Minnesota's Legacy

All Projects

Showing 1 - 5 of 5 | Export projects
Recipient
Peer Engineering
2014 Fiscal Year Funding Amount
$115,910
Fund Source

Peer Engineering, Inc. (Peer) will evaluate and recommend to MPCA groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration. Superfund staff will assist in the project by providing oversight of contractual requirements and provide technical assistance as needed.

Dakota
Hennepin
Mower
Rice
Washington
Recipient
Houston Engineering Inc
2019 Fiscal Year Funding Amount
$46,510
Fund Source

This project will develop a watershed wide Total Maximum Daily Load (TMDL) study and River Eutrophication Standard (RES) TMDL report for water quality impairments in the Des Moines River basin, which includes the Des Moines River Headwaters, Lower Des Moines River, and East Fork Des Moines River watersheds.

Cottonwood
Jackson
Lyon
Martin
Murray
Nobles
Pipestone
Recipient
Emmons & Olivier Resources, Inc.
2019 Fiscal Year Funding Amount
$38,292
Fund Source

This project will develop the Pomme de Terre Watershed Total Maximum Daily Load (TMDL) study for the second round of the 10-year watershed approach cycle in the Pomme de Terre watershed. This phase of the project will address 4 stream impairments and 3 lake impairments and produce a draft TMDL document. A second phase may be needed as the stressor ID report identifies more stream reaches with TMDL relevant stressors.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Stevens Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$132,120
Fund Source

Certain stretches of the Pomme de Terre River have been identified as impaired. This project will quantify the reductions in pollutant loading that would be necessary to bring water quality in the impaired stretches to an acceptable level. It will also identify strategies that would improve water quality in these impaired stretches. Some funds will support public input activities into the Pomme de Terre River watershed management plan.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Heron Lake Watershed District
2014 Fiscal Year Funding Amount
$31,643
Fund Source
The goal of this project is to establish a framework that the local government can use to guide their involvement as the WFDMR Watershed Project progresses over the next four years. This will enhance the success of the overarching goal of providing a framework for which the local government and watershed organizations can engage the public in a manner that will lead to water quality improvement. This will result in strategies to protect or restore the waters in this watershed.
Jackson
Martin