Minnesota's Legacy

All Projects

Showing 1 - 16 of 16 | Export projects
Recipient
Aitkin County SWCD
2013 Fiscal Year Funding Amount
$5,973
Fund Source

The goal of the project is to complete the dataset for the assessment of Aquatic Recreation Use in Cedar Lake by monitoring total phosphorus, chlorophyll-a, and secchi depth.

Aitkin
Recipient
Aitkin County Soil & Water
2013 Fiscal Year Funding Amount
$35,475
Fund Source

The Aitkin County Soil and Water Conservation District will partner with the Aitkin County Lakes and Rivers Association, Lake Associations, as well as other eligible community partners to reduce the impacts of stormwater runoff and keep water on the land. A mini-grant program to install rain gardens and native vegetation buffers along shorelines of lakes with a completed "Lake Assessment" supported by previous BWSR funding or a TMDL Implementation Plan will be implemented.

Aitkin
Recipient
Kanabec County Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$112,265
2013 Fiscal Year Funding Amount
$2,000
2012 Fiscal Year Funding Amount
$3,000
Fund Source

This project will be a complete TMDL report for the Biota and Bacteria (E. coli) impairments for the Ann River Watershed. The water bodies associated with these impairments will then be removed from the MPCA’s impaired waters list, and implementation activities to restore the water bodies will begin.

Aitkin
Chisago
Isanti
Kanabec
Mille Lacs
Pine
Recipient
Aitkin County Soil & Water Conservation District
2013 Fiscal Year Funding Amount
$4,851
Fund Source

This project will complete a Total Maximum Daily Load Implementation Plan for the watersheds of Big Sandy and Minnewawa Lakes. This restoration plan will provide pollution reduction and watershed management strategies that are developed with input from stakeholders in the watersheds.

Aitkin
Carlton
St. Louis
Recipient
Crow Wing Soil and Water Conservation District (SWCD)
2013 Fiscal Year Funding Amount
$14,987
Fund Source

The project will include lake monitoring on three (3) lakes found in the Rum River watershed in southeastern Crow Wing County (CWC). The project will be conducted in an effort to gain sufficient data on these data-deficient lake sites. All of the proposed monitoring sites are target sites for 2013-2014. One of the goals of the CWC Local Comprehensive Water Plan (CWP) is to establish a countywide Comprehensive Monitoring Plan (CMP).

Aitkin
Anoka
Benton
Chisago
Crow Wing
Isanti
Kanabec
Mille Lacs
Morrison
Sherburne
Recipient
Cass County Environmental Services Department
2013 Fiscal Year Funding Amount
$30,000
Fund Source

This project will provide an important framework for civic and citizen engagement and communication, which will contribute to long-term public participation in surface water protection and restoration activities throughout the Pine River watershed. The civic engagement plans will be incorporated into the long term plans for the major watershed project.

Aitkin
Cass
Crow Wing
Hubbard
Recipient
Board of Water & Soil Resources
2012 Fiscal Year Funding Amount
$600,000
2013 Fiscal Year Funding Amount
$397,580
Fund Source

BWSR will administer funding to eligible County projects that provide funds and other assistance to low income property owners to upgrade or replace Noncompliant Septic Systems. BWSR will also manage annual reporting completed by each County.

Aitkin
Beltrami
Big Stone
Carlton
Carver
Cass
Chippewa
Chisago
Clearwater
Cook
Cottonwood
Crow Wing
Dakota
Dodge
Douglas
Hubbard
Isanti
Jackson
Kandiyohi
Koochiching
Lac qui Parle
Lake of the Woods
Lincoln
Marshall
McLeod
Morrison
Norman
Olmsted
Pennington
Pine
Pipestone
Polk
Pope
Red Lake
Roseau
Scott
Sibley
St. Louis
Stearns
Steele
Todd
Traverse
Wadena
Waseca
Washington
Wilkin
Winona
Yellow Medicine
Recipient
Tetra Tech
2013 Fiscal Year Funding Amount
$174,990
Fund Source

The goal of this project is to construct, calibrate, and validate three HSPF watershed models. The project will result in HSPF models that can readily be used to provide information to support conventional parameter TMDLs. The models are expected to generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.

