Minnesota's Legacy

All Projects

Showing 1 - 40 of 401 | Export projects
Recipient
Peer Engineering
2012 Fiscal Year Funding Amount
$72,000
Fund Source

Contractor assistance with site selection, reconnaissance and obtaining access for installation of ambient groundwater monitoring wells in Ramsey county and Hennepin county. This project will provide services and oversight of the installation for up to 16 well sites.

Statewide
Recipient
Peer Engineering
2014 Fiscal Year Funding Amount
$115,910
Fund Source

Peer Engineering, Inc. (Peer) will evaluate and recommend to MPCA groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration. Superfund staff will assist in the project by providing oversight of contractual requirements and provide technical assistance as needed.

Dakota
Hennepin
Mower
Rice
Washington
Recipient
Widseth Smtih Nolting
2014 Fiscal Year Funding Amount
$116,042
Fund Source

Widseth Smith Nolting (WSN) will evaluate and recommend to MPCA groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration. Superfund staff will assist in the project by providing oversight of contractual requirements and provide technical assistance as needed.

Statewide
Recipient
Widseth Smtih Nolting
2015 Fiscal Year Funding Amount
$74,429
Fund Source

Widseth Smith Nolting (WSN) will evaluate and recommend to Minnesota Pollution Control Agency (MPCA) groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration.

Statewide
Recipient
Widseth Smith & Nolting
2012 Fiscal Year Funding Amount
$177,052
Fund Source

Contractor assistance with site selection, reconnaissance and obtaining access for installation of ambient groundwater monitoring wells in northcentral and northeastern Minnesota. This project will provide services and oversight of the installation for up to 31 well sites.

Statewide
Recipient
AMEC Geomatrix
2010 Fiscal Year Funding Amount
$80,000
Fund Source

Installation of 35-40 monitoring wells in the 11 county metropolitan area.

Statewide
Recipient
Thein Well Company
2010 Fiscal Year Funding Amount
$73,945
Fund Source

This construction project will provide the installation of (40) wells to support Ambient Groundwater monitoring activities at the MPCA.

Statewide
Recipient
Widseth Smith Nolting (WSN)
2010 Fiscal Year Funding Amount
$20,000
Fund Source

Contractor assistance with site selection, reconnaissance and obtaining access for installation of ambient groundwater monitoring wells in Minnesota. This project will provide services for up to 25 well sites.

Statewide
Recipient
Metropolitan Council/Barr Engineering Company
2010 Fiscal Year Funding Amount
$26,593
2011 Fiscal Year Funding Amount
$44,536
Fund Source

On behalf of the Metropolitan Council, Barr Engineering Company was contracted to assess the local water resources in the City of East Bethel area, where the city and Metropolitan Council are working closely to design a water reclamation and reuse facility intended to treat wastewater generated by future growth. This project evaluated plans for land use, water and sewers using a local groundwater flow model to identify potential risks to high-value water resources.

Anoka
Recipient
Wenck Associates, Inc.
2012 Fiscal Year Funding Amount
$4,811
Fund Source

This project will support updates to the Draft Bald Eagle Lake TMDL. The updates will address comments received during the public comment period. The comments resulted in the development of individual Wasteload Allocations for stormwater sources in the Bald Eagle Lake watershed.

Anoka
Dakota
Hennepin
Ramsey
Washington
Recipient
Emmons and Olivier Resources, Inc
2018 Fiscal Year Funding Amount
$17,448
Fund Source

Bartlett Lake in Koochiching County is impaired for eutrophication and has already undergone a paleolimnological study. This project will utilize the data and results of paleolimnological study to develop in-lake management strategies that, if implemented, could significantly improve the water quality of Bartlett Lake.

Koochiching
Recipient
Tetra Tech
2013 Fiscal Year Funding Amount
$109,878
Fund Source

The goal of this project is to develop statewide biological criteria for managing the state’s water resources, in keeping with the federal Clean Water Act. The MPCA is using the Biological Condition Gradient (BCG) for this development. The BCG is a conceptual model that describes changes in aquatic ecosystems on a gradient of increasing anthropogenic stress.

Statewide
Recipient
Rhithron Associates
2015 Fiscal Year Funding Amount
$155,860
Fund Source

The purpose of this project is to provide stream and large river macro invertebrate sample processing and identification for the Minnesota Pollution Control agency (MPCA) Biological Monitoring Unit.

The final product will consist of; data submitted electronically to the MPCA, project reference specification, return of all identified specimens, and an external and internal QA/QC report.

