RESPEC
2013 Fiscal Year Funding Amount
$49,986
Fund Source

The goal of this project is to continue and finalize Hydrologic Simulation Program FORTRAN (HSPF) watershed model construction and complete the calibration/validation process. The project will add representation of point source discharges to the model, compile flow and water quality data for the purposes of calibration and validation. The end result will be an HSPF watershed model that can readily be used to provide information to support conventional parameter TMDLs.

Mahnomen
Norman
Polk
Recipient
Peer Engineering
2014 Fiscal Year Funding Amount
$115,910
Fund Source

Peer Engineering, Inc. (Peer) will evaluate and recommend to MPCA groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration. Superfund staff will assist in the project by providing oversight of contractual requirements and provide technical assistance as needed.

Dakota
Hennepin
Mower
Rice
Washington
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$249,932
Fund Source

This project will construct, calibrate, a set of HSPF watershed models covering the entire area of the Lake of the Woods drainage, including the Rainy River watershed. The consultant will produce HSPF models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will clearly demonstrate that these models generate predicted output timeseries for hydrology which are consistent with available sets of observed data.

Koochiching
Lake of the Woods
Roseau
St. Louis
Recipient
LimnoTech
2013 Fiscal Year Funding Amount
$121,916
Fund Source

This project will construct, calibrate, and validate an HSPF watershed model for the Zumbro River watershed. The consultant will produce HSPF watershed models that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDLs). The consultant will clearly demonstrate that the models generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen that are consistent with available sets of observed data.

Dodge
Goodhue
Mower
Olmsted
Rice
Steele
Wabasha
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$89,967
Fund Source

This project will construct, calibrate, and validate an HSPF watershed model for the Lake of the Woods River watershed. The consultants will produce HSPF watershed models that can readily be used to provide information to support conventional parameter TMDLs. The consultants will clearly demonstrate that the models generate predicted output time series for hydrology, sediment, nutrients, and dissolved oxygen that are consistent with available sets of observed data.

Lake of the Woods
Roseau
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$250,000
Fund Source

The goal of this project is to complete the calibration/validation process of Hydrologic Simulation FORTRAN (HSPF) watershed models for the Lake of the Woods/Rainy River Basin.

Cook
Koochiching
Lake
Lake of the Woods
Roseau
St. Louis
Recipient
RESPEC
2011 Fiscal Year Funding Amount
$214,963
Fund Source

This project will complete spatial and temporal revisions of 6 Hydrologic Simulation Program FORTRAN (HSPF) models, the recalibration and validation of 7 watershed HSPF models, and the revision of the drainage network and point source representation of the Pomme de Terre HSPF model.

Big Stone
Blue Earth
Brown
Carver
Cottonwood
Dakota
Douglas
Faribault
Freeborn
Grant
Hennepin
Jackson
Le Sueur
Lincoln
Lyon
Mahnomen
Martin
McLeod
Murray
Nicollet
Norman
Otter Tail
Pipestone
Polk
Ramsey
Redwood
Renville
Rice
Scott
Sibley
Steele
Stevens
Swift
Waseca
Watonwan
Yellow Medicine
Recipient
St. Croix Watershed Research Station
2019 Fiscal Year Funding Amount
$213,257
Fund Source

Previous research by the St. Croix Watershed Research Station (SCWRS) has identified lake physics (temperature and oxygen) and nutrient recycling (nitrogen and phosphorus) as key drivers of lake algal blooms. SCWRS will conduct monitoring consistent with the prior research efforts by re-deploying three moored buoys to collect data throughout the 2019 ice-free season, including surface water samples. Additionally, SCWRS will deploy an in situ flourometer to measure total algae and cyanobacteria concentrations and will collect and analyze cyanobacterial toxins.

Lake of the Woods
Roseau
Recipient
Ag Resource Strategies, LLC
2010 Fiscal Year Funding Amount
$300,000
Fund Source

LEQA is a Minnesota Department of Agriculture (MDA) program to help livestock producers address, using a non-regulatory approach, the unique water quality issues on their farms. The MDA has contracted with Ag Resource Strategies, LLC, to recruit farmers to enroll in the LEQA program. The company trains technicians to assess different areas of each farms, such as the farmstead, livestock facilities, fields and wooded areas. The technicians then develop an environmental assessment and identify financial assistance for these projects.

