International Water Institute
2013 Fiscal Year Funding Amount
$56,031
Fund Source

The goal of this project is to collect data, water chemistry and field parameters, which will be paired with biological data collected by the MPCA to assess water quality conditions at seven sites along targeted reaches within the Snake River Watershed and five sites in the Two River Watershed.

Kittson
Marshall
Pennington
Polk
Roseau
Recipient
Department of Natural Resources
2011 Fiscal Year Funding Amount
$5,833,000
Fund Source

With these funds we were able to restore, protect, and enhance 24,611 acres of native and restored grassland in Minnesota. Much of this work was done through the DNR Roving Crews, a new program funded with these dollars that has significantly increased the state's habitat management capabilities. In addition to these enhancement activities we were able to enroll acres in the DNR's Native Prairie Bank Easement Program as well as acquire acres for the SNA program.

Becker
Beltrami
Big Stone
Blue Earth
Brown
Chippewa
Clay
Cottonwood
Dakota
Dodge
Douglas
Faribault
Fillmore
Goodhue
Hennepin
Houston
Jackson
Kanabec
Kandiyohi
Kittson
Lac qui Parle
Le Sueur
Lincoln
Lyon
Mahnomen
Marshall
McLeod
Mille Lacs
Morrison
Mower
Murray
Nobles
Norman
Olmsted
Otter Tail
Pennington
Polk
Red Lake
Redwood
Renville
Rock
Sherburne
Stearns
Swift
Todd
Traverse
Wabasha
Wadena
Washington
Wilkin
Winona
Yellow Medicine
Recipient
Pheasants Forever
2015 Fiscal Year Funding Amount
$10,350,000
Fund Source

This proposal accelerates the protection of 1,362 acres of prairie grassland, wetland, and other wildlife habitat as State Wildlife Management Areas open to public hunting.

Anoka
Becker
Big Stone
Blue Earth
Carver
Clay
Cottonwood
Douglas
Faribault
Fillmore
Grant
Jackson
Kandiyohi
Lac qui Parle
Lincoln
Lyon
Mahnomen
Martin
McLeod
Murray
Norman
Otter Tail
Pennington
Polk
Pope
Redwood
Sibley
Stearns
Stevens
Swift
Traverse
Waseca
Wilkin
Wright
Yellow Medicine
Recipient
Pheasants Forever
2016 Fiscal Year Funding Amount
$7,452,000
Fund Source

This proposal accelerates the protection of 900 acres of prairie grassland, wetland, and other wildlife habitat as State Wildlife Management Areas open to public hunting.

Blue Earth
Carver
Cottonwood
Douglas
Fillmore
Grant
Jackson
Kandiyohi
Lac qui Parle
Lyon
Martin
McLeod
Meeker
Murray
Nobles
Pennington
Pipestone
Pope
Redwood
Rock
Sibley
Stearns
Swift
Todd
Wright
Yellow Medicine
Recipient
Kanabec County Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$112,265
2013 Fiscal Year Funding Amount
$2,000
2012 Fiscal Year Funding Amount
$3,000
Fund Source

This project will be a complete TMDL report for the Biota and Bacteria (E. coli) impairments for the Ann River Watershed. The water bodies associated with these impairments will then be removed from the MPCA’s impaired waters list, and implementation activities to restore the water bodies will begin.

Aitkin
Chisago
Isanti
Kanabec
Mille Lacs
Pine
Recipient
Anoka Conservation District; Isanti County SWCD; Great River Greening;Stearns County SWCD; Minnesota Land Trust
2018 Fiscal Year Funding Amount
$1,130,000
Fund Source

The Anoka Sandplain Partnership proposal will restore/enhance 245 acres and 1.20 mi shoreline; and protect 80 acres of wildlife habitat on priority public lands principally within the Anoka Sandplain Ecological Region within the Metropolitan Urbanizing and Forest-Prairie Transition sections.

