Minnesota's Legacy

All Projects

Showing 1 - 8 of 8 | Export projects
Recipient
Becker SWCD
2018 Fiscal Year Funding Amount
$398,000
Fund Source
Becker
Recipient
Carver County
2017 Fiscal Year Funding Amount
$10,000
Fund Source

The Carver County Planning and Water Management Department (PWM) has an active well sealing cost share program. Following the adoption of the updated County Groundwater Plan in February of 2016, the Carver County Board of Commissioners moved to accelerate the program to encourage landowners to seal abandoned wells. Carver County is looking to supplement existing funds, as demand is expected to increase. With this additional funding, it is the goal of Carver County PWM to seal an additional 15 wells county wide.

Carver
Recipient
Carver SWCD
2017 Fiscal Year Funding Amount
$120,935
Fund Source

The purpose of this project is to install prioritized and targeted best management practices on the Carver County Ditch #6 drainage system that drains directly into Bevens Creek. Bevens Creek does not meet state water quality standards for sediment. The goal of the project is to install 6 grade stabilization structures, 5 grassed waterways, and 2 water and sediment control basins that have been identified through GIS LIDAR applications and field verified along with landowner support.

Carver
Recipient
Otter Tail, East SWCD
2020 Fiscal Year Funding Amount
$167,600
Fund Source
Otter Tail
Recipient
Otter Tail, East SWCD
2017 Fiscal Year Funding Amount
$471,000
Fund Source

The purpose of this project is to develop a detailed tool that can be used in all watersheds within the Otter Tail and Becker counties to prioritize, target, and measure implementation practices at the field scale. The PTM App will significantly increase the targeting capabilities in Otter Tail and Becker Counties. The Watershed Restoration and Protection Strategy has not been completed for Otter Tail County, yet, and the PTM App will be able to assist targeting and prioritizing when those documents are created.

Becker
Otter Tail
Recipient
Buffalo-Red River WD
2017 Fiscal Year Funding Amount
$168,000
Fund Source

This project will result in the development of three critical pieces of information. They include: 1. Development of restoration and protection strategies for all waterbodies in the district relative to the State's Non-point Source Funding plan 2. Use of PTMApp to tie the WRAPs implementation tables from the Buffalo and Red River Watersheds to targeted on-the-ground projects and practices that will provide measurable water quality improvements, and 3.

Becker
Clay
Otter Tail
Wilkin
Recipient
Otter Tail, West SWCD
2017 Fiscal Year Funding Amount
$54,800
Fund Source

Realizing the need for increased technical capacity in the field offices, the Becker, East Otter Tail and West Otter Tail Soil and Water Conservation Districts have developed an agreement that will increase technical capacity while minimizing costs to each district. The first step was taken in this agreement through the recent hire of a shared engineer. Currently, minimal survey grade equipment is owned by the districts. This grant will be used to purchase an integrated survey system.

Becker
Otter Tail
Recipient
Becker SWCD
2017 Fiscal Year Funding Amount
$328,159
Fund Source

The Upper Buffalo River Sediment Reduction Project area lies in the first major land use transition within the buffalo's flowage, where intact forests and modestly developed lakes give way to altered hydrology and tilled fields of highly productive soils near the top of the Red River Basin. This abrupt change in land use within the watershed is directly linked to stream impairments within the project area.

Becker