Minnesota's Legacy

All Projects

Showing 1 - 40 of 60 | Export projects
Recipient
Pennington SWCD
2014 Fiscal Year Funding Amount
$91,300
Fund Source

The City of Thief River Falls drinking water is taken from a 135 acre reservoir that is supplied by the Thief River and Red Lake River. Sedimentation and erosion have significant impacts to the waters in Pennington County. The reservoir is filling with sediment faster than expected. Buffers and side water inlets will help reduce sediment and improve water quality for these types of erosion. Buffers would also reduce nutrients polluting the waters in Pennington County and have a beneficial impact to the dissolved oxygen impairment on both the Red Lake and Thief River.

Pennington
Recipient
Red Lake SWCD
2015 Fiscal Year Funding Amount
$21,860
Fund Source

The purpose of this Phase II Project is to advance the inventory process of the 103E drainage ditches where erosion, sediment, and/or nutrients are contributing substantially to water quality degradation, and prioritize sites for side water inlet control and/or buffer strip implementation.Through this project, Red Lake Watershed District, Red Lake County Ditch Authority, along with the Red Lake County SWCD, will be working together prioritizing county ditch systems (based upon water quality degradation and the amount of sediment loading that is occurring in the ditch systems), targeting whe

Red Lake
Recipient
Red Lake SWCD
2015 Fiscal Year Funding Amount
$277,500
Fund Source

Red Lake County Soil and Water Conservation District (SWCD) has targeted water quality improvement projects to twelve sites in the Black River, Cyr Creek, and Red Lake River Sub-Watersheds of the Red Lake River Watershed. Data analysis obtained from a variety of models identified which sub-watersheds were contributing to impairments, highlighted which fields in those sub-watersheds were contributing the most sediment, and even showed specific locations in the field which were most vulnerable to erosion.

Red Lake
Recipient
Mississippi Headwaters Board
2015 Fiscal Year Funding Amount
$81,000
Fund Source

The grant will use local data to develop stormwater planning options that prioritize, target, and measure the effectiveness of Best Management Practices and allow local city officials to make decisions on stormwater Best management Practices that reduce pollutants in the stormwatershed.

Aitkin
Cass
Crow Wing
Itasca
Recipient
Red Lake SWCD
2016 Fiscal Year Funding Amount
$102,020
Fund Source

Red Lake County SWCD will continue to work cooperatively with the Red Lake County Ditch Authority, and the landowners involved to reduce erosion and sedimentation, reduce peak flows and flooding, improve water quality, and protect drainage system efficiency for priority Chapter 103E drainage systems by installing thirty-seven multipurpose drainage management practices. The priority Chapter 103E drainage system is Judicial County Ditch 60.

Red Lake
Recipient
Itasca SWCD
2016 Fiscal Year Funding Amount
$141,000
Fund Source

This project is the first step toward a regional based implementation approach to reduce phosphorus and total suspended solids in the 12 cities on the Mississippi River. By the time this project is approved, a stormwater retrofit analysis will be completed for the cities, and the MHB will be discussing with them a strategic way to implement the study on a regional scale. By funding this project, you are encouraging the future implementation in a strategic and organized process.

Itasca
Recipient
Red Lake SWCD
2016 Fiscal Year Funding Amount
$194,000
Fund Source

The Red Lake River from County Ditch 96 (Pennington County) to where the Clearwater River enters the Red Lake River (Red Lake Falls) is on the TMDL Impaired Waters List for Turbidity. This reach is a high priority because of the high importance of the Red Lake River, which provides a domestic supply use of the water source and provides abundant recreational uses.

Red Lake
Recipient
Red Lake SWCD
2017 Fiscal Year Funding Amount
$42,600
Fund Source

Red Lake River currently does not meet state water quality standards due to high amounts of sediment. For this project, the Red Lake County Soil and Water Conservation District will continue to work cooperatively with the Red Lake County Ditch Authority, and the landowners to reduce erosion and sedimentation into Judicial County Ditch 66. Judicial County Ditch 66 outlets into Cyr Creek which outlets directly into the Red Lake River.

Red Lake
Recipient
Aitkin County
2015 Fiscal Year Funding Amount
$13,946
Fund Source

The Aitkin County Soil and Water Conservation District will partner with the Minnesota Pollution Control Agency and local volunteers to conduct water quality monitoring in high priority areas of the Upper Mississippi River Grand Rapids Watershed. Five lakes will be sampled, including Savanna, Shumway, Loon, Hay, and Washburn. Through this effort we will obtain information that will be useful in assessing the health of this watershed. This will be valuable in planning for future restoration and protection efforts that will ensure good water and environmental quality for Aitkin County.