Statewide
Recipient
Barr Engineering Company
2011 Fiscal Year Funding Amount
$18,020
Fund Source

This project will develop a Final TMDL report and Implementation Plan for the Bluff Creek Watershed.  The main outcomes of this project are the development of a Final TMDL Report approved by MPCA and EPA and a Final Implementation Plan approved by MPCA. 

Carver
Dakota
Hennepin
Le Sueur
McLeod
Rice
Scott
Sibley
Recipient
Barr Engineering Company
2011 Fiscal Year Funding Amount
$34,339
Fund Source

This Total Maximum Daily Load (TMDL) project will develop a TMDL Report and Implementation Plan defining the sources contributing to the impairments and outlining the steps necessary to bring Bluff Creek back to meeting water quality standards.

Carver
Dakota
Hennepin
Le Sueur
McLeod
Nicollet
Ramsey
Renville
Rice
Scott
Sibley
Recipient
Emmons & Olivier Resources, Inc.
2019 Fiscal Year Funding Amount
$14,950
Fund Source

This project will result in the final the Bois de Sioux River Watershed Restoration and Protection Strategies (WRAPS) report and Total Maximum Daily Load (TMDL) study. This work order will authorize the consultant to address all comments received during the public notice period and produce the final WRAPS report for the Minnesota Pollution Control Agency's final approval and a final TMDL study for United States Environmental Protection Agency's (EPA) final approval.

Grant
Otter Tail
Traverse
Wilkin
Recipient
RESPEC
2017 Fiscal Year Funding Amount
$62,485
Fund Source

This project involves the extension and update of the Hydrological Simulation Program FORTRAN (HSPF) model for the Bois de Sioux and Mustinka watersheds.

Big Stone
Grant
Otter Tail
Stevens
Traverse
Wilkin
Recipient
Emmons & Olivier Resources Inc
2017 Fiscal Year Funding Amount
$10,381
Fund Source

This project will address United States Environmental Protection Agency (EPA) comments on the preliminary draft Total Maximum Daily Load (TMDL) study and Minnesota Pollution Control Agency (MPCA) comments on the pre-public notice draft TMDL study and Watershed Restoration and Protection Strategy (WRAPS) report, and produce the public notice draft TMDL study and the public notice draft WRAPS report ready for public review and comment. Conduct one public meeting for each watershed to present public notice drafts of the TMDL study and WRAPS report for each watershed.

Grant
Otter Tail
Traverse
Wilkin
Recipient
Tetra Tech
2019 Fiscal Year Funding Amount
$49,491
Fund Source

This is the second phase of building the Hydrologic Simulation Program FORTRAN (HSPF) model for the Buffalo River watershed. This work will include completion of the model including final calibration and validation.

Becker
Clay
Otter Tail
Wilkin
Recipient
Tetra Tech
2018 Fiscal Year Funding Amount
$49,925
Fund Source
Becker
Clay
Otter Tail
Wilkin
Recipient
Tetra Tech
2019 Fiscal Year Funding Amount
$49,491
Fund Source

This is the second phase of building the Hydrologic Simulation Program FORTRAN (HSPF) model for the Buffalo River watershed. The project will result in a completed model including necessary calibration and validation phases.

Becker
Clay
Otter Tail
Wilkin
Recipient
Houston Engineering
2012 Fiscal Year Funding Amount
$70,921
Fund Source

This project will continue to develop, and calibrate/validate the hydrology of an Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Buffalo River watershed. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval.

Wilkin
Otter Tail
Clay
Becker
Recipient
Houston Engineering
2016 Fiscal Year Funding Amount
$4,953
Fund Source

The goal of this project is to address public comments on the public noticed draft Watershed Restoration & Protection Strategy (WRAPS) study and Total Maximum Daily Load (TMDL) report for the watershed, and to produce a final draft WRAPS study and TMDL report ready for final approval by the United States Environmental Protection Agency (USEPA) and Minnesota Pollution Control Agency (MPCA).

Becker
Clay
Otter Tail
Wilkin
Recipient
LimnoTech
2014 Fiscal Year Funding Amount
$134,427
Fund Source
The goal of this project is to construct, calibrate, and validate an HSPF watershed model for the Cannon River Watershed.
Dakota
Goodhue
Le Sueur
Rice
Steele
Waseca
Recipient
LimnoTech
2015 Fiscal Year Funding Amount
$154,020
2016 Fiscal Year Funding Amount
$6,915
Fund Source

The goal of this project is to apply the Hydrological Simulation Program FORTRAN (HSPF) model to evaluate scenarios to support potential management actions and implementation in the watershed, construct Total Maximum Daily Load (TMDL) studies, and to develop a conceptual site model of the lakes for understanding phosphorus release.

