Minnesota's Legacy

All Projects

Showing 1 - 40 of 55 | Export projects
Recipient
Becker SWCD
2016 Fiscal Year Funding Amount
$254,897
Fund Source

With over 500 public water lakes in Becker County, we are blessed with abundant and diverse lake resources that, like those of much of lake country, are at risk of degradation due to increasing development pressures, redevelopment of non-conforming lots, rising stormwater runoff and land use changes within their watersheds.

Becker
Recipient
Tetra Tech
2019 Fiscal Year Funding Amount
$49,491
Fund Source

This is the second phase of building the Hydrologic Simulation Program FORTRAN (HSPF) model for the Buffalo River watershed. This work will include completion of the model including final calibration and validation.

Becker
Clay
Otter Tail
Wilkin
Recipient
Tetra Tech
2018 Fiscal Year Funding Amount
$49,925
Fund Source
Becker
Clay
Otter Tail
Wilkin
Recipient
Tetra Tech
2019 Fiscal Year Funding Amount
$49,491
Fund Source

This is the second phase of building the Hydrologic Simulation Program FORTRAN (HSPF) model for the Buffalo River watershed. The project will result in a completed model including necessary calibration and validation phases.

Becker
Clay
Otter Tail
Wilkin
Recipient
Becker SWCD
2018 Fiscal Year Funding Amount
$398,000
Fund Source
Becker
Recipient
Houston Engineering
2012 Fiscal Year Funding Amount
$70,921
Fund Source

This project will continue to develop, and calibrate/validate the hydrology of an Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Buffalo River watershed. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval.

Wilkin
Otter Tail
Clay
Becker
Recipient
Houston Engineering
2016 Fiscal Year Funding Amount
$4,953
Fund Source

The goal of this project is to address public comments on the public noticed draft Watershed Restoration & Protection Strategy (WRAPS) study and Total Maximum Daily Load (TMDL) report for the watershed, and to produce a final draft WRAPS study and TMDL report ready for final approval by the United States Environmental Protection Agency (USEPA) and Minnesota Pollution Control Agency (MPCA).

Becker
Clay
Otter Tail
Wilkin
Recipient
Buffalo-Red River Watershed District
2011 Fiscal Year Funding Amount
$105,408
Fund Source

A partnership of local, state and federal organizations has used multiple funding sources to target nonpoint pollution reduction efforts to the Hay Creek Watershed, a 24-square-mile area in Becker County that features several high- quality lakes. Clean Water Legacy grants were received in 2008 by the Buffalo-Red River Watershed District and in 2011 by the Becker SWCD. The grants leveraged both local and federal dollars, and it built on previous efforts to identify locations where conservation projects could provide the greatest benefits for water quality and wildlife habitat.

Becker
Recipient
Buffalo-Red River Watershed District
2011 Fiscal Year Funding Amount
$249,968
Fund Source

The Buffalo River Watershed Pilot Project is one of two pilots in Minnesota designed to develop a watershed approach for managing Minnesota’s surface waters. The goal of this project is to develop a plan that will guide surface water quality management throughout the watershed.

Becker
Clay
Otter Tail
Wilkin
Recipient
Minnesota Department of Health
2019 Fiscal Year Funding Amount
$1,100,000
2018 Fiscal Year Funding Amount
$1,100,000
2017 Fiscal Year Funding Amount
$1,100,000
2016 Fiscal Year Funding Amount
$1,100,000
2015 Fiscal Year Funding Amount
$1,150,000
2014 Fiscal Year Funding Amount
$1,150,000
2013 Fiscal Year Funding Amount
$1,020,000
2012 Fiscal Year Funding Amount
$1,020,000
2011 Fiscal Year Funding Amount
$744,717
2010 Fiscal Year Funding Amount
$250,291
Fund Source

The Drinking Water Contaminants of Emerging Concern (CEC) program identifies environmental contaminants for which current health-based standards currently do not exist or need to be updated, investigate the potential for human exposure to these chemicals, and develop guidance values for drinking water. Contaminants evaluated by CEC staff include contaminants that have been released or detected in Minnesota waters (surface water and groundwater) or that have the potential to migrate to or be detected in Minnesota waters.

Statewide
Recipient
Aqua Terra Consultants
2013 Fiscal Year Funding Amount
$36,848
Fund Source

This project will maximize the utility and usefulness of three HSPF models that have been constructed and calibrated for hydrology. The contractor will identify and reduce parameterization errors in the following three HSPF models: 1) Buffalo River Watershed, 2 ) Thief River Watershed, 3) Bois de Sioux-Mustinka Watersheds. This will result, not only in a better hydrology calibration, but will also improve each of the models’ ability to more accurately estimate sediment and pollutant loads and concentrations.