Anoka
Benton
Isanti
Morrison
Sherburne
Stearns
Recipient
Metropolitan Council-Environmental Services
2013 Fiscal Year Funding Amount
$405,500
Fund Source

This project will provide condition monitoring and problem investigation monitoring at the following sites.
Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek.
Minnesota River: Tributaries include Eagle Creek,Riley Creek, and Valley Creek tributary to the St. Croix River

Anoka
Benton
Carver
Chisago
Dakota
Hennepin
Isanti
Le Sueur
McLeod
Meeker
Mille Lacs
Morrison
Nicollet
Pine
Ramsey
Renville
Rice
Scott
Sherburne
Sibley
Stearns
Washington
Wright
Recipient
Red Lake Watershed District
2014 Fiscal Year Funding Amount
$185,473
2016 Fiscal Year Funding Amount
$100,000
Fund Source

The overall goal is to develop a Watershed Restoration and Protection Strategy (WRAPS) Report and Total Maximum Daily Load (TMDL) Study that will address water quality impairments and maintain or improve water quality throughout the Clearwater River watershed. The study will identify sources of pollutants to the streams and lakes, allocate pollution reduction goals, and prioritize and identify implementation strategies to maintain or improve water quality in key lakes and streams in the watershed.

Beltrami
Clearwater
Mahnomen
Pennington
Polk
Red Lake
Recipient
MN DNR
2010 Fiscal Year Funding Amount
$1,875,000

The Minnesota County Geologic Atlas program is an ongoing effort begun in 1982 that is being conducted jointly by the University of Minnesota's Minnesota Geological Survey and the Minnesota Department of Natural Resources (DNR). The program collects information on the geology of Minnesota to create maps and reports depicting the characteristics and pollution sensitivity of Minnesota's ground-water resources.

Benton
Carlton
Carver
Chisago
Sherburne
Sibley
Recipient
MN Land Trust
2016 Fiscal Year Funding Amount
$1,690,000
Fund Source

Through this grant, the Minnesota Land Trust protected 641 acres and 39,415 feet (7.46 miles) of critical shoreland and high-quality wildlife habitats in Minnesota’s Northeast region through permanent conservation easements. Landowners donated $2,100,500 in easement value through this grant, greatly leveraging by 131% the $1,609,000 in grant funding provided by the Outdoor Heritage Fund. The amount of shoreland protected exceeded that proposed for the grant by 299%.

Carlton
Cook
Itasca
Kanabec
Koochiching
Lake
St. Louis
Recipient
RESPEC
2012 Fiscal Year Funding Amount
$67,972
Fund Source

This project will construct three watershed framework models built using the Hydrologic Simulation Program FORTRAN. These executable models will simulate hydrology at the 12-digit HUC subbasin scale. An HSPF model will be built for each of the following 8-HUC watersheds: Red Lake River (09020303) and the Clearwater River (09020305).

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
Lower Mississippi River Watershed Management Organization (LMRWMO)
2012 Fiscal Year Funding Amount
$189,999
2013 Fiscal Year Funding Amount
$29,995
Fund Source

This project will complete a comprehensive study, following a rational, step-wise process of data analysis, response modeling and comparison to the water quality standards, followed by impairment diagnosis, modeling of improvement and protection options, and development of a WRAP Report and Implementation Plan for Sunfish lake, Thompson lake, Pickerel lake, and Rogers lake.

Anoka
Carver
Dakota
Hennepin
Ramsey
Sherburne
Washington
Wright
Recipient
Emmons & Olivier Resources
2013 Fiscal Year Funding Amount
$99,355
Fund Source

This project will complete a pollutant source identification and subwatershed information report and support the development of a Draft Restoration and Protection Plan (RAPP). It will also support the devlopment of a Implementation Plan that will identify target areas for BMP implementation for bacteria reductions.

Anoka
Benton
Carver
Crow Wing
Dakota
Douglas
Hennepin
Kandiyohi
McLeod
Meeker
Mille Lacs
Morrison
Pope
Ramsey
Sherburne
Sibley
Stearns
Todd
Washington
Wright
Recipient
Coon Creek Watershed District
2013 Fiscal Year Funding Amount
$252,200
Fund Source

This project will provide the MPCA, CCWD, and all other stakeholders the information and tools necessary to improve the water quality within Coon Creek Watershed District. The improvements will take place using targeted activities throughout the watershed to reduce the primary biological and chemical stressors. In turn, the reduction of these stressors will help to reduce overall loadings of sediment, turbidity, total phosphorus, and E. coli bacteria.