Dakota
Goodhue
Le Sueur
Rice
Steele
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$40,000
Fund Source
There are two main goals of this Cedar Basin HSPF project, A. Overall development of the HSPF model in the Cedar Basin of Minnesota; and B. Shell Rock River nutrient, DO , impairment modeling and TMDL completion.
Dodge
Freeborn
Mower
Steele
Recipient
Emmons & Olivier Resources Inc
2017 Fiscal Year Funding Amount
$34,959
Fund Source

This project will guide local implementation planning efforts by identifying water quality goals, strategies, and implementation milestones in the Cedar River Watershed. This watershed includes 435 square miles in major portions of Mower, Freeborn and Dodge Counties, and incudes the regional center of Austin. A Watershed Restoration and Protection Strategy (WRAPS) report will be completed by this effort.

Dodge
Freeborn
Mower
Recipient
Barr Engineering Co
2017 Fiscal Year Funding Amount
$48,510
Fund Source

This project is for the Cedar River Watershed, which includes major portions of Mower, Freeborn and Dodge Counties in southern Minnesota. The scope of this project is to complete the Total Maximum Daily Load (TMDL) studies for 11 stream reaches with sediment impairments, and 14 stream reaches for bacteria impairments. The major product of this effort will be the final Cedar River TMDL report, which will be submitted to the United States Environmental Protection Agency, and public-noticed by the Minnesota Pollution Control Agency.

Dodge
Freeborn
Mower
Recipient
Axys Analytical Services, Ltd.
2015 Fiscal Year Funding Amount
$140,535
Fund Source

This study will test groundwater and drain tile waters at concentrated animal feedlot opperations (CAFOs) to evaluate the presence of intibiotics and hormones. Samples will be collected from monitoring wells, tile drain sumps, and tile line discharges.

Water samples will be sent to Axys Analytical Services as they are colleced from each monitoring site. A total of 18 samples will be generated in the field by pumping ultrapure water through the sampling system.

Statewide
Recipient
Funding is awarded to projects selected by the evaluation committee. This is a competitive process.
2019 Fiscal Year Funding Amount
$662,000
2018 Fiscal Year Funding Amount
$663,000
2017 Fiscal Year Funding Amount
$787,000
2016 Fiscal Year Funding Amount
$788,000
2015 Fiscal Year Funding Amount
$1,100,000
2014 Fiscal Year Funding Amount
$1,000,000
2013 Fiscal Year Funding Amount
$1,050,000
2012 Fiscal Year Funding Amount
$1,050,000
Fund Source

The  goals of the program are to evaluate the effectiveness of agricultural conservation practices, identify underlying processes that affect water quality, and develop technologies to target critical areas of the landscape. Funded projects provide current and accurate scientific data on the environmental impacts of agricultural practices and help to develop or revise agricultural practices that reduce environmental impacts while maintaining farm profitability.

Statewide
Recipient
Metropolitan Council/Environmental Financial Group Inc.
2010 Fiscal Year Funding Amount
$11,785
2011 Fiscal Year Funding Amount
$36,754
Fund Source

On behalf of the Metropolitan Council, Environmental Financial Group Inc. generated a matrix of water conservation programs with detailed information about the costs and benefits of the programs. Tools were also developed to allow users to calculate potential water savings, estimate program implementation costs, and test the effects of various water conservation programs and rate structures.

Aitkin
Anoka
Becker
Beltrami
Benton
Big Stone
Blue Earth
Brown
Carlton
Carver
Cass
Chippewa
Chisago
Clay
Clearwater
Cook
Cottonwood
Crow Wing
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Hennepin
Houston
Hubbard
Isanti
Itasca
Jackson
Kanabec
Kandiyohi
Kittson
Koochiching
Lac qui Parle
Lake
Lake of the Woods
Le Sueur
Lincoln
Lyon
Mahnomen
Marshall
Martin
McLeod
Meeker
Mille Lacs
Morrison
Mower
Murray
Nicollet
Nobles
Norman
Olmsted
Otter Tail
Pennington
Pine
Pipestone
Polk
Pope
Ramsey
Red Lake
Redwood
Renville
Rice
Rock
Roseau
Scott
Sherburne
Sibley
St. Louis
Statewide
Stearns
Steele
Stevens
Swift
Todd
Traverse
Wabasha
Wadena
Waseca
Washington
Watonwan
Wilkin
Winona
Wright
Yellow Medicine
Recipient
Tetra Tech
2017 Fiscal Year Funding Amount
$80,038
Fund Source

This project will conduct a 2017 revision of the South Fork Crow River, North Fork Crow River and Sauk River Watershed Hydrological Simulation Program FORTRAN (HSPF) models and review of the Pine River Watershed HSPF model.

