Minnesota's Legacy

All Projects

Showing 1 - 40 of 77 | Export projects
Recipient
Wright SWCD
2016 Fiscal Year Funding Amount
$139,700
Fund Source

The Wright SWCD applied for, and received, a Soil Erosion and Drainage Law Compliance grant in 2015. This grant was used to inventory Joint Ditch 15 (JD 15) for areas that could benefit from the installation of Side Inlet Control Structures (SICS) and vegetated buffer strips (buffers). JD 15 is known to have areas of significant erosion that effect both benefited landowners as well as a number of impaired waters downstream. The impaired downstream waters include Sucker Creek, Cokato Lake, and the North Fork Crow River. The JD 15 Inventory was completed during the summer of 2015.

Wright
Recipient
Conservation Corps MN & IA
2016 Fiscal Year Funding Amount
$500,000
Fund Source
Recipient
Red Lake SWCD
2016 Fiscal Year Funding Amount
$102,020
Fund Source

Red Lake County SWCD will continue to work cooperatively with the Red Lake County Ditch Authority, and the landowners involved to reduce erosion and sedimentation, reduce peak flows and flooding, improve water quality, and protect drainage system efficiency for priority Chapter 103E drainage systems by installing thirty-seven multipurpose drainage management practices. The priority Chapter 103E drainage system is Judicial County Ditch 60.

Red Lake
Recipient
Freeborn SWCD
2016 Fiscal Year Funding Amount
$32,500
Fund Source

County Ditch #8 (CD8) has been identified as an area of high erosion by the Freeborn County Drainage Authority and the Turtle Creek Watershed district. Project entails using conservation BMPs such as water and sediment control basins, grassed waterways, and alternative tile intakes to address gully and sheet and rill erosion concerns at the headwaters of CD8.

Freeborn
Recipient
Itasca SWCD
2016 Fiscal Year Funding Amount
$141,000
Fund Source

This project is the first step toward a regional based implementation approach to reduce phosphorus and total suspended solids in the 12 cities on the Mississippi River. By the time this project is approved, a stormwater retrofit analysis will be completed for the cities, and the MHB will be discussing with them a strategic way to implement the study on a regional scale. By funding this project, you are encouraging the future implementation in a strategic and organized process.

Itasca
Recipient
Chisago SWCD
2016 Fiscal Year Funding Amount
$220,500
Fund Source

The Chisago Soil and Water Conservation District (SWCD) has had such great success implementing gully stabilization projects along the St. Croix River escarpment that all of the current grant funding has been encumbered towards projects. Two large gully projects, one in the City of Taylors Falls and a second nearby in Interstate State Park, are lined up and ready to go as soon as funding is secured. Both of these gullies are large and have been actively eroding for many years, depositing large loads of sediment and phosphorus directly into the St. Croix River.

Chisago
Recipient
Red Lake SWCD
2016 Fiscal Year Funding Amount
$194,000
Fund Source

The Red Lake River from County Ditch 96 (Pennington County) to where the Clearwater River enters the Red Lake River (Red Lake Falls) is on the TMDL Impaired Waters List for Turbidity. This reach is a high priority because of the high importance of the Red Lake River, which provides a domestic supply use of the water source and provides abundant recreational uses.

Red Lake
Recipient
Pope SWCD
2016 Fiscal Year Funding Amount
$287,500
Fund Source

The Lake Emily Watershed BMP Targeted Implementation Project will provide funding for 48 water and sediment control projects and potential shoreline and riparian restoration. This work would address surface water quality sources identified in the water plan (Section 2-pg 11) including direct drainage from the Lake Emily sub-watersheds (070200050304, 070200050303, 070200050203, 070200050201, 070200050202) the Little Chippewa, and from upstream discharge between Lake Emily and Lake Minnewaska.

Pope
Recipient
Pope SWCD
2016 Fiscal Year Funding Amount
$216,900
Fund Source

Pope SWCD has 9 motivated landowners with 21 WASCOBs, 1 lined waterway, and 1 shoreline restoration in two priority sub watersheds (Trappers Run and Minnewaska). Based on averages calculated from recently constructed WASCOBs in the West Central Area II these projects have the potential to reduce TSS by 518 T/year, and 446 lbs./year of TP. This project will provide a secondary benefit to improve downstream water quality to Lake Emily. The project will result in meeting 99% of the Lake Emily TP lbs/yr.