Anoka
Carver
Dakota
Hennepin
Ramsey
Sherburne
Washington
Wright
Recipient
Emmons and Oliver Resources, Inc.
2013 Fiscal Year Funding Amount
$22,012
Fund Source

The goal of this project is to develop a phosphorus TMDL for the six impaired lakes in the southwest portion of the Rice Creek Watershed District; Island Lake, Little Lake Johanna, Long Lake, East Moore Lake, Pike Lake and Lake Valentine.

Anoka
Carver
Dakota
Hennepin
Ramsey
Sherburne
Stearns
Wright
Recipient
Red Lake Watershed District (RLWD)
2011 Fiscal Year Funding Amount
$150,000
2013 Fiscal Year Funding Amount
$109,900
Fund Source

This project Phase will collect data, background information, and watershed characteristics within the Red Lake River watershed. This information will be documented within the framework of early draft TMDL Reports (with background information, but no load calculations) for impaired reaches within this watershed and early draft protection plans for the areas in the watershed that are not currently impaired.

Beltrami
Clearwater
Marshall
Pennington
Polk
Red Lake
Recipient
Snake River Watershed Management Board
2010 Fiscal Year Funding Amount
$171,766
Fund Source

The Snake River Watershed Management Board (SRWMB), working in concert with other local governmental units in within the watershed, will assist the MPCA, the project consultant, and other members of the Snake River Watershed Total Maximum Daily Load (TMDL) technical team in the completion of tasks associated with this TMDL project. SRWMB, with assistance from members of the technical team (Kanabec Soil and Water Conservation District (SWCD), Pine SWCD, Aitkin SWCD, and Mille Lacs SWCD) will provide the services to complete this TMDL project.

Aitkin
Chisago
Isanti
Kanabec
Mille Lacs
Pine
Recipient
DNR
2016 Fiscal Year Funding Amount
$4,570,000
Fund Source

Acquire 910 acres of high priority habitats for designation as Wildlife Management Areas or Scientific & Natural Areas emphasizing Prairie Conservation Plan implementation and coordinating with partners. All lands will be open for public hunting, fishing and trapping.

Big Stone
Cook
Douglas
Faribault
Freeborn
Hubbard
Isanti
Kandiyohi
Koochiching
Lac qui Parle
Lake
Lake of the Woods
Le Sueur
Lincoln
Lyon
Meeker
Murray
Norman
Pennington
Pine
Pipestone
Polk
Rice
Rock
Roseau
Stearns
Recipient
University of Minnesota
2012 Fiscal Year Funding Amount
$175,000
2013 Fiscal Year Funding Amount
$175,000

PROJECT OVERVIEW

Aitkin
Becker
Beltrami
Benton
Carlton
Cass
Clearwater
Cook
Crow Wing
Hubbard
Itasca
Koochiching
Lake
Lake of the Woods
Mahnomen
Marshall
Morrison
Otter Tail
Pennington
Pine
Polk
Red Lake
Roseau
St. Louis
Todd
Wadena
2019 Fiscal Year Funding Amount
$250,000
2018 Fiscal Year Funding Amount
$250,000
2017 Fiscal Year Funding Amount
$250,000
2016 Fiscal Year Funding Amount
$250,000
2015 Fiscal Year Funding Amount
$250,000
2014 Fiscal Year Funding Amount
$250,000
Fund Source

The Minnesota DNR and the Minnesota Forest Resources Council work with forest landowners, managers and loggers to implement a set of voluntary sustainable forest management guidelines that include water quality best management practices (BMPs) to ensure sustainable habitat, clean water, and productive forest soils, all contributing to healthy watersheds. This project will monitor the implementation of these forest management guidelines and BMPs on forested watersheds in MN.

Fillmore
Goodhue
Wabasha
Winona
Carlton
Houston
Koochiching
Lake of the Woods
Mahnomen
Olmsted
Otter Tail
Pine
Roseau
Stearns
Todd
Wadena
Aitkin
Anoka
Becker
Beltrami
Benton
Cass
Clearwater
Cook
Crow Wing
Hubbard
Isanti
Itasca
Kanabec
Lake
Mille Lacs
Morrison
Sherburne
St. Louis
Recipient
Board of Water & Soil Resources
2012 Fiscal Year Funding Amount
$600,000
2013 Fiscal Year Funding Amount
$397,580
Fund Source

BWSR will administer funding to eligible County projects that provide funds and other assistance to low income property owners to upgrade or replace Noncompliant Septic Systems. BWSR will also manage annual reporting completed by each County.

