tail
Pipestone
Polk
Ramsey
Redwood
Renville
Rice
Scott
Sibley
Steele
Stevens
Swift
Waseca
Watonwan
Yellow Medicine
Recipient
Wenck Associates, Inc.
2019 Fiscal Year Funding Amount
$187,625
Fund Source

The purpose of this work is to develop Total Maximum Daily Loads (TMDLs; a federal clean Water Act requirement) for streams and lakes in the Kettle River and Upper St. Croix watersheds. This and other technical information will be used to develop a separate report called a Watershed Restoration and Protection Strategy (WRAPS) report.

Aitkin
Carlton
Kanabec
Pine
Recipient
AECOM, Inc.
2010 Fiscal Year Funding Amount
$35,000
Fund Source

Phase 4 of the Lake Winona Total Maximum Daily Load (TMDL) project will finalize the draft Lake Winona TMDL, dated November 2009, by completing additional data analysis, lake quality modeling, updating the TMDL report, and supporting the public involvement process.

Cass
Douglas
Morrison
Otter Tail
Todd
Recipient
LimnoTech
2013 Fiscal Year Funding Amount
$59,116
Fund Source

The MPCA has selected the Soil and Water Assessment Tool (SWAT) watershed model to simulate watershed hydrology and water quality to assess various restoration scenarios in the Little Cannon River watershed. The SWAT model is an important tool in developing an understanding of existing conditions and simulating conditions under various management scenarios to inform the development of implementation strategies and plans to restore and protect streams and lakes.

Blue Earth
Dakota
Dodge
Freeborn
Goodhue
Le Sueur
Rice
Scott
Steele
Waseca
Recipient
U.S. Army Corps of Engineers (USACE)
2012 Fiscal Year Funding Amount
$163,100
Fund Source

This project will provide a protocol for prioritizing sites in the St. Louis Area of Concern (AOC ) for restoration based on site-specific bioavailability considerations. Despite large data collection efforts focused on sediment chemistry, the extent to which sediment with moderate levels of contamination is available for uptake into biota and therefore contributing to Beneficial Use Impairments (BUI)s is still largely unknown.

St. Louis
Lake
Carlton
Recipient
U.S. Environmental Protection Agency, Great Lakes Restoration Initiative (USEPA-GLRI)
2013 Fiscal Year Funding Amount
$219,668
Fund Source

The St. Louis River Area of Concern (SLRAOC) conservation partners are focused on removing Beneficial Use Impairments (BUI) in the estuary and eventually delisting the SLRAOC. Cooperative efforts between multiple resource agencies and regional stakeholders have identified a host of restoration objectives, developed project support activities, and partially secured funding that includes a state commitment through the Minnesota Clean Water Fund.

Carlton
Lake
St. Louis
Recipient
U.S. Environmental Protection Agency, Great Lakes Restoration Initiative (USEPA-GLRI)
2013 Fiscal Year Funding Amount
$1,112,252
Fund Source

The St. Louis River Area of Concern (SLRAOC) conservation partners are focused on removing Beneficial Use Impairments (BUI) in the estuary and eventually delisting the SLRAOC. Cooperative efforts between multiple resource agencies and regional stakeholders have identified a host of restoration objectives, developed project support activities, and partially secured funding that includes a state commitment through the Minnesota Clean Water Fund.

Carlton
Lake
St. Louis
Recipient
Emmons & Olivier Resources (EOR)
2013 Fiscal Year Funding Amount
$119,888
Fund Source

This project will build a working watershed SWAT model that can readily be used by the MPCA to provide information to support conventional parameter TMDLs and to identify critical areas for BMP installation/evaluation that can be supported by the efforts of the local Farmer Led Council as well as other land owners within the Mississippi River-Winona watershed.

Olmsted
Wabasha
Winona
Recipient
Emmons & Olivier Resources
2013 Fiscal Year Funding Amount
$53,465
Fund Source

This project will define the major factors causing harm to fish and other river and stream life within the Nemadji watershed. Stressor identification is a formal and rigorous process to identify these factors, explain the linkages between the results of biological monitoring and water quality assessments, and organize this information into a structure of scientific evidence that supports the conclusions of the process. Stressor identification is a component of the Watershed Restoration and protection (WRAP) approach.

Carlton
Pine
St. Louis
Recipient
Wenck Associates, Inc.
2013 Fiscal Year Funding Amount
$4,826
Fund Source

This project will support the review of all public comments submitted for the North Fork Crow River TMDL and make appropriate edits and changes to the draft TMDL based on MPCA guidance.

Carver
Hennepin
Kandiyohi
McLeod
Meeker
Pope
Stearns
Wright
Recipient
United States Geological Survey (USGS)
2012 Fiscal Year Funding Amount
$10,800
2013 Fiscal Year Funding Amount
$11,119
Fund Source

This project will collect real-time parameter data for specific conductance, water temperature, pH, dissolved oxygen, turbidity and stream flow at the United States geological Survey (USGS) gaging stations located at Fargo, ND and Grand Forks, ND on the Red River of the North; and publish the data both on the USGS NWIS website and in the USGS Annual Report.

Beltrami
Clay
Clearwater
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Wilkin
Recipient
Barr Engineering
2012 Fiscal Year Funding Amount
$3,000
Fund Source

This project will complete the final Implementation Plan, semi-annual and final reports and hold project meetings. The Implementation Plan will identify target areas and priorities for implementation strategies to improve water quality for Bluff Creek. This project will build the groundwork so Bluff Creek will meet water quality standards for aquatic life in the future.

Carver
Dakota
Hennepin
Le Sueur
McLeod
Nicollet
Ramsey
Renville
Rice
Scott
Sibley
Recipient
Wenck Associates, Inc.
2013 Fiscal Year Funding Amount
$952
Fund Source

This project will support the review of all public comments submitted for the Buffalo Creek TMDL and make appropriate edits and changes to the draft TMDL based on MPCA guidance.