Pope
Recipient
Bloomington, City of
2016 Fiscal Year Funding Amount
$50,000
Fund Source

This project proposes significant improvements to the City of Bloomington's Anti-Icing/Brine making capabilities. The use of anti-icing technology reduces the amount of salt needed to clear snow and ice from city street. The improvements work to address the chloride impairment in Nine Mile Creek and the metro area by reducing the amount of salt applied to the streets and thereby reducing the amount of chlorides entering our surface water systems.

Hennepin
Recipient
Upper Minnesota River WD
2016 Fiscal Year Funding Amount
$123,000
Fund Source

The Watershed Restoration and Protection Strategy (WRAPS) is currently being developed for the Minnesota River-Headwaters. Part of the WRAPS and subsequent implementation addresses targeting locations for specific projects (e.g., conservation practices) which are expected to results in measurable water quality benefits for impaired lakes and rivers. Protection strategies are also developed to maintain water quality.

Big Stone
Recipient
Soil and Water Conservation Districts
2016 Fiscal Year Funding Amount
$11,000,000
Fund Source

Provides grants to Soil and Water Conservation Districts that focuses on increasing capacity to address four resource concern areasSoil Erosion, Riparian Zone Management, Water Storage and Treatment, and Excess Nutrients.

Statewide
Recipient
Soil and Water Conservation Districts
2016 Fiscal Year Funding Amount
$2,500,000
Fund Source

Governor Mark Dayton's landmark buffer initiative was signed into law in 2015. The law establishes new perennial vegetation buffers of up to 50 feet along rivers, streams, and ditches that will help filter out phosphorus, nitrogen, and sediment. The new law provides flexibility and financial support for landowners to install and maintain buffers.

For grants to Soil and Water Conservation Districts to ensure compliance with riparian buffer or alternate practice requirements for state required buffers and soil erosion law.

Statewide
Recipient
Minnesota Board of Water & Soil Resources
2016 Fiscal Year Funding Amount
$84,000
Fund Source

This program annually evaluates a sample of up to ten Clean Water Fund restoration projects, provides a report on the evaluations in accordance with state law and delivers communications on project outcomes and lessons learned in restoration practice.

Statewide
Recipient
University of Minnesota
2016 Fiscal Year Funding Amount
$500,000
Fund Source

These funds are being used to systematically collect data and produce statistically valid estimates of the rate of soil erosion and tracking the adoption of high residue cropping systems in in the 67 counties with greater than 30% land in agricultural row crop production. Designed to establish a long term program in Minnesota to collect data and produce county, watershed, and state wide estimates of soil erosion caused by water and wind along with tracking adoption of conservation measures to address erosion.

Becker
Benton
Big Stone
Blue Earth
Brown
Carver
Chippewa
Chisago
Clay
Cottonwood
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Houston
Isanti
Jackson
Kandiyohi
Kittson
Lac qui Parle
Le Sueur
Lincoln
Lyon
Mahnomen
Recipient
Conservation Corps MN & IA
2016 Fiscal Year Funding Amount
$500,000
Fund Source

A legislative directive provides Clean Water Funds to be contracted for services with the Conservation Corps of Minnesota. Through these grants, the Corps funds crew labor to eligible local governments through an application process hosted by the Conservation Corps.

Statewide
Recipient
University of Minnesota
2016 Fiscal Year Funding Amount
$500,000
Fund Source

These funds are being used to systematically collect data and produce statistically valid estimates of the rate of soil erosion and tracking the adoption of high residue cropping systems in counties with greater than 30% land in agricultural row crop production. Designed to establish a long term program in Minnesota to collect data and produce county, watershed, and state wide estimates of soil erosion caused by water and wind along with tracking adoption of conservation measures to address erosion.