Aitkin
Beltrami
Big Stone
Carlton
Carver
Cass
Chippewa
Chisago
Clearwater
Cook
Cottonwood
Crow Wing
Dakota
Dodge
Douglas
Hubbard
Isanti
Jackson
Kandiyohi
Koochiching
Lac qui Parle
Lake of the Woods
Lincoln
Marshall
McLeod
Morrison
Norman
Olmsted
Pennington
Pine
Pipestone
Polk
Pope
Red Lake
Roseau
Scott
Sibley
St. Louis
Stearns
Steele
Todd
Traverse
Wadena
Waseca
Washington
Wilkin
Winona
Yellow Medicine
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$99,986
Fund Source

This project will finalize HSPF watershed model construction and complete the calibration/validation process. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval.

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
Aqua Terra Consultants
2013 Fiscal Year Funding Amount
$36,848
Fund Source

This project will maximize the utility and usefulness of three HSPF models that have been constructed and calibrated for hydrology. The contractor will identify and reduce parameterization errors in the following three HSPF models: 1) Buffalo River Watershed, 2 ) Thief River Watershed, 3) Bois de Sioux-Mustinka Watersheds. This will result, not only in a better hydrology calibration, but will also improve each of the models’ ability to more accurately estimate sediment and pollutant loads and concentrations.

Becker
Beltrami
Big Stone
Clay
Grant
Marshall
Otter Tail
Pennington
Roseau
Stevens
Traverse
Wilkin
Recipient
Red Lake Watershed District
2013 Fiscal Year Funding Amount
$123,400
Fund Source

This phase of the project will complete the analysis of existing and newly collected water quality data in the Red River of the North-Grand Marais Creek watershed and also verify the impairments on the currently listed reaches and determine the status of the remaining river reaches as being either impaired or currently meeting standards. Stakeholder involvement and public participation will be a primary focus throughout the project.

Marshall
Pennington
Polk
Recipient
Houston Engineering
2012 Fiscal Year Funding Amount
$67,996
Fund Source

This project will continue to develop, and calibrate/validate the hydrology of an HSPF watershed model for the Thief River watershed. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval. The consultant will produce an HSPF watershed model that can readily be used to provide information to support conventional parameter TMDLs.

Beltrami
Marshall
Pennington
Roseau
Recipient
International Water Institute
2012 Fiscal Year Funding Amount
$134,867
Fund Source

This project will support water quality monitoring and data analysis in the Red River Basin. The monitoring will assist in providing water chemistry data needed to calculate annual pollutant loads for the Major Watershed Load Monitoring Program (MWLMP) and provide short term data sets of select parameters to other MPCA programs.

Beltrami
Clearwater
Kittson
Mahnomen
Marshall
Norman
Pennington
Polk
Red Lake
Roseau
Recipient
Minnesota Land Trust
2010 Fiscal Year Funding Amount
$250,000

Project Outcome and Results

Anoka
Carver
Chisago
Dakota
Goodhue
Hennepin
Isanti
Le Sueur
Nicollet
Ramsey
Rice
Scott
Sherburne
Sibley
Washington
Wright
Recipient
MN DNR
2010 Fiscal Year Funding Amount
$410,000

Project Outcome and Results

Anoka
Carver
Chisago
Dakota
Goodhue
Hennepin
Isanti
Le Sueur
Ramsey
Scott
Sherburne
Washington
Wright
Recipient
The Trust for Public Land
2012 Fiscal Year Funding Amount
$250,000
2013 Fiscal Year Funding Amount
$250,000

The Trust for Public Land is using this appropriation to purchase approximately 30 acres of land and 0.3 miles of shoreline with high ecological value and then convey the land to state or local governments for long-term stewardship and protection. Lands being considered for permanent protection in this round of funding include areas around the Rum River and Rice Creek in Anoka County, Lindstrom Natural Area in Chisago County, Savage Fen Scientific and Natural Area and Pike Lake in Scott County, and St. Croix/Fraconia-Scandia Scientific and Natural Area in Washington County.