Becker
Beltrami
Big Stone
Clay
Grant
Marshall
Otter Tail
Pennington
Roseau
Stevens
Traverse
Wilkin
Recipient
Lake of the Woods Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$108,044
Fund Source

This project involves the water quality monitoring of, and data analysis for four major watersheds (8-digit Hydrologic Unit Codes) in the Rainy River Basin. This monitoring will assist in providing the water chemistry data needed to calculate annual pollutant loads for the Major Watershed Pollutant Load Monitoring Network (MWPLMN) and provide short term data sets of select parameters to other Agency programs.

Beltrami
Itasca
Koochiching
Lake of the Woods
St. Louis
Recipient
RESPEC
2011 Fiscal Year Funding Amount
$174,579
Fund Source

This project will construct, calibrate, and validate two Hydrologic Simulation Program FORTRAN (HSPF) watershed models. The consultant will produce HSPF models that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDLs) at the Big Fork River and Little Fork River watersheds.

Itasca
Koochiching
St. Louis
Recipient
Otter Tail, East SWCD
2017 Fiscal Year Funding Amount
$58,000
Fund Source

The purpose of this project is to identify effective irrigation and nutrient management best management practices and technologies and the barriers that prevent irrigators, producers, and other agricultural partners from adopting them in Otter Tail County. The primary goal is to reduce nitrate in areas where groundwater is susceptible to contamination as mapped by The Minnesota Department of Health by identifying effective BMPs and addressing the barriers to their adoption.

Becker
Douglas
Otter Tail
Todd
Wadena
Recipient
Itasca SWCD
2019 Fiscal Year Funding Amount
$18,016
Fund Source

This contract is for Itasca County Soil and Water Conservation District (SWCD) to assist in the public participation activities in Rainy Basin Watersheds of Little Fork and Big Fork.

Itasca
Recipient
Itasca County Soil and Water Conservation District
2014 Fiscal Year Funding Amount
$69,980
Fund Source

This project will develop, implement, and evaluate the impacts of co-developed civic engagement outcomes for the St. Louis River, Big Fork River, and Littlefork River watersheds.

Itasca
Recipient
Koochiching County Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$73,777
2014 Fiscal Year Funding Amount
$181,976
Fund Source

The Koochiching County SWCD staff will collect water chemistry and field parameters at specific times to determine amount of contaminant load into each stream. These sites will coincide with locations where stream flow data is also being collected. This project will focus on watershed load monitoring in both the Big Fork and Little Fork River watersheds.

Itasca
Koochiching
St. Louis
Recipient
Crow Wing County
2015 Fiscal Year Funding Amount
$67,300
Fund Source

This project is a cooperative effort between Crow Wing and Itasca County to contract with RMB Laboratories to generate 65 lake assessment/trend analysis reports. The watershed protection model is an innovative and proactive approach to water resource management which is geared towards prioritizing areas of concern, targeting implementation strategies, and measuring their effectiveness. These assessments are also useful and understandable tools for lake associations and the public.

Crow Wing
Itasca
Recipient
Koochiching SWCD
2018 Fiscal Year Funding Amount
$81,391
Fund Source

The Little Fork River Watershed Assessment will include the waters of the Rice River, Little Fork River, Flint Creek, Nett Lake River, Beaver Brook, Valley River, Willow River, Sturgeon River, Bear River, Dark River, and the Lost River. This Assessment will also include Little Bear Lake, Bear Lake, Thistledew Lake, Little Moose Lake, Raddison Lake, Napoleon Lake, Owen Lake, Dark Lake, Clear Lake, Long (Main) Lake, Dewey Lake, and Long (North) Lake. These lakes and streams are found throughout the Little Fork River Watershed, which spans parts of Koochiching, St. Louis and Itasca Counties.

Itasca
Koochiching
St. Louis
Recipient
United States Geological Survey (USGS)
2013 Fiscal Year Funding Amount
$140,000
Fund Source

The Little Fork River and Big Fork River - USGS FLOWSED project was established to collect site specific data for streamflow, SSC, and bedload at the Littlefork and Big Fork Rivers in Northern Minnesota; use the data to evaluate the use of dimensionless sediment rating curves for the rivers; and document the results of the study in conjunction with the results from other rivers in the state for the application of regional sediment rating curves to rivers in Minnesota.