Becker
Benton
Big Stone
Blue Earth
Brown
Carver
Chippewa
Chisago
Clay
Cottonwood
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Houston
Isanti
Jackson
Kandiyohi
Kittson
Lac qui Parle
Le Sueur
Lincoln
Lyon
Mahnomen
Recipient
Roseau River WD
2016 Fiscal Year Funding Amount
$147,700
Fund Source

A collaboration between the Roseau County SWCD and the Roseau River Watershed District (RRWD), the CD 8 Subwatershed Sediment Reduction Project will reduce sediment delivery to the Roseau River by implementing Best Management Practices on sites that have been identified as the greatest contributors of sediment. Sites were prioritized based on modeled data from the Watershed District's Site Prioritization Grant, and the International Watershed Institutes's Water Quality Decision Support Application (WQDSA) and local knowledge of the subwatershed.

Roseau
Recipient
Shingle Creek WMC
2016 Fiscal Year Funding Amount
$725,000
Fund Source

Installation of a 43,000 sf infiltration gallery in Becker Park in the City of Crystal to infiltrate 0.5 inches of runoff from a 147 acre currently untreated mixed use subwatershed with 51% impervious surface. The project will reduce total phosphorus to Impaired Water Upper Twin Lake by 118 pounds annually, and reduce street flooding on Bass Lake Road (Hennepin County Road 10).

Hennepin
Recipient
Becker SWCD
2016 Fiscal Year Funding Amount
$254,897
Fund Source

With over 500 public water lakes in Becker County, we are blessed with abundant and diverse lake resources that, like those of much of lake country, are at risk of degradation due to increasing development pressures, redevelopment of non-conforming lots, rising stormwater runoff and land use changes within their watersheds.

Becker
Recipient
Beltrami SWCD
2016 Fiscal Year Funding Amount
$150,000
Fund Source

The Beltrami SWCD proposes to partner with citizen and non-profit groups to complete projects that will reduce stormwater runoff and retain water on the land. The majority of the projects will be in the Lake Bemidji lakeshed which has recently been identified in the WRAPs project as being on the verge of impaired for nutrients. With the City of Bemidji being a regional hub for Northwestern Minnesota and the First City on the Mississippi, there are ample opportunities for citizen involvement and ample opportunities for stormwater improvements.

Beltrami
Recipient
Crow Wing SWCD
2016 Fiscal Year Funding Amount
$310,000
Fund Source

The Crow Wing Soil and Water Conservation District (SWCD) proposes to complete stormwater best management practices (BMPs) that will reduce 40 pounds of phosphorus and 40 tons of sediment per year from entering Big Trout Lake. The Crow Wing County (CWC) Water Plan identifies Big Trout Lake as a priority lake to enhance due to its significant decline in water clarity and high ratio of impervious surface surrounding the lake. The 2015 CWC Assessors Property Tax Assessment reports that Big Trout has the second highest taxable land value in CWC at $4,200 per foot of shoreline.

Crow Wing
Recipient
Sherburne SWCD
2016 Fiscal Year Funding Amount
$70,005
Fund Source

The funds requested will provide Big Lake Township with the technical and financial assistance necessary to retrofit up to six locations for stormwater treatment practices within the direct drainage area of Birch Lake, an impaired water body which is very close to meeting state standards. The projects have been identified as high priority in several water quality plans including a TMDL, a subwatershed assessment, the County Water Plan and the Mississippi River (St. Cloud) WRAPS.

Sherburne
Recipient
Washington Conservation District
2016 Fiscal Year Funding Amount
$160,000
Fund Source

In recent years, nutrient enrichment has occurred in Lake St. Croix due to increasing amounts of phosphorus entering the lake from the watershed. According to the TMDL, approximately half of the phosphorus-loading to Lake St. Croix is in the soluble form, and agriculture has been identified as one of the largest contributors of that phosphorus. In addition to the TMDL, subwatershed analyses were completed to identify, assess, and prioritize phosphorus-reducing practices in rural areas draining to Lake St. Croix in Washington County. This project will reduce phosphorus discharges to the St.

Washington
Recipient
BWSR with Morrison County SWCD
2016 Fiscal Year Funding Amount
$1,500,000
Fund Source

Protect approximately 660 acres of habitat for fish, game and wildlife with easements surrounding the Gull River WMA and along the Mississippi and Crow Wing Rivers and tributaries. Protection will reduce infringement and development and improve watershed function.