Anoka
Carver
Chisago
Dakota
Goodhue
Hennepin
Isanti
Le Sueur
Nicollet
Ramsey
Rice
Scott
Sherburne
Sibley
Washington
Wright
Recipient
Minnesota Land Trust
2012 Fiscal Year Funding Amount
$200,000
2013 Fiscal Year Funding Amount
$200,000

With this appropriation, the Minnesota Land Trust plans to protect 150 acres of high quality forest, prairie, or wetland habitat by securing permanent conservation easements and dedicating funds for their perpetual monitoring, management, and enforcement. Lands being considered for permanent protection in this round of funding are located in Anoka, Carver, Goodhue, Hennepin, Isanti, Washington, and Wright counties.

Anoka
Carver
Chisago
Dakota
Goodhue
Hennepin
Isanti
Le Sueur
Nicollet
Ramsey
Scott
Sherburne
Sibley
Washington
Wright
Recipient
MN Valley National Wildlife Refuge Trust Inc; Friends of the Mississippi River; Great River Greening; MN Land Trust
2019 Fiscal Year Funding Amount
$2,630,000
Fund Source

Metro Big Rivers Phase 8 will protect 100 acres in fee title and 130 acres in permanent conservation easement, and enhance 700 acres of priority habitat in the big rivers corridors in the Metropolitan Urbanizing Area. MBR partners will leverage the OHF appropriation by at least 40% with partner funds, private funds, local government contributions and Clean Water Funds, as well as landowner donations of easement value. Significant volunteer engagement will be invested in many habitat enhancement activities, although not technically counted as leverage.

Anoka
Carver
Dakota
Hennepin
Scott
Sherburne
Sibley
Washington
Recipient
MN VNWR Trust, Friends of Miss, GRG, MLT, TPL
2014 Fiscal Year Funding Amount
$1,720,000
Fund Source

Metro Big Rivers' restoration and enhancement partners (FMR and GRG) achieved their goals, converting through restoration a former rail yard in the urban core to 32 acres of prairie and enhancing 98 acres of prairie and forest at four other public conservation sites in the metropolitan area. The easement partner (MLT) exceeded goals and permanently protected 131 acres under two conservation easements in Washington County.

Anoka
Carver
Chisago
Dakota
Ramsey
Scott
Sherburne
Sibley
Washington
Recipient
MN Valley National Wildlife Refuge Trust Inc; Friends of the Mississippi River, Great River Greening, MN Land Trust, Trust for Public Land
2015 Fiscal Year Funding Amount
$2,650,000
Fund Source

Metro Big Rivers Phase 5 will protect in fee title 215 acres, protect in conservation easement 175 acres, and enhance 229 acres of priority habitat within the big rivers corridors in the Metropolitan Urbanizing Area.

Anoka
Carver
Chisago
Dakota
Hennepin
Isanti
Ramsey
Scott
Sherburne
Sibley
Washington
Wright
Recipient
Great River Greening, MN Land Trust, Friends of Mississippi River, Trust for Public Land, MN Valley National Wildlife Refuge Trust, Inc.
2012 Fiscal Year Funding Amount
$5,000,000
Fund Source

With this final report, Metro Big Rivers Phase 2 is complete and significantly exceeded its original acreage targets of protecting, restoring and enhancing priority wildlife habitat within the three big rivers corridors in the Metropolitan Urbanizing Area. Specifically:
* Metro Big Rivers 2 planned to protect 733 acres, but actually protected 1,430 acres.
* Metro Big Rivers 2 planned to restore 15 acres and enhance 135 acres, but actually restored 15 acres and enhanced 178 acres.

Anoka
Carver
Chisago
Dakota
Ramsey
Scott
Sherburne
Sibley
Washington
Recipient
MN Valley National Wildlife Refuge Trust Inc; Friends of the Mississippi River, Great River Greening, MN Land Trust, Trust for Public Land
2016 Fiscal Year Funding Amount
$2,000,000
Fund Source

Metro Big Rivers Phase 6 will protect 245 acres (145 acres fee title and 100 acres conservation easement), restore 81 acres and enhance 489 acres of priority habitat in the big rivers corridors in the Metropolitan Urbanizing Area.