St. Louis
Pine
Lake
Itasca
Carlton
Aitkin
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$253,710
Fund Source

The goal of this project is to construct, calibrate, and validate five Hydrologic Simulation Program FORTRAN (HSPF) watershed models. The outcome will be HSPF models that can readily be used to provide information to support conventional parameter TMDLs. These models will generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.

Wright
Todd
Stearns
St. Louis
Sherburne
Morrison
Mille Lacs
Meeker
Kanabec
Itasca
Isanti
Chisago
Cass
Carlton
Benton
Anoka
Aitkin
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$174,954
Fund Source

This project will construct, calibrate, and validate three HSPF watershed models. The consultant will produce HSPF models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will clearly demonstrate that these models generate predicted output time series for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.

Becker
Hubbard
Crow Wing
Aitkin
Clearwater
Cass
Itasca
Beltrami
Recipient
Minnesota Pollution Control Agency
2013 Fiscal Year Funding Amount
$5,265,335
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities within the described priority watersheds.

Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support.

Aitkin
Anoka
Benton
Big Stone
Blue Earth
Brown
Chippewa
Chisago
Cook
Cottonwood
Crow Wing
Faribault
Freeborn
Isanti
Jackson
Kanabec
Kittson
Lac qui Parle
Lake
Le Sueur
Marshall
Martin
Mille Lacs
Morrison
Nicollet
Pennington
Pine
Polk
Redwood
Renville
Roseau
Sibley
Stevens
Swift
Traverse
Watonwan
Recipient
Crow Wing County Soil & Water Conservation District (SWCD)
2013 Fiscal Year Funding Amount
$69,999
Fund Source

Phase II of this project will focus on source assessment, running watershed scenarios, Kego Lake TMDL, lake protection planning, Stressor identification and the continuation of the Civic Engagement components of the project. Information gathered in Phase II will be utilized in developing the WRAP report which will be developed in the future Phase III of the project.

Aitkin
Cass
Crow Wing
Hubbard
Recipient
Anoka Conservation District
2013 Fiscal Year Funding Amount
$280,000
Fund Source

This project will gather watershed data necessary for the development of a Watershed Restoration and Protection Strategy with parameter-specific targets that will maintain or improve water quality in the Rum River Watershed. Local Partners will lead various portions of this project and a hired onsultant will be subcontracted to write selected TMDL protection plans.

Aitkin
Anoka
Benton
Chisago
Crow Wing
Isanti
Kanabec
Mille Lacs
Morrison
Sherburne
Recipient
Mille Lacs Soil & Water Conservation District
2013 Fiscal Year Funding Amount
$111,111
Fund Source

The purpose of the project is to collect data to represent the ambient condition of the lakes and streams of the Rum River Watershed within Mille Lacs, Isanti and Sherburne Counties that is needed to determine if thresholds set to protect designeated uses, such as aquatic recreation and aquatic life, are being met .

Aitkin
Anoka
Benton
Chisago
Crow Wing
Isanti
Kanabec
Mille Lacs
Morrison
Sherburne
Recipient
Minnesota Department of Natural Resources
2013 Fiscal Year Funding Amount
$170,601
Fund Source

The objective of this sampling plan is to quantify the inputs and outputs of methyl-mercury in the St. Louis River. Mercury can be bound to organic carbon or suspended solids; therefore, it is necessary to determine loadings of them as well. To get loadings, this sampling plan includes event and base flow monitoring at key tributaries to the St. Louis River and at stations within the St. Louis River.

Aitkin
Carlton
Lake
St. Louis
Recipient
Wenck Associates, Inc.
2013 Fiscal Year Funding Amount
$146,992
Fund Source

This project will complete a Total Maximum Daily Load (TMDL) study for the impaired reaches of the Snake River Basin. The project includes development of a Generalized Watershed Loading Function (GWLF) model for nutrient sources and Total Suspended Sediment (TSS), a spreadsheet version of a BATHTUB model of lake response for four lakes, and a bacteria source assessment. Wenck will also provide all stream channel data as a spreadsheet and locational database.

Aitkin
Kanabec
Mille Lacs
Pine