Itasca
Koochiching
Recipient
Emmons & Oliver Resources (EOR)
2014 Fiscal Year Funding Amount
$100,006
Fund Source
This project will develop and finalize the WRAPS for the Little Fork River Watershed.
Itasca
Koochiching
Recipient
Emmons & Olivier Resources Inc
2017 Fiscal Year Funding Amount
$3,730
Fund Source

The purpose of this project is to re-calculate the Littlefork river sediment Total Maximum Daily Load (TMDL) utilizing the 15 mg/L Total Suspended Solids (TSS) standard and update the associated Littlefork Watershed Restoration and Protection Strategies (WRAPS) document.

Itasca
Koochiching
Recipient
St. Louis County
2016 Fiscal Year Funding Amount
$200,000
Fund Source

St. Louis County's Comprehensive Water Management Plan Update 2010-2020 identifies providing financial assistance to qualifying homeowners to upgrade or replace failing septic systems as a Priority 2 action. Funds from the FY-16 Clean Water Fund Projects and Practices Grant will be used to provide funding to low-income homeowners to repair or replace SSTS identified as Imminent Threat to Public Health (ITPH) within the following watersheds: Lake Superior South, St.

St. Louis
Recipient
Minnesota Department of Agriculture and Multiple local partners
2019 Fiscal Year Funding Amount
$3,000,000
2018 Fiscal Year Funding Amount
$2,000,000
2017 Fiscal Year Funding Amount
$2,500,000
2016 Fiscal Year Funding Amount
$2,500,000
2015 Fiscal Year Funding Amount
$1,500,000
2014 Fiscal Year Funding Amount
$1,500,000
2013 Fiscal Year Funding Amount
$132,830
2012 Fiscal Year Funding Amount
$173,380
Fund Source

The Minnesota Ag Water Quality Certification Program (MAWQCP) is a voluntary opportunity for farmers and agricultural landowners to take the lead on implementing conservation practices that protect water quality. Those who implement and maintain approved conservation practices will be certified and in turn obtain regulatory certainty for a period of ten years. This program will help address concerns about changing regulatory requirements from multiple state and federal agencies.

Faribault
Jackson
Martin
Olmsted
Otter Tail
Stearns
Wabasha
Wilkin
Winona
Recipient
Minnesota Pollution Control Agency
2014 Fiscal Year Funding Amount
$297,169
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Pollution Control Agency
2015 Fiscal Year Funding Amount
$287,628
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Department of Natural Resources
2011 Fiscal Year Funding Amount
$140,000
Fund Source

The Minnesota Department of Natural Resources will coordinate the collection of high-resolution elevation data for northeastern portion of Minnesota using Light Detection and Ranging (LIDAR) systems. The geographic area of the work includes Minnesota counties of Carlton, Cook, Lake, and St. Louis Counties and that portion of Koochiching County that comprises Voyageurs National Park.

Carlton
Cook
Koochiching
Lake
St. Louis
Recipient
Otter Tail, East SWCD
2014 Fiscal Year Funding Amount
$150,000
Fund Source

The Otter Tail County Community Partners Grant Project will enable community groups to go beyond planning and take action to protect their water resources. This grant program will provide targeted community groups with the means to make positive improvements now and identify high priority projects for future opportunities. Engaging community members in the identification of water protection opportunities with the data in recently completed lake assessment reports will help build connections and foster a stewardship ethic.

Otter Tail
Recipient
Otter Tail, West SWCD
2015 Fiscal Year Funding Amount
$290,616
Fund Source

This Initiative is a nine-year plan to take a systematic approach to inventory and analyze all Public Waters within the County. Phase 1 includes identifying areas of concern through GIS analysis of current landuse along Public Waters, and the development of a database of non-compliant landowners which will be updated and maintained. Once landowners have been identified they will receive a joint letter and map stating that they may not be in compliance.

Otter Tail
Recipient
Otter Tail, East SWCD
2017 Fiscal Year Funding Amount
$471,000
Fund Source

The purpose of this project is to develop a detailed tool that can be used in all watersheds within the Otter Tail and Becker counties to prioritize, target, and measure implementation practices at the field scale. The PTM App will significantly increase the targeting capabilities in Otter Tail and Becker Counties. The Watershed Restoration and Protection Strategy has not been completed for Otter Tail County, yet, and the PTM App will be able to assist targeting and prioritizing when those documents are created.

Becker
Otter Tail
Recipient
Red River Watershed Mgmt Board
2014 Fiscal Year Funding Amount
$235,250
Fund Source

The Prioritization, Targeting, and Measuring Water Quality Improvement Application (PTMA) connects the general qualitative strategies in a Total Maximum Daily Load (TMDL) and Watershed Restoration and Protection (WRAP) and the identification of implementable on-the-ground Best Management Practices (BMPs). Leveraging geospatial data from the International Water Institute this application will be developed for two pilot areas within the Red River Basin.