Anoka
Carver
Chisago
Dakota
Hennepin
Ramsey
Scott
Sherburne
Sibley
Washington
Recipient
MN Valley National Wildlife Refuge Trust Inc; Friends of the Mississippi River, Great River Greening, MN Land Trust, Trust for Public Land
2017 Fiscal Year Funding Amount
$4,000,000
Fund Source

Metro Big Rivers Phase 7 will protect 280 acres (180 acres fee title and 100 acres conservation easement), restore 164 acres and enhance 613 acres of priority habitat in the big rivers corridors in the Metropolitan Urbanizing Area.

Anoka
Carver
Chisago
Dakota
Hennepin
Scott
Sherburne
Sibley
Washington
2019 Fiscal Year Funding Amount
$0
2018 Fiscal Year Funding Amount
$0
2017 Fiscal Year Funding Amount
$0
2016 Fiscal Year Funding Amount
$0
2015 Fiscal Year Funding Amount
$0
2014 Fiscal Year Funding Amount
$0
2013 Fiscal Year Funding Amount
$0
2012 Fiscal Year Funding Amount
$1,000,000
2011 Fiscal Year Funding Amount
$4,000,000
Fund Source

This project will establish a groundwater monitoring network in the 11 county metropolitan area. The network will provide information about aquifer characteristics and natural water trends by monitoring healthy aquifers (non-stressed systems). The project will also develop an automated system that captures groundwater level and water use data. This system will enhance evaluation of changes in aquifers that are stressed by pumping from existing wells.

Anoka
Carver
Chisago
Dakota
Hennepin
Isanti
Ramsey
Scott
Washington
Wright
Sherburne
Recipient
The Nature Conservancy
2012 Fiscal Year Funding Amount
$4,500,000
Fund Source

Goals for Phase 2 of the MN Prairie Recovery Program were to: protect 1200 acres native prairie/savanna; restore 250 acres grassland; enhance 6000 acres grassland/savanna with fire, invasive species removal, and grazing; and continue a new prairie conservation model.

Becker
Big Stone
Chippewa
Clay
Kandiyohi
Kittson
Lac qui Parle
Mahnomen
Marshall
Norman
Pennington
Polk
Pope
Roseau
Stearns
Stevens
Swift
Wilkin
2014 Fiscal Year Funding Amount
$0
2013 Fiscal Year Funding Amount
$1,350,000
2012 Fiscal Year Funding Amount
$1,350,000
2011 Fiscal Year Funding Amount
$2,800,000
2010 Fiscal Year Funding Amount
$2,800,000
Fund Source

This project will create a high accuracy elevation dataset - critical for effectively planning and implementing water quality projects - for the state of Minnesota using LiDAR (Light Detection and Ranging) and geospatial mapping technologies. Although some areas of the state have been mapped previously, many counties remain unmapped or have insufficient or inadequate data. This multi-year project, to be completed in 2012, is a collaborative effort of Minnesota's Digital Elevation Committee and partners with county surveyors to ensure accuracy with ground-truthing.

Anoka
Benton
Carlton
Carver
Cook
Dakota
Goodhue
Hennepin
Isanti
Kanabec
Lake
Meeker
Mille Lacs
Morrison
Ramsey
Scott
Sherburne
St. Louis
Washington
Recipient
The Nature Conservancy
2011 Fiscal Year Funding Amount
$3,653,000
Fund Source

This program initiated strategies toward a 15-year goal to provide protection to the remaining 90,000 acres of native prairie/savanna, a 20-year goal to restore and protect an additional 500,000 acres of diverse grasslands/savannas, and a 10-year goal to increase management capacity to annually manage 300,000 acres of grassland and savannas per year. This proposal took the first steps to achieve these goals by initiating a comprehensive, coordinated and collaborative prairie conservation initiative. Annual investments by the LSOHC will be required to realize these ultimate outcomes.

Clay
Kandiyohi
Kittson
Lac qui Parle
Mahnomen
Marshall
Meeker
Pennington
Polk
Pope
Red Lake
Roseau
Stearns
Swift