Aitkin
Carver
Cass
Crow Wing
Douglas
Hennepin
Hubbard
Kandiyohi
McLeod
Meeker
Pope
Renville
Sibley
Stearns
Todd
Wright
Recipient
Emmons & Olivier Resources (EOR)
2013 Fiscal Year Funding Amount
$51,477
Fund Source

This project will develop a TMDL for all impaired lakes within the Crow Wing Watershed by furthering data collection in the watershed, analysis of data, allocation calculations, and introducing outreach and stakeholder participation activities.

Wadena
Crow Wing
Clearwater
Todd
Cass
Otter Tail
Becker
Morrison
Hubbard
Recipient
Emmons & Olivier Resources
2012 Fiscal Year Funding Amount
$15,041
Fund Source

This first year of the project will collect available data relevant to the TMDL development, determine the data sets best suited for the TMDL development. Gain a better understanding of the watershed and impaired lakes, and assessment of all potential sources (internal and external) of the causes of lake impairment. EOR will also review the data produced by the MPCA for the impairment assessment for each of the lakes during year 1 of the project.

Becker
Cass
Clearwater
Crow Wing
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
Wenck Associates, Inc.
2012 Fiscal Year Funding Amount
$29,872
Fund Source

This project willl complete a final TMDL document that will be submitted to EPA for approval. Document will include Lake Osakis, Clifford Lake, Faille Lake, and Smith Lake impairments. A final technical memorandum describing the elements of the model framework and any deviations from the recommended construction methodology will be also be provided with the submission of the watershed models.

Douglas
Morrison
Otter Tail
Todd
Wadena
Recipient
Tetra Tech, Inc.
2012 Fiscal Year Funding Amount
$4,999
Fund Source

This project will develop and execute three point source related scenarios for the Chippewa River watershed using an existing HSPF watershed model. This project will also support the review of the HSPF Modeling Guidance Document.

Chippewa
Douglas
Grant
Kandiyohi
Otter Tail
Pope
Stearns
Stevens
Swift
Recipient
RESPEC
2012 Fiscal Year Funding Amount
$67,972
Fund Source

This project will construct three watershed framework models built using the Hydrologic Simulation Program FORTRAN. These executable models will simulate hydrology at the 12-digit HUC subbasin scale. An HSPF model will be built for each of the following 8-HUC watersheds: Red Lake River (09020303) and the Clearwater River (09020305).

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
RESPEC
2012 Fiscal Year Funding Amount
$49,996
Fund Source

This project will finalize HSPF watershed model construction by incorporating internal phosphorus loading in modeled lakes, run a suite of implementation scenarios and generate a GenScn project containing model output. The consultant will produce HSPF watershed models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will deliver all modeling files for baseline and implementation scenarios and provide a GenScn project containing model output.

Becker
Carver
Cass
Clearwater
Crow Wing
Douglas
Hennepin
Hubbard
Kandiyohi
McLeod
Meeker
Morrison
Otter Tail
Pope
Renville
Sibley
Stearns
Todd
Wadena
Wright
Recipient
Barr Engineering
2013 Fiscal Year Funding Amount
$94,683
Fund Source

This project will complete a Watershed Restoration and Protection Plan for the Lower St. Croix River that provides quantitative pollutant load reduction estimates and a set of pollutant reduction and watershed management strategies to achieve water quality standards for all impairments within the watershed, and that are understood and adoptable by local units of government and other stakeholders.

Anoka
Chisago
Isanti
Pine
Ramsey
Washington
Recipient
Emmons & Olivier Resources
2013 Fiscal Year Funding Amount
$99,355
Fund Source

This project will complete a pollutant source identification and subwatershed information report and support the development of a Draft Restoration and Protection Plan (RAPP). It will also support the devlopment of a Implementation Plan that will identify target areas for BMP implementation for bacteria reductions.

Anoka
Benton
Carver
Crow Wing
Dakota
Douglas
Hennepin
Kandiyohi
McLeod
Meeker
Mille Lacs
Morrison
Pope
Ramsey
Sherburne
Sibley
Stearns
Todd
Washington
Wright