Aitkin
Recipient
Aitkin County Soil & Water Conservation District
2013 Fiscal Year Funding Amount
$4,851
Fund Source

This project will complete a Total Maximum Daily Load Implementation Plan for the watersheds of Big Sandy and Minnewawa Lakes. This restoration plan will provide pollution reduction and watershed management strategies that are developed with input from stakeholders in the watersheds.

Aitkin
Carlton
St. Louis
Recipient
Polk, West SWCD
2015 Fiscal Year Funding Amount
$45,000
Fund Source

Phase II of the Burnham Creek Watershed Restoration Project will conduct inventory on 2,050 acres, 85.4 miles of ditch channel within the Burnham Creek Watershed of West Polk County. This inventory includes surveying, assembling all available GIS data, ArcMap, LiDAR, review aerial photography, location of tile intakes, determine size of the erosion sites, and prioritization of severity. The district will partner with the Area DNR Hydrologist and the Polk County Highway Department-Drainage & Ag Inspector to verify data and identify any additional ditch segments.

Polk
Recipient
Carlton SWCD
2015 Fiscal Year Funding Amount
$32,330
Fund Source

The Conservation Dashboard will provide the Carlton Soil and Water Conservation District, its water plan, and local landowners a system to target, prioritize, and measure resource needs and effective conservation implementation within the subwatersheds of Carlton County. The Dashboard will identify where data gaps exist, translate the data in a way that partners and landowners easily understand, and insert Best Management Practice recommendations onto the county webmapping tool, used by citizens.

Carlton
Recipient
Carlton County Soil and Water Conservation District
2015 Fiscal Year Funding Amount
$10,061
Fund Source

Carlton County Soil and Water Conservation District (SWCD), Carlton County Planning and Zoning, and local volunteers will lead an effort to collect Total Phosphorus, Chlorophyll-A, and secchi disc transparency data for the MPCA Surface Water Assessment Grant (SWAG) project on following six lakes: Eagle Lake, Upper (North) Island Lake, Lower (South) Island Lake, Tamarack Lake, Cole Lake, and Cross Lake.

Carlton
Recipient
Cass County Environmental Services Department
2010 Fiscal Year Funding Amount
$198,971
Fund Source

This monitoring project includes lake and stream monitoring and encompasses all of Cass County, and surrounding counties. The project will obtain water quality data for streams; in 2009, lakeshed assessments indicated that many surface waters throughout the county were data deficient. This project will address the need for sufficient data on a county-wide basis and fulfill the State’s intensive watershed monitoring program goals by obtaining water quality data at targeted lake and stream sites.

Aitkin
Becker
Beltrami
Carlton
Cass
Clearwater
Crow Wing
Hubbard
Itasca
Morrison
Otter Tail
St. Louis
Todd
Wadena
Recipient
Pennington SWCD
2016 Fiscal Year Funding Amount
$196,500
Fund Source

The Pennington SWCD has collaborated with Pennington County for several years to identify priority County Ditch reaches that are in need of buffers and grade stabilization structures. This cooperative effort has resulted in the reduction of nutrient and sediment delivery to the Red Lake River Watershed. Pennington SWCD has recently inventoried buffer and grade stabilization needs on three different County Ditch systems: 96, 21 and 16. A total of 23 miles of ditch has been inventoried, 15 miles of buffer are needed along with 81 grade stabilization structures.

Pennington
Recipient
Pennington SWCD
2016 Fiscal Year Funding Amount
$90,728
Fund Source

Sediment and water quality issues are local priorities within the Thief River and Red Lake River watersheds, which have their confluence in the city of Thief River Falls. The 1W1P effort underway in the Red Lake River Watershed will identify opportunities for projects and practices that are targeted and result in measurable water quality benefits throughout the watershed using PTMApp.

Pennington
Recipient
RESPEC
2012 Fiscal Year Funding Amount
$67,972
Fund Source

This project will construct three watershed framework models built using the Hydrologic Simulation Program FORTRAN. These executable models will simulate hydrology at the 12-digit HUC subbasin scale. An HSPF model will be built for each of the following 8-HUC watersheds: Red Lake River (09020303) and the Clearwater River (09020305).

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
Red Lake Watershed District (RLWD)
2011 Fiscal Year Funding Amount
$150,000
2013 Fiscal Year Funding Amount
$109,900
Fund Source

This project Phase will collect data, background information, and watershed characteristics within the Red Lake River watershed. This information will be documented within the framework of early draft TMDL Reports (with background information, but no load calculations) for impaired reaches within this watershed and early draft protection plans for the areas in the watershed that are not currently impaired.

Beltrami
Clearwater
Marshall
Pennington
Polk
Red Lake
Recipient
Pennington SWCD
2017 Fiscal Year Funding Amount
$332,749
Fund Source

Numerous County ditch systems in Pennington County end at a natural drainage prior to outleting into a river or other watercourse and these outlets can be in a very erosive state. The goal of this project is to inventory these systems to determine needs and prioritize projects for implementation.