Recipient
Houston Engineering Inc
2017 Fiscal Year Funding Amount
$26,477
Fund Source

This project will address Minnesota Pollution Control Agency (MPCA), United States Environment Protection Agency (EPA), and public comments on draft Total Maximum Daily Load (TMDL) studies and Watershed Restoration and Protection Strategy (WRAPS) reports, preliminary draft TMDL studies, and public noticed TMDL studies and WRAPS reports for the Lower Red River Watershed and the Lake of the Woods Watershed and produce final versions of the TMDL studies and WRAPS reports for each watershed.

Kittson
Lake of the Woods
Marshall
Roseau
Recipient
Koochiching County SWCD
2019 Fiscal Year Funding Amount
$94,650
Fund Source

The purpose of this contract is to establish an international watershed coordinator for the Rainy River- Lake of the Woods (RR-LOW) watershed. The coordinator will assist the Minnesota Pollution Control Agency (MPCA) in facilitating and enhancing civic engagement and public participation activities through collaboration and integration of the efforts of groups working on watershed activities at local, state/provincial, tribal, and bi-national levels.

Koochiching
Recipient
Emmons & Olivier Resources, Inc.
2019 Fiscal Year Funding Amount
$105,777
Fund Source

The goal of this project is to development a Total Maximum Daily Load (TMDL) study that addresses all of the non-mercury-related impaired reaches along the Red River of the North (RRN). The TMDL study will provide an analytical and strategic foundation for recommending restoration strategies for impaired waters. This phase of the project will also include civic engagement efforts by providing water quality framework and stakeholder activities for civic/citizen engagement and communication.

Clay
Kittson
Marshall
Norman
Polk
Wilkin
Recipient
RESPEC
2017 Fiscal Year Funding Amount
$9,998
Fund Source

The goal of this project is to update the time series and calibration for the Sandhill River Hydrological Simulation Program – FORTRAN (HSPF) model.

Mahnomen
Norman
Polk
Recipient
Multiple public water systems
2013 Fiscal Year Funding Amount
$250,000
2015 Fiscal Year Funding Amount
$250,000
2016 Fiscal Year Funding Amount
$113,000
2018 Fiscal Year Funding Amount
$250,000
Fund Source

Approximately 70 percent of all Minnesotans rely on groundwater as their primary source of drinking water. Wells used for drinking water must be properly sealed when removed from service to protect both public health and Minnesota’s invaluable groundwater resources. The Minnesota Department of Health protects both public health and groundwater by assuring the proper sealing of unused wells.
Clean Water funds are being provided to well owners as a 50% cost-share assistance for sealing unused public water-supply wells.

Anoka
Beltrami
Benton
Big Stone
Blue Earth
Cook
Crow Wing
Dakota
Dodge
Faribault
Fillmore
Hennepin
Lyon
McLeod
Morrison
Mower
Olmsted
Rice
Sherburne
Sibley
St. Louis
Stearns
Steele
Swift
Todd
Waseca
Washington
Watonwan
Winona
Wright
Recipient
LimnoTech
2014 Fiscal Year Funding Amount
$75,027
Fund Source

The Zumbro River watershed HSPF model will be refined to include recent data and information as well as evaluate various management scenarios to inform the most effective actions for reducing sediment and nutrient loading and improving water quality. Specifically, to provide the foundation for the Lake Zumbro Phosphorus Total Maximum Daily Load (TMDL).

Winona
Recipient
LimnoTech
2017 Fiscal Year Funding Amount
$62,622
Fund Source

The goal of this project is to test the sensitivity of the Zumbro River Watershed Hydrological Simulation Program FORTRAN (HSPF) model management scenario results. Additional goals are to develop Total Maximum Daily Loads (TMDLs) for impaired stream reaches and Rice Lake, which will be documented in a TMDL Report. The consultant will apply the existing calibrated and validated Zumbro River Watershed HSPF model to construct load duration curves to develop TMDLs.

Dodge
Goodhue
Olmsted
Rice
Steele
Wabasha
Recipient
LimnoTech
2019 Fiscal Year Funding Amount
$59,532
Fund Source

In previous phases of work, a Hydrologic Simulation Program FORTRAN (HSPF) model of the Zumbro River Watershed was developed to simulate hydrology and water quality for the 1995-2009 simulation period (Phase I), applied to evaluate various management scenarios for reducing sediment and nutrient loading (Phase II), and used to develop Total Maximum Daily Loads (TMDLs) for impaired stream segments and inform development of a nutrient TMDL for Rice Lake (Phase III).

Dodge
Goodhue
Olmsted
Rice
Steele
Wabasha