Cass
Crow Wing
Morrison
Recipient
Area 4 - Metropolitan SWCDs Technical Service Area
2016 Fiscal Year Funding Amount
$200,000
Fund Source

Once thought to have an essentially inexhaustible groundwater supply, Minnesotans are now realizing our rates of use are regionally unsustainable. Recent advanced modeling by the MN DNR and Metropolitan Council of aquifer supplies, in conjunction with predicted demand, indicate the major metropolitan area aquifers are currently subject to extraction rates that exceed recharge. Simply stated, we are mining our groundwater.

Scott
Recipient
Pennington SWCD
2016 Fiscal Year Funding Amount
$196,500
Fund Source

The Pennington SWCD has collaborated with Pennington County for several years to identify priority County Ditch reaches that are in need of buffers and grade stabilization structures. This cooperative effort has resulted in the reduction of nutrient and sediment delivery to the Red Lake River Watershed. Pennington SWCD has recently inventoried buffer and grade stabilization needs on three different County Ditch systems: 96, 21 and 16. A total of 23 miles of ditch has been inventoried, 15 miles of buffer are needed along with 81 grade stabilization structures.

Pennington
Recipient
Cedar River WD
2016 Fiscal Year Funding Amount
$598,000
Fund Source

The Cedar River Watershed District was established in 2007 to identify and fix the water quality impairments in the Cedar River. After several years of monitoring and modeling, the district has developed the requisite background data to drill down on the 25 most crucial areas for targeted treatment. In 2015, a Capitol Improvement Plan was developed to prioritize and rank the most critical projects within the priority list. The District is requesting Clean Water Funding to implement the highest ranking projects, which are shovel ready for timely construction.

Mower
Recipient
Sauk River WD
2016 Fiscal Year Funding Amount
$95,500
Fund Source

The Chain of Lakes Targeted Reduction project will utilize Clean Water Funds to address bank erosion and install vegetated buffers along tributaries to the Eden Valley Chain of Lakes using the SRWD's incentivized Hayed Buffer Program. The Eden Valley Chain of Lakes (Vails Lake, Eden Lake and North Browns Lake) drain into the main segment of the Sauk River Chain of Lakes (SRCL) from the south. Impaired for excessive nutrients, this southern series of lakes is influenced by inflows from private ditches and perennial and intermittent streams.

Stearns
Recipient
Pennington SWCD
2016 Fiscal Year Funding Amount
$90,728
Fund Source

Sediment and water quality issues are local priorities within the Thief River and Red Lake River watersheds, which have their confluence in the city of Thief River Falls. The 1W1P effort underway in the Red Lake River Watershed will identify opportunities for projects and practices that are targeted and result in measurable water quality benefits throughout the watershed using PTMApp.

Pennington
Recipient
Crow Wing County
2016 Fiscal Year Funding Amount
$31,000
Fund Source

Crow Wing County, in cooperation with the municipalities within the County, plans to continue its successful well sealing program that pays 50% of the cost to seal unused/abandoned wells up to a maximum of $1000 per well. The amount of funding requested is $31,000 which is estimated to allow for the sealing of 80-100 wells. From 2012 to 2015, Crow Wing County sealed 65 wells as part of an earlier MDH well sealing grant from the Clean Water Fund. Priority will be given to wells located in or near existing wellhead protection areas.

Crow Wing
Recipient
Wright SWCD
2016 Fiscal Year Funding Amount
$270,000
Fund Source

The Wright Soil and Water Conservation District (Wright SWCD) has partnered with the Crow River Organization of Waters (CROW), the Natural Resources Conservation Service (NRCS) and Wright County Planning and Zoning on this bacterial impairment reduction project to bring feedlot operations into compliance in the targeted North Fork Crow River (NFCR) impaired Unnamed Creek watershed. An analysis of the NFCR TMDL for Bacteria, Nutrients, and Turbidity was done to determine the area to be prioritized for further review of livestock operations in order to reduce the E.

Wright
Recipient
Blue Earth County SWCD
2016 Fiscal Year Funding Amount
$374,500
Fund Source

The purpose of this project is to reduce phosphorus loading to Crystal Lake transported primarily through County Ditch 56. Crystal Lake is listed on MPCA's 303d listing for phosphorus impairment. Increased phosphorus levels have caused toxic algal blooms, reducing its appeal to recreationalists and economic draw for the City of Lake Crystal. This project will directly address phosphorus sources from agricultural land.