Pennington
Recipient
Minnesota Department of Health
2019 Fiscal Year Funding Amount
$1,100,000
2018 Fiscal Year Funding Amount
$1,100,000
2017 Fiscal Year Funding Amount
$1,100,000
2016 Fiscal Year Funding Amount
$1,100,000
2015 Fiscal Year Funding Amount
$1,150,000
2014 Fiscal Year Funding Amount
$1,150,000
2013 Fiscal Year Funding Amount
$1,020,000
2012 Fiscal Year Funding Amount
$1,020,000
2011 Fiscal Year Funding Amount
$744,717
2010 Fiscal Year Funding Amount
$250,291
Fund Source

The Drinking Water Contaminants of Emerging Concern (CEC) program identifies environmental contaminants for which current health-based standards currently do not exist or need to be updated, investigate the potential for human exposure to these chemicals, and develop guidance values for drinking water. Contaminants evaluated by CEC staff include contaminants that have been released or detected in Minnesota waters (surface water and groundwater) or that have the potential to migrate to or be detected in Minnesota waters.

Statewide
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$99,986
Fund Source

This project will finalize HSPF watershed model construction and complete the calibration/validation process. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval.

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$253,710
Fund Source

The goal of this project is to construct, calibrate, and validate five Hydrologic Simulation Program FORTRAN (HSPF) watershed models. The outcome will be HSPF models that can readily be used to provide information to support conventional parameter TMDLs. These models will generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.

Wright
Todd
Stearns
St. Louis
Sherburne
Morrison
Mille Lacs
Meeker
Kanabec
Itasca
Isanti
Chisago
Cass
Carlton
Benton
Anoka
Aitkin
Recipient
Headwaters Science Center
2015 Fiscal Year Funding Amount
$36,053
Fund Source

This project will sample and monitor 18 sites for chemical, physical and bacteriological parameters for two years in coordination with the 2015-16 Surface Water Assessment Grant (SWAG) work plan proposal. Headwaters Science Center (HSC) will be the project lead and recruit volunteer students from Trek North, Bug-O-Nay-Ge-Shig, and Deer Lake high schools as well as to two AmeriCorps volunteer crews. An experienced Minnesota Pollution Control Agency (MPCA) environmental scientist will be the project lead responsible for oversight and full compliance to MPCA protocols.

Beltrami
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$396,300
Fund Source

The goal of this project is to continue and finalize HSPF watershed model construction and complete the calibration/validation process.

Aitkin
Anoka
Becker
Beltrami
Benton
Carlton
Cass
Clearwater
Crow Wing
Hubbard
Isanti
Itasca
Kanabec
Meeker
Mille Lacs
Morrison
Sherburne
St. Louis
Stearns
Todd
Wright
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$95,000
Fund Source
The goal of this project is to continue and finalize HSPF watershed model construction and complete the calibration/validation process.
Beltrami
Clearwater
Marshall
Pennington
Polk
Red Lake
Recipient
Itasca County Soil and Water Conservation District
2015 Fiscal Year Funding Amount
$52,126
Fund Source

"This proposal is to monitor all MPCA target streams and lake sites in the Upper Mississippi Grand Rapids watershed located within Itasca County. Itasca County SWCD has been working collaboratively with MPCA in its intensive watershed monitoring effort on a number of grants to assess the overall health of our water resources and to identify waters with impairments along with those in need of additional protection to prevent future impairments.

Itasca
Recipient
Crow Wing County
2015 Fiscal Year Funding Amount
$67,300
Fund Source

This project is a cooperative effort between Crow Wing and Itasca County to contract with RMB Laboratories to generate 65 lake assessment/trend analysis reports. The watershed protection model is an innovative and proactive approach to water resource management which is geared towards prioritizing areas of concern, targeting implementation strategies, and measuring their effectiveness. These assessments are also useful and understandable tools for lake associations and the public.

Crow Wing
Itasca
Recipient
Itasca SWCD
2016 Fiscal Year Funding Amount
$34,000
Fund Source

Itasca County is about to begin their water plan update process, which will be finished in 2017. This plan will be watershed protection oriented following a similar format to what Crow Wing County has done. We are currently in the process of have lake screening reports completed for 38 Itasca County lakes, and we would like to continue this program to add reports for an additional 34 lakes.

Itasca
Recipient
St. Louis County
2016 Fiscal Year Funding Amount
$200,000
Fund Source

St. Louis County's Comprehensive Water Management Plan Update 2010-2020 identifies providing financial assistance to qualifying homeowners to upgrade or replace failing septic systems as a Priority 2 action. Funds from the FY-16 Clean Water Fund Projects and Practices Grant will be used to provide funding to low-income homeowners to repair or replace SSTS identified as Imminent Threat to Public Health (ITPH) within the following watersheds: Lake Superior South, St.

