Minnesota's Legacy

All Projects

Showing 1 - 10 of 10 | Export projects
Recipient
Tetra Tech
2019 Fiscal Year Funding Amount
$49,491
Fund Source

This is the second phase of building the Hydrologic Simulation Program FORTRAN (HSPF) model for the Buffalo River watershed. This work will include completion of the model including final calibration and validation.

Becker
Clay
Otter Tail
Wilkin
Recipient
Tetra Tech
2018 Fiscal Year Funding Amount
$49,925
Fund Source
Becker
Clay
Otter Tail
Wilkin
Recipient
Tetra Tech
2019 Fiscal Year Funding Amount
$49,491
Fund Source

This is the second phase of building the Hydrologic Simulation Program FORTRAN (HSPF) model for the Buffalo River watershed. The project will result in a completed model including necessary calibration and validation phases.

Becker
Clay
Otter Tail
Wilkin
Recipient
Houston Engineering
2012 Fiscal Year Funding Amount
$70,921
Fund Source

This project will continue to develop, and calibrate/validate the hydrology of an Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Buffalo River watershed. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval.

Wilkin
Otter Tail
Clay
Becker
Recipient
Houston Engineering
2016 Fiscal Year Funding Amount
$4,953
Fund Source

The goal of this project is to address public comments on the public noticed draft Watershed Restoration & Protection Strategy (WRAPS) study and Total Maximum Daily Load (TMDL) report for the watershed, and to produce a final draft WRAPS study and TMDL report ready for final approval by the United States Environmental Protection Agency (USEPA) and Minnesota Pollution Control Agency (MPCA).

Becker
Clay
Otter Tail
Wilkin
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$89,967
Fund Source

This project will construct, calibrate, and validate an HSPF watershed model for the Lake of the Woods River watershed. The consultants will produce HSPF watershed models that can readily be used to provide information to support conventional parameter TMDLs. The consultants will clearly demonstrate that the models generate predicted output time series for hydrology, sediment, nutrients, and dissolved oxygen that are consistent with available sets of observed data.

Lake of the Woods
Roseau
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$249,932
Fund Source

This project will construct, calibrate, a set of HSPF watershed models covering the entire area of the Lake of the Woods drainage, including the Rainy River watershed. The consultant will produce HSPF models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will clearly demonstrate that these models generate predicted output timeseries for hydrology which are consistent with available sets of observed data.

Koochiching
Lake of the Woods
Roseau
St. Louis
Recipient
Aqua Terra Consultants
2013 Fiscal Year Funding Amount
$36,848
Fund Source

This project will maximize the utility and usefulness of three HSPF models that have been constructed and calibrated for hydrology. The contractor will identify and reduce parameterization errors in the following three HSPF models: 1) Buffalo River Watershed, 2 ) Thief River Watershed, 3) Bois de Sioux-Mustinka Watersheds. This will result, not only in a better hydrology calibration, but will also improve each of the models’ ability to more accurately estimate sediment and pollutant loads and concentrations.

Becker
Beltrami
Big Stone
Clay
Grant
Marshall
Otter Tail
Pennington
Roseau
Stevens
Traverse
Wilkin
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$250,000
Fund Source

The goal of this project is to complete the calibration/validation process of Hydrologic Simulation FORTRAN (HSPF) watershed models for the Lake of the Woods/Rainy River Basin.

Cook
Koochiching
Lake
Lake of the Woods
Roseau
St. Louis
Recipient
Houston Engineering Inc
2017 Fiscal Year Funding Amount
$26,477
Fund Source

This project will address Minnesota Pollution Control Agency (MPCA), United States Environment Protection Agency (EPA), and public comments on draft Total Maximum Daily Load (TMDL) studies and Watershed Restoration and Protection Strategy (WRAPS) reports, preliminary draft TMDL studies, and public noticed TMDL studies and WRAPS reports for the Lower Red River Watershed and the Lake of the Woods Watershed and produce final versions of the TMDL studies and WRAPS reports for each watershed.

Kittson
Lake of the Woods
Marshall
Roseau