Blue Earth
Recipient
Carver County WMO
2016 Fiscal Year Funding Amount
$31,000
Fund Source

Carver County has identified water quality improvement of Carver, Bevens and Silver Creek as a water management priority. This project will identify storage or wetland restoration sites that are highly effective at reducing pollutant loading to downstream impaired waters using high-resolution Light Detection and Ranging (LiDAR) data and Geographic Information System (GIS) processes. The watershed landscape has been highly modified for agricultural production land development; less than 50 percent of pre-settlement wetland acres remain in Carver County.

Carver
Recipient
Dodge SWCD
2016 Fiscal Year Funding Amount
$50,625
Fund Source

Nitrogen is a serious problem in Minnesota's Mississippi River Basin and the Dodge Soil and Water Conservation District (SWCD) will address this problem through saturated buffers. Nitrates have been linked to adverse health effects, and nitrogen is the leading cause of the dead zone in the Gulf of Mexico. Agriculture drainage through the use of tile drainage systems have been identified as the number one leading source of nitrogen in the Mississippi River Basin.

Dodge
Recipient
Ramsey-Washington Metro WD
2016 Fiscal Year Funding Amount
$150,000
Fund Source

The Ramsey-Washington Metro Watershed District (RWMWD) is responsible for the protection and restoration of the water quality of 20 lakes and 5 creeks within its boundary. Permit and voluntary cost share programs serve to slowly redevelop the watershed to the benefit of these water bodies. However, additional projects are needed- not only to implement green infrastructure in areas that need extra restoration and protection, but also to foster new relationships between citizens and the RWMWD to rally together in a common goal to the benefit of their water resources.

Ramsey
Washington
Recipient
Fillmore SWCD
2016 Fiscal Year Funding Amount
$804,385
Fund Source

After 6 years of intensive baseline monitoring at 5 edge-of-field sites, 1 intermittent and 3 in-stream sites in 3 sub-watersheds representing the geomorphic regions of the Root River, the second phase of the project is well prepared for the implementation of BMPs. Continued monitoring will be used to measure the effectiveness of the BMPs for the next 6 years. In preparation for BMP implementation, extensive planning was completed using LiDAR terrain analysis and the Tomer Framework to prioritize practices.

Fillmore
Houston
Recipient
Comfort Lake-Forest Lake WD
2016 Fiscal Year Funding Amount
$162,000
Fund Source

Forest Lake is one of the top recreational lakes in the metro area with a diverse and healthy fishery along with thee public accesses. The water quality of Forest Lake also impacts downstream waters, particularly Comfort Lake, the Sunrise River, and ultimately Lake St. Croix. A water quality study was completed for Forest Lake identifying nutrient reduction goals to meet state water quality standards for all three basins of Forest Lake along with the Comfort Lake-Forest Lake Watershed District's (CLFLWD) long term goal water quality goals for the lake.

Washington
Recipient
Kandiyohi SWCD
2016 Fiscal Year Funding Amount
$120,024
Fund Source

For several decades, community members, lake associations, county officials, and local natural resource professionals have targeted Lake Wakanda in Kandiyohi County to improve water quality. This community led team, is working to address conservation issues within the watershed and the deeply degraded waters caused by years of altered hydrology, increased urban stormwater runoff, and increased agricultural pressures. This grant application is a phase I approach to resolving these issues by focusing on watershed management in Kandi Creek, a tributary into Lake Wakanda.

Kandiyohi
Recipient
Burnsville, City of
2016 Fiscal Year Funding Amount
$398,000
Fund Source

The Keller Lake Water Quality Improvement Project achieves the goals of the City of Burnsville, Black Dog Watershed Management Organization, and the Keller Lake TMDL by:-Achieving the City of Burnsville phosphorus removal requirement outlined in the Keller Lake TMDL by removing 78 lbs/yr-Utilizing remaining available land to construct a high performance, regional stormwater BMP-Providing a high profile water resource/stormwater educational opportunity in the frequently visited Crystal Beach Park-Retaining valuable open space in popular Crystal Beach Park by constructing the BMP undergroundK

Dakota