St. Louis
Recipient
St. Louis County
2017 Fiscal Year Funding Amount
$205,000
Fund Source

This project will create a culvert inventory database for county and township roads in the southwest portion of St. Louis County that contains the St. Louis River watershed. Data will be used by the County Public Works Department to identify and prioritize stream crossings in need of replacement or increasing upstream storm water retention to reduce the potential for culvert failure during large runoff events, factoring in stream health (fish habitat and passage, sediment transport and hydrologic connection) while protecting infrastructure.

St. Louis
Recipient
Aitkin County Soil and Water Conservation District
2016 Fiscal Year Funding Amount
$200,000
Fund Source

This project will focus on creating a watershed identity, monitoring & assessment, stressor ID assistance, Total Maximum Daily Load (TMDL) report development, Watershed Restoration & Protection Strategy (WRAPS) report development, watershed prioritization and targeting, and the continuation of the Civic Engagement components of the project. Currently, this watershed has seven listed conventional impairments (Lake Eutrophication); however, it is possible that additional stream impairments (up to four) may be identified during the IWM process.

Aitkin
Recipient
Minnesota Pollution Control Agency
2014 Fiscal Year Funding Amount
$297,169
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Pollution Control Agency
2015 Fiscal Year Funding Amount
$287,628
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Pollution Control Agency
2012 Fiscal Year Funding Amount
$5,500,000
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities within the described priority watersheds.

Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support.

Aitkin
Beltrami
Carver
Cass
Clearwater
Crow Wing
Dodge
Goodhue
Hennepin
Hubbard
Kandiyohi
Lake of the Woods
Marshall
McLeod
Meeker
Mower
Olmsted
Pennington
Polk
Red Lake
Renville
Rice
Roseau
Sibley
Steele
Wabasha
Wright
Recipient
Minnesota Department of Natural Resources
2011 Fiscal Year Funding Amount
$140,000
Fund Source

The Minnesota Department of Natural Resources will coordinate the collection of high-resolution elevation data for northeastern portion of Minnesota using Light Detection and Ranging (LIDAR) systems. The geographic area of the work includes Minnesota counties of Carlton, Cook, Lake, and St. Louis Counties and that portion of Koochiching County that comprises Voyageurs National Park.

Carlton
Cook
Koochiching
Lake
St. Louis
Recipient
United States Geological Survey (USGS)
2012 Fiscal Year Funding Amount
$10,800
2013 Fiscal Year Funding Amount
$11,119
Fund Source

This project will collect real-time parameter data for specific conductance, water temperature, pH, dissolved oxygen, turbidity and stream flow at the United States geological Survey (USGS) gaging stations located at Fargo, ND and Grand Forks, ND on the Red River of the North; and publish the data both on the USGS NWIS website and in the USGS Annual Report.

Beltrami
Clay
Clearwater
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Wilkin
Recipient
US Geological Survey
2019 Fiscal Year Funding Amount
$12,880
Fund Source

US Geological Survey (USGS) will perform real-time water quality monitoring at its stations located in Fargo and Grand Forks. The Minnesota Pollution Control Agency co-sponsors this work along with USGS, North Dakota Dept. of Health, the cities of Fargo, Moorhead, Grand Forks, and East Grand Forks.

Clay
Polk
Recipient
Red River Watershed Mgmt Board
2014 Fiscal Year Funding Amount
$30,636
Fund Source

As part of the FY 2012 funding cycle, the Board of Water and Soil Resources granted funds for development of the Water Quality Decision Support Application (WQDSA). The WQDSA will provide land and water managers with geospatial data and online tools to prioritize, market, and implement actions on the landscape to achieve water quality objectives identified in local and state water plans and to ensure that public funding decisions are strategic and defensible.

Becker
Clay
Mahnomen
Norman
Polk
Recipient
Red Lake WD
2015 Fiscal Year Funding Amount
$38,700
Fund Source

The Red Lake Watershed District will create an inspection database for 103E ditches under their drainage authority. The district will acquire a database software solution to conduct field inspections and to track ditch maintenance projects and use the software to facilitate compliance with state statutes. The project will also develop a process for completing the annual inspection and reporting requirements under Statue 103E.

Beltrami
Clearwater
Marshall
Pennington
Polk
Red Lake
Recipient
Polk, West SWCD
2017 Fiscal Year Funding Amount
$103,000
Fund Source

The purpose of the project is to reduce the amount of sediment entering Burnham Creek, which is a tributary of the Red Lake River within the Red River Basin. The Red Lake River is classified as a source water protection area for the City of East Grand Forks and currently does not meet state water quality standards for sediment. The goal of this project is to install one grade stabilization structure within the channel which outlets into the Burnham Creek channel and two side water inlets with buffers.

Polk