Becker
Cass
Clay
Grant
Mahnomen
Norman
Otter Tail
Traverse
Recipient
Buffalo-Red River WD
2017 Fiscal Year Funding Amount
$168,000
Fund Source

This project will result in the development of three critical pieces of information. They include: 1. Development of restoration and protection strategies for all waterbodies in the district relative to the State's Non-point Source Funding plan 2. Use of PTMApp to tie the WRAPs implementation tables from the Buffalo and Red River Watersheds to targeted on-the-ground projects and practices that will provide measurable water quality improvements, and 3.

Becker
Clay
Otter Tail
Wilkin
Recipient
Otter Tail, West SWCD
2017 Fiscal Year Funding Amount
$54,800
Fund Source

Realizing the need for increased technical capacity in the field offices, the Becker, East Otter Tail and West Otter Tail Soil and Water Conservation Districts have developed an agreement that will increase technical capacity while minimizing costs to each district. The first step was taken in this agreement through the recent hire of a shared engineer. Currently, minimal survey grade equipment is owned by the districts. This grant will be used to purchase an integrated survey system.

Becker
Otter Tail
Recipient
University of Minnesota Center for Changing Landscapes
2018 Fiscal Year Funding Amount
$15,490
Fund Source

This project seeks assistance from University of Minnesota in developing effective interview questions for community watershed assessments and will assist in understanding the data collected through community interviews.

Itasca
Koochiching
Lake of the Woods
Recipient
Koochiching County SWCD
2019 Fiscal Year Funding Amount
$323,695
Fund Source

Koochiching County has seven major watersheds in the county, this contract is for work in five of them: Big Fork, Little Fork, Rapid River, Lower Rainy River, and Rainy River Headwaters. The local Koochiching County Soil and Water Conservation District (SWCD) is positioned to assist in several elements of the Watershed Restoration and Protection Strategies (WRAPS) process. This includes gap monitoring for water chemistry, sediment work, Total Maximum Daily Load (TMDL) development, modeling scenarios, and WRAPS development.

Itasca
Koochiching
St. Louis
Recipient
Koochiching County Soil and Water Conservation District (KSWCD)
2013 Fiscal Year Funding Amount
$104,975
Fund Source

The purpose of this project is to establish an International Watershed Coordinator for the Lake of the Woods and Rainy River (LOW/RR) watershed, to assist the MPCA in facilitating and enhancing civic engagement through collaboration and integration of the efforts of groups working on watershed activities at local, state/provincial and bi-national levels of organization.

Koochiching
Recipient
Koochiching County SWCD
2017 Fiscal Year Funding Amount
$99,930
Fund Source

This project will provide an important framework for civic and citizen engagement and communication in the International Rainy River-Lake of the Woods Watershed, which will contribute to long-term public participation in surface water protection and restoration activities.

Cook
Itasca
Koochiching
Lake
Lake of the Woods
St. Louis
Recipient
US Geological Survey
2019 Fiscal Year Funding Amount
$12,880
Fund Source

US Geological Survey (USGS) will perform real-time water quality monitoring at its stations located in Fargo and Grand Forks. The Minnesota Pollution Control Agency co-sponsors this work along with USGS, North Dakota Dept. of Health, the cities of Fargo, Moorhead, Grand Forks, and East Grand Forks.

Clay
Polk
Recipient
Red River Watershed Mgmt Board
2014 Fiscal Year Funding Amount
$30,636
Fund Source

As part of the FY 2012 funding cycle, the Board of Water and Soil Resources granted funds for development of the Water Quality Decision Support Application (WQDSA). The WQDSA will provide land and water managers with geospatial data and online tools to prioritize, market, and implement actions on the landscape to achieve water quality objectives identified in local and state water plans and to ensure that public funding decisions are strategic and defensible.

Becker
Clay
Mahnomen
Norman
Polk
Recipient
International Water Institute
2012 Fiscal Year Funding Amount
$272,267
2014 Fiscal Year Funding Amount
$359,367
Fund Source

International Water Institute (IWI) staff will monitor 24 sites in the Bois de Sioux, Mustinka (2 sites), Buffalo (8 sites), Red Lake (4 sites), Sandhill (3 sites), Thief (2 sites), and Tamarac River (3 sites) Watersheds intensively over a 2 year period in an attempt to collect 25 samples per year at each site. If conditions allow for the collection of all planned samples, 1200 stream samples will be collected over the time period. Monitoring will include field measurements, observations, and at least three photographs during each site visit.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin