Recipient
Metropolitan Council/Environmental Financial Group Inc.
2010 Fiscal Year Funding Amount
$11,785
2011 Fiscal Year Funding Amount
$36,754
Fund Source

On behalf of the Metropolitan Council, Environmental Financial Group Inc. generated a matrix of water conservation programs with detailed information about the costs and benefits of the programs. Tools were also developed to allow users to calculate potential water savings, estimate program implementation costs, and test the effects of various water conservation programs and rate structures.

Aitkin
Anoka
Becker
Beltrami
Benton
Big Stone
Blue Earth
Brown
Carlton
Carver
Cass
Chippewa
Chisago
Clay
Clearwater
Cook
Cottonwood
Crow Wing
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Hennepin
Houston
Hubbard
Isanti
Itasca
Jackson
Kanabec
Kandiyohi
Kittson
Koochiching
Lac qui Parle
Lake
Lake of the Woods
Le Sueur
Lincoln
Lyon
Mahnomen
Marshall
Martin
McLeod
Meeker
Mille Lacs
Morrison
Mower
Murray
Nicollet
Nobles
Norman
Olmsted
Otter Tail
Pennington
Pine
Pipestone
Polk
Pope
Ramsey
Red Lake
Redwood
Renville
Rice
Rock
Roseau
Scott
Sherburne
Sibley
St. Louis
Statewide
Stearns
Steele
Stevens
Swift
Todd
Traverse
Wabasha
Wadena
Waseca
Washington
Watonwan
Wilkin
Winona
Wright
Yellow Medicine
Recipient
LimnoTech
2013 Fiscal Year Funding Amount
$121,916
Fund Source

This project will construct, calibrate, and validate an HSPF watershed model for the Zumbro River watershed. The consultant will produce HSPF watershed models that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDLs). The consultant will clearly demonstrate that the models generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen that are consistent with available sets of observed data.

Dodge
Goodhue
Mower
Olmsted
Rice
Steele
Wabasha
Recipient
LimnoTech
2018 Fiscal Year Funding Amount
$75,630
Fund Source

The consultant LimnoTech will support response to Total Maximum Daily Load (TMDL) comments the peer review process, United States Environmental Protection Agency and public notice. They will then revise the TMDL document as needed and attend internal and external project meetings.

Anoka
Carver
Dakota
Dodge
Goodhue
Hennepin
Le Sueur
McLeod
Mower
Nicollet
Olmsted
Ramsey
Renville
Rice
Scott
Sherburne
Sibley
Steele
Wabasha
Washington
Wright
Recipient
LimnoTech
2016 Fiscal Year Funding Amount
$62,280
Fund Source

The goal of this project is to prepare a draft Lake Pepin Total Maximum Daily Load (TMDL) Report. Lake Pepin is impaired by high levels of nutrients that cause excessive growth of algae.

Dakota
Goodhue
Scott
Wabasha
Recipient
LimnoTech
2017 Fiscal Year Funding Amount
$48,667
Fund Source

The goal of this project is to finalize the draft Lake Pepin Total Maximum Daily Load (TMDL) Report, issue it for public comment, address comments, and finalize the report. Lake Pepin is impaired by high levels of nutrients that cause excessive growth of algae. High levels of sediment, carried in by major river systems, also affect the lake. The sediment is filling in the lake at a much faster rate than before Minnesota was settled and intensely farmed. Nutrients and sediment are distinct yet inter-related pollutants, and are being addressed in separate TMDL reports.

Dakota
Goodhue
Scott
Wabasha
Recipient
LimnoTech
2019 Fiscal Year Funding Amount
$11,920
Fund Source

The goal of this project is to finalize the Lake Pepin Watershed phosphorus total maximum daily load (TMDL) report by using the existing information and documentation prepared under previous contracts to prepare one TMDL report that addresses the impairments on the mainstem of the Mississippi River. Information developed to date for draft TMDLs on the Minnesota River mainstem will be documented for later use by the Minnesota Pollution Control Agency.

Anoka
Blue Earth
Brown
Carver
Chippewa
Cottonwood
Dakota
Goodhue
Hennepin
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
McLeod
Nicollet
Ramsey
Redwood
Renville
Rice
Scott
Sibley
Wabasha
Washington
Yellow Medicine
Recipient
Tetra Tech Inc
2019 Fiscal Year Funding Amount
$149,903
Fund Source

The goal of this project is to simulate up to ten scenarios using the recently completed Hydrologic Simulation Program FORTRAN (HSPF) model for the Mississippi River–Lake Pepin (MRLP) watershed. The mode will be used to investigate a variety of management scenarios to support further planning work and implementation in the watershed. Model scenarios are being developed to inform 1W1P planning activities and future implementation.

Olmsted
Wabasha
Recipient
Emmons & Olivier Resources (EOR)
2013 Fiscal Year Funding Amount
$119,888
Fund Source

This project will build a working watershed SWAT model that can readily be used by the MPCA to provide information to support conventional parameter TMDLs and to identify critical areas for BMP installation/evaluation that can be supported by the efforts of the local Farmer Led Council as well as other land owners within the Mississippi River-Winona watershed.

Olmsted
Wabasha
Winona
Recipient
Emmons & Oliver Resources (EOR)
2014 Fiscal Year Funding Amount
$57,955
Fund Source

This project will address Step 2b in the Watershed approach process and computation of TMDLS for those impaired waters determined to be in need of them.

Olmsted
Wabasha
Winona
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$90,980
Fund Source

The goal of this project is to complete the construction, calibration, and validation of a Hydrological Simulation Program – FORTRAN (HSPF) watershed model for a portion of the Mississippi River-Lake Pepin watershed.

Goodhue
Wabasha
Recipient
Emmons & Olivier Resources Inc
2019 Fiscal Year Funding Amount
$74,089
Fund Source

This project is for a contract with Emmons & Olivier Resources Inc to develop Total Maximum Daily Loads (TMDLs; a federal clean Water Act requirement) and a Watershed Restoration and Protection Strategy (WRAPS) report for the for Mississippi River - LaCrescent and Winnebago River watersheds.

Faribault
Houston
Winona
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$86,582
Fund Source

The goal of this project is to complete the construction, calibration, and validation of an Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Minnesota portions of three watersheds: Root River, Upper Iowa, and Mississippi River-Reno.

Fillmore
Houston
Mower
Olmsted
Winona
Recipient
Multiple public water systems
2013 Fiscal Year Funding Amount
$250,000
2015 Fiscal Year Funding Amount
$250,000
2016 Fiscal Year Funding Amount
$113,000
2018 Fiscal Year Funding Amount
$250,000
Fund Source

Approximately 70 percent of all Minnesotans rely on groundwater as their primary source of drinking water. Wells used for drinking water must be properly sealed when removed from service to protect both public health and Minnesota’s invaluable groundwater resources. The Minnesota Department of Health protects both public health and groundwater by assuring the proper sealing of unused wells.
Clean Water funds are being provided to well owners as a 50% cost-share assistance for sealing unused public water-supply wells.

Anoka
Beltrami
Benton
Big Stone
Blue Earth
Cook
Crow Wing
Dakota
Dodge
Faribault
Fillmore
Hennepin
Lyon
McLeod
Morrison
Mower
Olmsted
Rice
Sherburne
Sibley
St. Louis
Stearns
Steele
Swift
Todd
Waseca
Washington
Watonwan
Winona
Wright
Recipient
Pickwick Inn
2017 Fiscal Year Funding Amount
$4,491
Fund Source

Drill new well. Seal old well.

Winona
Recipient
LimnoTech
2014 Fiscal Year Funding Amount
$75,027
Fund Source

The Zumbro River watershed HSPF model will be refined to include recent data and information as well as evaluate various management scenarios to inform the most effective actions for reducing sediment and nutrient loading and improving water quality. Specifically, to provide the foundation for the Lake Zumbro Phosphorus Total Maximum Daily Load (TMDL).

Winona
Recipient
LimnoTech
2017 Fiscal Year Funding Amount
$62,622
Fund Source

The goal of this project is to test the sensitivity of the Zumbro River Watershed Hydrological Simulation Program FORTRAN (HSPF) model management scenario results. Additional goals are to develop Total Maximum Daily Loads (TMDLs) for impaired stream reaches and Rice Lake, which will be documented in a TMDL Report. The consultant will apply the existing calibrated and validated Zumbro River Watershed HSPF model to construct load duration curves to develop TMDLs.

Dodge
Goodhue
Olmsted
Rice
Steele
Wabasha
Recipient
LimnoTech
2019 Fiscal Year Funding Amount
$59,532
Fund Source

In previous phases of work, a Hydrologic Simulation Program FORTRAN (HSPF) model of the Zumbro River Watershed was developed to simulate hydrology and water quality for the 1995-2009 simulation period (Phase I), applied to evaluate various management scenarios for reducing sediment and nutrient loading (Phase II), and used to develop Total Maximum Daily Loads (TMDLs) for impaired stream segments and inform development of a nutrient TMDL for Rice Lake (Phase III).